1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review OTEC Cold Water Pipe-Platform Sub-System Dynamic Interaction Validation Lockheed.

Slides:



Advertisements
Similar presentations
Project L.O.F.T. Report May 2007 through October 2007 Creating a design to meet stakeholder desires and dissolve our current set of interacting problems.
Advertisements

EMS Checklist (ISO model)
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review The Water-to-Wire (W2W) Project Dr. Edward C. Lovelace Free Flow Power
Roadmap for Sourcing Decision Review Board (DRB)
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review M3 Wave Energy Systems (TRL System) PI: Mike Morrow M3 Wave Energy Systems.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Marine Energy Technology Advancement Partnership (METAP) Hoyt Battey DOE Water.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Schneider Linear hydroEngine ™ (SLH) Timing Belt Powertrain PI: Abe Schneider.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Advanced Anchoring Technology Dallas Meggitt Sound & Sea Technology, Inc.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Active Flow Control on Bidirectional Rotors for Tidal MHK Applications C.P. van.
TURNER-FAIRBANK HIGHWAY RESEARCH CENTER NDE Research Ongoing Projects and Response Based Load Rating The Office of Research, Development, and Technology.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Deployment and Testing of the Alden Fish-Friendly Turbine by EPRI, Alden Research.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Active Acoustic Deterrence of Migratory Whales Steve Kopf, Program Manager Pacific.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Water Use Optimization: Hydrologic Forecasting Presenter: Mark Wigmosta Organization:
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review River Devices to Recover Energy with Advanced Materials(River DREAM) Brent Crenshaw.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review 2011 Tidal Energy System for On-shore Power Generation Dr. Allan Bruce Sunlight.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Benchmark Modeling of the Near- field and Far-field Wave Effects of Wave Energy.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Siting Study Framework and Survey Methodology for Marine and Hydrokinetic Energy.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Sustainable Small Hydropower Innovative System Testing (1.2) Department of Energy,
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Modular Wave Energy Transfer (WET) Jane Vvedensky Shift Power Solutions
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Aquantis 2.5 MW Ocean-Current Generation Device- AWP Alex Fleming: PI Dehlsen.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Wave Energy Resource Assessment and GIS Database for the U.S. Paul T. Jacobson.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review ADVANCED INTEGRATION OF POWER TAKE-OFF IN VORTEX INDUCED VIBRATIONS AQUATIC CLEAN.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Advanced, High Power, Next Scale, Wave Energy Conversion Device Dr. Philip R.
1 | Wind and Water Power Programeere.energy.gov Development of a wave-actuated electric power take-off device 2011 Water Power Peer Review Meeting Development.
Process Engineer’s Role in Project Management Dr Abdullah Malik.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review 51-Mile Hydroelectric Power Project PI: Jim Gordon Earth By Design, Inc.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review The Development of Open, Water-Lubricated Polycrystalline Diamond Thrust Bearings.
Release & Deployment ITIL Version 3
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review A First Assessment of U.S. In-Stream Hydrokinetic Energy Resources Since the.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Sensor Fish Redesign Collaboration Z. (Daniel) Deng Thomas J. Carlson Pacific.
Effective Methods for Software and Systems Integration
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Reedsport PB150 Deployment and Ocean Test Project Dr. Philip R. Hart Ocean Power.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Northwest National Marine Renewable Energy Center Belinda A. Batten Oregon State.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Acoustic Monitoring of Beluga Whale Interactions with Cook Inlet Tidal Energy.
S/W Project Management
1 Module 4: Designing Performance Indicators for Environmental Compliance and Enforcement Programs.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review WET-NZ Multi-Mode Wave Energy Converter Advancement Project Justin Klure, Program.
Module 3 Develop the Plan Planning for Emergencies – For Small Business –
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review A-WEC Franc Mouwen Wavebob LLC November 2011.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review OCGen™ Module Mooring Project Jarlath McEntee Ocean Renewable Power Company
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Ocean Thermal Energy Extraction Visualization Matthew Ascari Lockheed Martin.
Requirements Engineering CSE-305 Requirements Engineering Process Tasks Lecture-5.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review PB500, 500kW Utility-Scale PowerBuoy Project Dr. Philip R. Hart Ocean Power Technologies.
What is a Business Analyst? A Business Analyst is someone who works as a liaison among stakeholders in order to elicit, analyze, communicate and validate.
1 Project Management Introduction. 2 Chap 1 What is the impact? 1994: 16% of IT projects completed “On-Time” 2004 : 29% of IT projects “On- Time” 53%
Product Documentation Chapter 5. Required Medical Device Documentation  Business proposal  Product specification  Design specification  Software.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Sustainable Small Hydropower System and Component Development (1.1) Department.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Integrated Basin Scale Hydropower Opportunity Assessment Initiative Simon Geerlofs.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Cycloidal Wave Energy Converter TRL Advancement to Level 4 Dr. Stefan G. Siegel,
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review THOR’ s Power Method for Hydrokinetic Devices Turner Hunt THOR Energy Group LLC.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Environmentally Benign and Permanent Modifications to Prevent Biofouling on Marine.
Version, Date, POC Name 1 Purpose: Concisely state the scientific objective of the proposed basic research proposal. Product/Results: Identify the research.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Assessment of Energy Production Potential from Ocean Currents along the United.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Poncelet Kinetics RHK100 Prototype Steven Selvaggio Whitestone Power and Communications.
1 | Program Name or Ancillary Texteere.energy.gov Percheron Power, LLC’s Proof of Power Project on Potholes East Canal (POP ‐ PEC) 2011 Water Power project.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review An Assessment of Lifecycle Cost in the U.S. over Time Mirko Previsic RE Vision.
<Contract # or Subproject Name> IBR In-brief
Project Estimation techniques Estimation of various project parameters is a basic project planning activity. The important project parameters that are.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Assessment of Energy Production Potential from Tidal Streams in the United States.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Abrasion Testing of Critical Components of Hydrokinetic Devices Monty Worthington.
1 BROOKHAVEN SCIENCE ASSOCIATES CF FY09 Work Plan & Schedule Martin Fallier, Conventional Facilities Division Director CFAC Review March 10-11, 2009.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review MHK MA\Categorizing and Evaluating the Effects of Stressors M. Grippo and I.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Modeling the Physical and Biochemical Influence of Ocean Thermal Energy Conversion.
Continual Service Improvement Methods & Techniques.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Assessment of the Environmental Effects of Hydrokinetic Turbines on Fish: Desktop.
Software Architecture Architecture represents different things from use cases –Use cases deal primarily with functional properties –Architecture deals.
Water Power Peer Review
Principal Investigator ESTCP Selection Meeting
Principal Investigator ESTCP Selection Meeting
Asset Manager Job summary: Essential functions of the job:
Presentation transcript:

1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review OTEC Cold Water Pipe-Platform Sub-System Dynamic Interaction Validation Lockheed Martin Corporation /02/2011 Matthew Ascari

2 | Wind and Water Power Programeere.energy.gov Purpose, Objectives, & Integration Project Purpose: Perform scale model testing of the OTEC platform and relatively large diameter cold water pipe in a dynamically controlled model basin facility to validate and improve existing dynamic computer models of the system. [Describe the challenges, barriers, knowledge gaps, or problems that this project addresses.] Application of existing numerical modeling methods to analyze the OTEC system needs to be validated to minimize the risk to a pipe in the first at-sea pilot plant and in subsequent commercial plants. [Describe how solving this problem relates to the Program’s mission and objectives.] Current Cold Water Pipe designs are based on fatigue and survival loads derived entirely from numerical models that have not been totally validated for a semi-submersible platform and CWP combination wherein the mass of the CWP is approximately equal to the platform. This is not normally the case for drilling and production risers used in offshore oil and gas production.

3 | Wind and Water Power Programeere.energy.gov Technical Approach [Describe the technical approach or methods used to achieve the project objective(s).] Subject a 1:50 scale model of the platform and cold water pipe to test conditions produced in a Model Basin facility. Analyze results and compare them to the numerical model predictions for this dynamic relationship. [Identify key issues currently being addressed and their significance.] Team is looking at ways to accurately scale the cold water pipe properties such as bending stiffness, and how to reliably measure the responses in a way suitable for validation of numerical models. [Emphasize unique aspects of approach.] Numerical models will “model the model”, i.e. the calibrated model properties will be used to construct the numerical model. Subsequently, the numerical model will be used to predict the behavior before the tests are run, i.e. the modeler will have no knowledge of the responses prior to executing the numerical model. This is called “blind analysis”. Subsequently, the numerical model will be modified to account for differences in the two, and a “best practices” document will be prepared to insure future modelers will properly analyze the CWP and platform behavior.

4 | Wind and Water Power Programeere.energy.gov Plan, Schedule, & Budget Schedule: Initiation date: 4/2011 Planned completion date: 11/2012 –Date reflect a 6 month delay of contract start due to specific negotiation of terms. Model Basin availability is also a potential impact to schedule. [Milestones for FY10 and FY11] Development of Technical Specification and Selection of model basin facility for scale model testing. [Go/no-go decision points for FY12 and FY13] Scale Model Construction and Basin Testing Budget: The current planned budget is still accurate and the team is working with three model basin facilities in a competitive selection process to ensure the best value for their part of this effort. As of 9/25/2011, roughly 6% or $61,474 of the $999,641 planned budget has been expended. Budget History FY2009FY2010FY2011 DOECost-shareDOECost-shareDOECost-share 0000 $36K$25K