Julien PALLUEL BE/CO/FERadiation To Electronics ‘1st Combined Workshop & School-Days’ June 2nd/ 3rd 20091 Julien Palluel BE/CO/FE.

Slides:



Advertisements
Similar presentations
Radiation Calendar first half 2009 (1): PSI60 MeV p March BLM electronics Automation equipment Interlocks (DRAFT description of the results in.
Advertisements

Future beyond CTF3: ESA/Electron testing January 27 th 2015 CLIC Workshop 2015: Future tests beyond CTF3 January 27 th 2015 Radiation Testing with CALIFES.
K. Potter RADWG & RADMON Workshop 1 Dec WELCOME TO THE 4th RADWG & RADMON WORKSHOP 1 December 2004.
The Latchup Monitor System, ESA Meeting, December 9 th 2014 R. Secondo, A Masi, R. Losito, P. Peronnard, R. D’Aguanno, R. Ferraro The Latchup Monitor System,
Elec467 Power Machines & Transformers
, a rad-tol FPGA-based WorldFIP agent E. Gousiou, P.Alvarez, E.van der Bij, G.Penacoba, J. Serrano | CERN TWEPP 2011 nan FIP.
CLIC Workshop 2009 Power Converters implications for CLIC machine protection 25/05/2015TE-EPC / S. Pittet1.
Danish Space Research Institute Danish Small Satellite Programme FH Space_Environment.ppt Slide # 1 Flemming Hansen MScEE, PhD Technology Manager.
CELeSTA CERN LATCHUP STUDENT SATELLITE TEST BOARD DEVELOPMENT AND CHARM PRELIMINARY RESULTS Raffaello Secondo ESA/ESTEC CERN Visit - DECEMBER 9 th 2014.
5 th LHC Radiation Day Radiation response of RADMON sensors T. Wijnands (TS/LEA), C. Pignard (TS/LEA) Acknowledgements : UCL Louvain-La-Neuve, PSI Villingen,
Mechanical and fluidic integration of scintillating microfluidic channels into detector system 1 Davy Brouzet 10 th September 2014.
LECC 2006 Ewald Effinger AB-BI-BL The LHC beam loss monitoring system’s data acquisition card Ewald Effinger AB-BI-BL.
TS-LEA, CERN, 1211 Geneva 23 1 T. Wijnands TS/LEA, C. Pignard AB-CORADWG-RADMON day – 1 December 2004 LHC Power Converters & Radiation T. Wijnands TS/LEA.
Oliver Bitterling  Introduction to the QPS  Radiation damage in electronic systems  Construction of radiation tolerant systems  Radiation test and.
COMPONENT TEST H4IRRAD 15 TH NOVEMBER 2011 G. Spiezia, P. Peronnard, G. Foucard, S. Danzeca, P. Gander, E. Fadakis (EN/STI/ECE)
*Supported by the EU FP7-PEOPLE-2012-ITN project nr , INFIERI, "Intelligent Fast Interconnected and Efficient Devices for Frontier Exploitation in.
DC-DC Buck Converter in Inner Detector Environment
LHC Beam Screen Heaters: System overview, consolidation needs and project planning 4 February TE-CRG/JCC (Beam Screen Heater Review) 1.
12004 MAPLD: 141Buchner Single Event Effects Testing of the Atmel IEEE1355 Protocol Chip Stephen Buchner 1, Mark Walter 2, Moses McCall 3 and Christian.
Electronics for PS and LHC transformers Grzegorz Kasprowicz Supervisor: David Belohrad AB-BDI-PI Technical student report.
M. Adinolfi – University of Oxford – MAPMT Workshop – Imperial College 27 June Rad-Hard qualification for the LHCb RICH L0 electronics M. Adinolfi.
Presented by Anthony B. Sanders NASA/GSFC at 2005 MAPLD Conference, Washington, DC #196 1 ALTERA STRATIX TM EP1S25 FIELD-PROGRAMMABLE GATE ARRAY (FPGA)
Semi-conductor Detectors HEP and Accelerators Geoffrey Taylor ARC Centre for Particle Physics at the Terascale (CoEPP) The University of Melbourne.
FP420 Tracker and Timing detector Low and high voltage supply INFN/Univ. of Torino Cern meeting, Jan
Radiation Test Facilities G. Spiezia. Engineering Department ENEN Radiation tests facilities  Radiation test in the accelerator sector  External facilities.
FIPDiag PSI Radiation test Presentation Radwg meeting August 2011 Julien Palluel BE/CO/FE 1 1.Devices Under test 2.Description of the test setup 3.Beam.
TE-MPE-EP, RD, 06-Dec QPS Data Transmission after LS1 R. Denz, TE-MPE-EP TIMBER PM WinCC OA Tsunami warning:
Radiation Tolerant Electronics New Policy? Ph. Farthouat, CERN.
Radiation Hardness Test Chip Matthias Harter, Peter Fischer Uni Mannheim.
Temporary irradiation facility at the CNGS beam D. Mcfarlane, T. Wijnands,
FP420 Low voltage supply Henning E. Larsen, INFN and Risoe 19. May 2006.
NanoFIP Progress Report Eva. Gousiou BE/CO-HT & the nanoFIP team RadWG 23Nov11.
ICALEPCS 2005 Advanced uses of the WorldFIP fieldbus for diverse communications applications within the LHC power converter* control system Quentin King.
FP420 Low and high voltage supply INFN/Univ. of Torino July A presentation intended to stimulate the discussion on which.
BLM AUDIT 2010Ewald Effinger BE-BI-BL BLM tunnel installation and data acquisition card (BLECF) Ewald Effinger AB-BI-BL.
1 CzajkowskiMAPLD 2005/138 Radiation Hardened, Ultra Low Power, High Performance Space Computer Leveraging COTS Microelectronics With SEE Mitigation D.
LHC Beam Loss Monitors, B.Dehning 1/15 LHC Beam loss Monitors Loss monitor specifications Radiation tolerant Electronics Ionisation chamber development.
DAQMB Status – Onward to Production! S. Durkin, J. Gu, B. Bylsma, J. Gilmore,T.Y. Ling DAQ Motherboard (DMB) Initiates FE digitization and readout Receives.
T. Lari – INFN Milan Status of ATLAS Pixel Test beam simulation Status of the validation studies with test-beam data of the Geant4 simulation and Pixel.
Numerical signal processing for LVDT reading based on rad tol components Salvatore Danzeca Ph.D. STUDENT (CERN EN/STI/ECE ) Students’ coffee meeting 1/3/2012.
Investigating latchup in the PXL detector Outline: What is latchup? – the consequences and sources of latchup – techniques to reduce latchup sensitivity.
R2E Availability October 17 th 2014 ADC and Common development options G. Spiezia.
1 Giuseppe G. Daquino 26 th January 2005 SoFTware Development for Experiments Group Physics Department, CERN Background radiation studies using Geant4.
1 Radiation worries in the cavern L.Jirdén
Monitoring and Diagnostics infrastructure & SW for LHC QPS WorldFIP first analysis Michel Arruat, Frank Locci, Julien Palluel BE/CO1.
11 JULY 2002Jacques Lefrancois1  History: Previous Montecarlo Calculations by V. Talanov I. Korolko=> about 100rads/year and about 10**9 neutrons/cm**2.
1 Single event upset test of the voltage limiter for the ATLAS Semiconductor tracker TSL Experiment Number: F151 distance between power supplies and modules.
TWEPP Paris, 09 Radiation Tests on the complete system of the instrumentation electronics for the LHC Cryogenics at the CNGS test facility Evangelia Gousiou.
ATLAS DCS Workshop on PLCs and Fieldbusses, November 26th 1999, H.J.Burckhart1 CAN and LMB in ATLAS u Controls in ATLAS u CAN u Local Monitor Box u Concept.
BLDC Motor Speed Control with RPM Display. Introduction BLDC Motor Speed Control with RPM Display  The main objective of this.
LHCf collaboration meeting, Nagoya, January 2009A. L. Perrot LHC news A. L. Perrot CERN, EN/MEF-LE LHCf collaboration meeting, Catania, 6 th July 2009.
Ketil Røed - LECC2005 Heidelberg Irradiation tests of the ALICE TPC Front-End Electronics chain Ketil Røed Faculty of Engineering, Bergen University.
RADWG Meeting April 2015 Salvatore Danzeca EN/STI/ECE.
TE-MPE-CP, RD, 28-Sep Problems with QPS DAQ Systems During LHC Operation, 1 st Results from 2010 CNRAD Tests R. Denz TE-MPE-CP.
The Data Handling Hybrid Igor Konorov TUM Physics Department E18.
CERN Converter Control Electronics Strategy for LHC Machine Electronics : Limitations & Risks
Matters arising RADWG - 3 July 2009
DerivFIP – Radiation test
Solid-State Cameras for LHC instrumentation
nanoFIP 5th WorldFIP Insourcing Meeting Progress Report
Rad (radiation) Hard Devices used in Space, Military Applications, Nuclear Power in-situ Instrumentation Savanna Krassau 4/21/2017 Abstract: Environments.
Feedback on two irradiation testing projects Emergency lights and TETRA system Elisa Guillermain
UNIT-IV Application of Special I.C’s.
nan FIP The project April Eva. Gousiou BE/CO-HT
Outline Introduction to LHC Power Converters Remaining Inventory Observed Availability New inventory – FGClite Cumulative & SEE Effects Maintenance.
2 Fraunhofer INT Euskirchen Germany
6th WorldFIP Insourcing Meeting
Irradiation Test of the Spartan-6 Muon Port Card Mezzanine
MICROFIP-Do we need further tests? 28th June 2011
Radiation Detectors for the PSS1 at ESS
Presentation transcript:

Julien PALLUEL BE/CO/FERadiation To Electronics ‘1st Combined Workshop & School-Days’ June 2nd/ 3rd Julien Palluel BE/CO/FE

Julien PALLUEL BE/CO/FERadiation To Electronics ‘1st Combined Workshop & School-Days’ June 2nd/ 3rd  WorldFIP Description and principle LHC problematic  RadHard Solutions Protection systems Re-initialisation systems Choice of components  Radiation tests : repeater Co/Co example Gammas radiations Protons tests

Julien PALLUEL BE/CO/FERadiation To Electronics ‘1st Combined Workshop & School-Days’ June 2nd/ 3rd  Description Maximum length of wiring ○ 8000m with a speed of 31.25Kb/s ○ 1000m with a speed of 1Mb/s ○ 500m with a speed of 2.5Mb/s 300 km of WorldFIP fieldbus  Consequences Repeaters RadHard Diagnostic Agent Rad-Hard (FIPDiag)

Julien PALLUEL BE/CO/FERadiation To Electronics ‘1st Combined Workshop & School-Days’ June 2nd/ 3rd  LHC problematic All elements must be RadHard ○ Protection against latch-up ○ Protection against single event ○ Lifetime under radiation : >200 Gy Components high life ○ Durability of the radiation tested cards

Julien PALLUEL BE/CO/FERadiation To Electronics ‘1st Combined Workshop & School-Days’ June 2nd/ 3rd  Protection against latch-up  Powercycle System Example : Repeater RadHard Protection system : cut the power line with a MOS power for 1 second after the detection of an overcurrent (ex threshold 4xInom)

Julien PALLUEL BE/CO/FERadiation To Electronics ‘1st Combined Workshop & School-Days’ June 2nd/ 3rd Principle of protection against latch-up: Schema of protection against latch-up:

Julien PALLUEL BE/CO/FERadiation To Electronics ‘1st Combined Workshop & School-Days’ June 2nd/ 3rd  Protection against latch-up Component reference ○ Cut-off element : MOS-FET OD 22-16V ○ Current measure : LMV 393 ○ Cut-off timer : CMOS 74HC4538

Julien PALLUEL BE/CO/FERadiation To Electronics ‘1st Combined Workshop & School-Days’ June 2nd/ 3rd  Protection against Single Event  module Re-initialisation Example : Repeater RadHard Protection system : inactivity of one of the two mediums, detected by the component FIELDRIVE generates a reset signal which is processed by an integrated function in the FPGA.

Julien PALLUEL BE/CO/FERadiation To Electronics ‘1st Combined Workshop & School-Days’ June 2nd/ 3rd  Protection against Single Event Up-set: Corruption of memory (address, configuration…) Example : FIPDiag module  re-initialisation of the software by a remote reset triggered by a specific message (255 characters)

Julien PALLUEL BE/CO/FERadiation To Electronics ‘1st Combined Workshop & School-Days’ June 2nd/ 3rd  Lifetime under radiation  selection of components not sensitive to radiation …) Example : Galvanic isolation provided by the transformer in place of optocoupler Repeater RadHard  A 5V supply is obtained from 230V sector. The regulation is linear (type regulator Balasta) with transformer and diode bridge.

Julien PALLUEL BE/CO/FERadiation To Electronics ‘1st Combined Workshop & School-Days’ June 2nd/ 3rd Principle of power supply: Schema of power supply :

Julien PALLUEL BE/CO/FERadiation To Electronics ‘1st Combined Workshop & School-Days’ June 2nd/ 3rd  Lifetime under radiation  selection of components not sensitive to radiation Example : Repeater RadHard  Repetition process embedded in a type ACTEL FPGA anti-Fuse resistant to radiation (Ref : Actel eX128 TQ100)  CMOS components  WorldFIP technology tested in 1998 (FIELDRIVE)

Julien PALLUEL BE/CO/FERadiation To Electronics ‘1st Combined Workshop & School-Days’ June 2nd/ 3rd  Lifetime under radiation Repeater RadHard  WorldFIP technology tested in 1998 (TCC2, mixed fields) Référence composant : ○ SSSB222 FIELDRIVE 0421A ○ FIELDTRx.S JMF /47 Currently these two components have evolved to a new technology that seems to be more sensitive to radiation. Tests are planned at CNGS !

Julien PALLUEL BE/CO/FERadiation To Electronics ‘1st Combined Workshop & School-Days’ June 2nd/ 3rd  Components turnover Period of production too short Solution  Use virtual device defined in VHDL and integrated in FPGA already tested Example : In-sourcing WorldFIP technology ○ Purchase technology WorldFIP VHDL ○ Adaptation to CERN needs ○ Realisation Project under the responsibility of Javier Serrano’s team

Julien PALLUEL BE/CO/FERadiation To Electronics ‘1st Combined Workshop & School-Days’ June 2nd/ 3rd

Julien PALLUEL BE/CO/FERadiation To Electronics ‘1st Combined Workshop & School-Days’ June 2nd/ 3rd General architecture of the card :

Julien PALLUEL BE/CO/FERadiation To Electronics ‘1st Combined Workshop & School-Days’ June 2nd/ 3rd  Gammas radiations tests at Pagure’s CEA, Saclay Conditions of irradiation ○ Cobalt-60 source ○ Total Irradiation of the card (active part) ○ Dose and period: 1h30 at 20Gy/h (2.60m from the source) 5h at 60Gy/h (1.51m from the source) ○ FIP Speed : 1MB/s. ○ MacroCycle period : 100ms ○ Variables : 2 (1xRead + 1xWrite on FIPDIAG)

Julien PALLUEL BE/CO/FERadiation To Electronics ‘1st Combined Workshop & School-Days’ June 2nd/ 3rd  Gammas radiations tests at Pagure’s CEA, Saclay Results : ○ 1) 20Gy/h irradiation No functionnal fault (Up-set, Latch-up and Reset) The overall current of the module remained constant at 147mA Test of the anti-latch-up was working well ○ 2) 60Gy/h irradiation No functionnal fault (Up-set, Latch-up and Reset) until 310Gy up where the module has stopped working. Remarks : ○ The overall current of the module has increased from 147mA to 152mA, then 147mA just before stop working. ○ We have made some power reset until the end of this test. The repeater stayed silent ○ Once testing is completed, after 5 minutes of rest, the module was working normally. Possible reason : the supply current has drained the trapped charges in MOS thresholds and allowed them to re-operate properly. In the LHC where the modules will experience a much lower fluence, it should therefore not have any operational defect related to gamma radiation.

Julien PALLUEL BE/CO/FERadiation To Electronics ‘1st Combined Workshop & School-Days’ June 2nd/ 3rd  Protons tests at Louvain,Belgium Conditions of irradiation ○ Proton beam 62 Mev ○ Flux between 5x10exp7 and 5x10exp8 P/cm2/s ○ Total Irradiation of the card (active part) ○ Speed : 2.5MB/s ○ MacroCycle period : 20ms ○ Variables : 2 (1xRead + 1xWrite on FIPDIAG)

Julien PALLUEL BE/CO/FERadiation To Electronics ‘1st Combined Workshop & School-Days’ June 2nd/ 3rd

Julien PALLUEL BE/CO/FERadiation To Electronics ‘1st Combined Workshop & School-Days’ June 2nd/ 3rd  Protons tests at Louvain,Belgium Results ○ 235gy (1 Up-Set seen) on first repeater ○ 512gy (2 Up-Sets seen) on second repeater before first faults ○ Overall current mainly constant ○ Test of the anti-latch-up was working well

Julien PALLUEL BE/CO/FERadiation To Electronics ‘1st Combined Workshop & School-Days’ June 2nd/ 3rd  Main repository  Repeater Rad Hard Presentations/Radiation Hard Repeater-ENG.pdf Presentations/Radiation Hard Repeater-ENG.pdf note pdf note pdf Modules/Repeater CU-CU Radiation Hard/Manuel Repeteur Cu_Cu-FR.pdf Modules/Repeater CU-CU Radiation Hard/Manuel Repeteur Cu_Cu-FR.pdf  FIPDiag Presentations/Fipdiag and FipADUC Modules-ENG.pdf Presentations/Fipdiag and FipADUC Modules-ENG.pdf

 Radiation  Répéteur  FPGA  Proton  Gamma  WorldFIP  Latch-up  Upset  Dose