CIRCUIT BREAKER FIRST TRIP TESTING Michael McCraney.

Slides:



Advertisements
Similar presentations
CONDITIONS FOR SUCCESSFUL INTERRUPTION:
Advertisements

Current Electricity - Symbols
Electrical Installation
Inspection & Preventive maintenance of breakers
12.1 Electricity at Home (Pages )
Chapter 12 Transformers. Chapter 12 Transformers.
INTO THE GRID A Study of the Power Grid
Understanding Electrical TransmissionDemonstration B2 A Guide to the National Grid Transmission Model Demonstration B2 Generating electricity.
Unit 4 – Electricity & Magnetism
During fault behavior of circuit breaker
Week 3 Electrical Circuits and Components. It’s a Radio!
Lesson 33 AC Generators.
INTRODUCTION TO SWITCHGEARS
Electricity and Conserving Resources
Unit Transformer Unit transformer are step up transformer which is connected to generating house & step up voltage from 15kV voltage to 132 voltage level.
1 PCA2 On-load Protection Condition Analyser. 2 PCA2 online testing concept Concept introduction: PCA2 is a new system test approach intended to save.
Current Electricity - Symbols Identify the Symbol.
Charging System Service
Chapter 7 SYSTEM PROTECTION
Electrical Electricity Fuses Relays Solenoids Electrical Testing
Lunch & Learn Project Presents to you: “The Electric Power Grid” By: Dexter Hypolite Electrical Engineer VIWAPA.
Freedom Combi Inverter
Electromagnets!Electromagnets! By Jack and Bella.
PRACTICAL ELECTRICITY
Chapter 16 DC Generators.
Lesson 10: Aircraft Electrical Systems
© 2008 Snap-on Incorporated; All Rights Reserved.
Lesson 9: Electrical Components
1 Power Quality Mary Santori, P.E. Senior Engineer September 12, 2013.
Power Plant Construction and QA/QC Section 7.4 – Hydroelectric Generators, Transformers and Controls Engineering Technology Division.
 Four Components of a circuit  Power supply  Conductor  Load device  Controlling device  Power Supply  Generator  Line source (wall outlet)  Transformer.
CIRCUITS AND CURRENT The build up of stationary electric charges (positive and negative) on two different surfaces. Caused by the TRANSFER of electrons.
Electrical Power J. Mitchell for AE-210. What Does Electrical Power Do? Provides Energy for Buildings Provides Energy for Buildings Usually all except.
Transformer Taking the ratio of the two equations
ELECTRICAL BASICS (Chapter 8) Electrical terms Electricity & magnetism Electricity Circuits Magnetism Electrical units Electric potential or eletromotive.
1 Motors and Generators ©Dr. B. C. Paul More Fun with Flux Mechanically Rotated Shaft Slip Rings Wires with brush contacts to slip rings Electromagnetic.
Basic Electrical Contactors.
Power Plant Construction and QA/QC Section 4.4 – In-Plant Electrical Distribution Engineering Technology Division.
Lesson Measuring and Calculating Electricity. Interest Approach § Have you or your parents ever been using several appliances in the kitchen and had a.
MAXIMUM POWER TRANSFER THEOREM
1 Distributed Generation and Power Quality-Continued.
Electricity Review Questions. How are charges transferred through conduction? By Direct Contact.
Electrical Power Distribution Information obtained from howstuffworks.com.
A Training Presentation On 132 KV GSS JAIPUR Submitted in partial fulfillment For the award of the degree of BACHELOR OF TECHNOLOGY Submitted To:- Submitted.
Main contacts closed – RED Colour with ON
Adapted from presentation developed by Scott Fausneaucht.
Presentation Topic: Circuit Breakers Represented to: Dr. M. Riaz Khan Represented by: M. Mujahid.
April 7, 2015 Washington, D.C. Area Low-Voltage Event Operations Training Seminar 2016 Erik Johnson System Operations Training (ERCOT)
Power System Protective Relaying-Part One
Electromechanical Relays Mechatronics ECE 5320 Assignment #1 Paul Smart.
III ALTERNATING CURRENT Electricity is generated, transmitted, and used in the form of three-phase alternating current (AC). The current strength of AC.
BUILDING LOAD NORMAL OPERATION 1. ATS are in normal position connected to utility source 2. All generator set paralleling circuit breaker open.
Test and Interpretation of Test Results
DC Generators.
Aircraft Electrical Systems
Electrical Circuits.
NERC Published Lessons Learned Summary
Relay operation Water level Indicator
Power Systems Protection Test Equipment
High Voltage Power Circuit Breakers
Chapter 7 © 2010, The McGraw-Hill Companies, Inc..
Dynamic Electricity.
Power System Protective Relaying-Part One
KELMAN CIRCUIT BREAKER ANALYZER
Series and Parallel Circuits
Presentation transcript:

CIRCUIT BREAKER FIRST TRIP TESTING Michael McCraney

Nameplate capacity of 12,222 Megawatts 24 generating facilities 4,527 breakers1,581 substations

Southern Company Transmission System

Some pics to use

What is first trip testing? Identifying lubrication problems in the mechanism. Identifying mechanical wear. Identifying control circuit malfunctions.

How does it work? The breaker is in service while the load is transferred. It captures: –Contact part / make time –DC supply current –DC supply voltage

Test Equipment

Typical Trip Shot Trip coil plunger strikes latch Auxiliary contact interrupts DC supply Voltage curve Trip Coil Current curve Main contact time

General Times & Measurements  Main Contacts (Trip): < 50 ms or 3 cycle  Main Contacts (Close): <200 ms or 12 cycle  Voltage Drop: <10%  Trip Latch: <5 ms between first & second shots  Auxiliary Contacts: <5 ms between first & second shots

What to look for… Latch –Increased latch time increases pole separation time. Aux. contact interruption time –Any delay in Acon time extends coil energizing time. Maximum current –High current could indicate wrong coil size or low current could show increased coil resistance. Voltage –Might indicate failing DC supply, insufficient wiring, or loose fuses. Main contact times –Could indicate worn mechanism or incorrect electrical wipe.

Past Trip Present Trip Latch time difference ACon Increased Trip Latch Friction: FK

Decreased Operating Speed: HVB Second Trip First Trip

Defective Battery Bank: GM6A Present First Trip Past First Trip

Faulty Auxiliary Contacts: 100-SFMT-40E Close Trip

Close Coil Fire:72-PM-31-20