KX/ISAG Lighting and Camera View Requirements for Increment 15 Jettison of the Early Ammonia Servicer Sean Keefe Donn Liddle Ed Oshel Val Papanyan Image Science & Analysis Group KX/Office for Human Exploration Science February 28,
Assumptions 2 EAS Removal Position (MT as WS 4, SSRMS on MBS PDGF 2) SRSYSPEPWPWYWR Current EAS jettison coordinates in cm and degrees, relative to ISSACS: XYZPitchYawRoll Data from Ed Birchnall, Mission Controller, Robotics Systems, 1/26/07
2 EAS Jettison Envelope: Length: ( ) = ” (includes soft dock latch/capture mechanism) Width: ( ) = ” (includes handrails & cables) Height: ” (includes grapple fixture) Metadata: CAD dwg. below provided by Boeing 1/24/07 Assumptions
Early Ammonia Servicer (EAS) on P6 Truss fwd 3
Camera Parameters Pan Tilt Zoom CP_3 CP_9 CP_
S1 ETVCG camera CP3 view at t 0 3
S1 ETVCG camera CP3 view at t s 3
P1 ETVCG camera CP9 view at t 0 3
P1 ETVCG camera CP9 view at t s 3
US Lab ETVCG camera CP13 view at t 0 3
US Lab ETVCG camera CP13 view at t s 3
Lighting CP_3 – On CP_9 – On CP_13 – Off Helmet Lights - Optional
ffurther questions? CContact Sean Keefe, Research Scientist ((281) IIIImage Science & Analysis Group KKX/Office for Human Exploration Science