Calypso / Titan / Octopus 2nd Stage Regulator. Calypso / Titan 2 nd Stage New cosmetics, new cover Large, easy-to-grip venturi lever –Easy to find & access.

Slides:



Advertisements
Similar presentations
350, 350XL 1¼ - 2. Modification Overview Production of the 1¼ began in 2004 and is current. Production of the 1¼ began in 2004 and is current.
Advertisements

RP-500 ½- 1. Modification Overview Production of the RP500 began in 2007 and is current. Production of the RP500 began in 2007 and is current.
RP4A 2½ – 6. Modification Overview Production of the RP4A series began in Production of the RP4A series began in A Lead free version (4ALF)
RP4AN 21/2 – 6. Modification Overview Production of the RP4AN series began in Production of the RP4AN series began in The 4AN indicates an.
Second Stage.
2 Fire Fighter Qualifications and Safety Skill Drills.
Prestige ex 2000 TECHNICAL MANUAL 2ND STAGE
Servicing Welch DRYFAST ULTRA Pump Models 2032
Metering Pump Spare Parts Replacement. Pump Components (Metering Pump) Pumps are supplied with a 120VAC or 240VAC power cord. Use care to ensure pump.
A Manual for Repair and Maintenance Technicians 1ST STAGE.
¾”-2”. Modification Overview  Production of the series began in 1989 and is current.  Early models of ¾”-2” series did not always.
RPDA 4A 2½” – 6”. Modification Overview  Production of the RPDA 4A series began in  The RPDA 4A can utilize either a Type I or Type II bypass.
860 (LF), 880 ½”- 2” 860 (LF), 880 ½”- 2”. Modification Overview  Production of the ½ - 2” 860 series began in 1997 and is current.  The 880 is an “N”
860 21/2”-10”. Modification Overview  Production of the 2½” – 10 sizes began in  Lead free version (LF860) was introduced in Parts do not.
1 Hose and Lines. 2 High side / low side System with an expansion valve High SideLow Side Condenser Evaporator Receiver/Drier Compressor Expansion valve.
Apeks XTX 2nd Stage Regulator
994 RPDA 21/2”- 6”. Modification Overview  Production of the 994RPDA began in 1999 and is current.  The 994 RPDA currently utilizes the ¾” 009M3 for.
First Stage. Please Turn Off The Cell Phones Copyright Notice This program is copyrighted, all rights reserved. It may not in whole or in part, be copied,
Respirator Safety This Training Covers Respirator Inspection User Fit Checks Respirator Cleaning Respirator Storage.
350, 350A 2½”-12”. Modification Overview  Production of the 2½ - 10” sizes began in  Production of the “A” models began in This Indicates.
825, 825Y, 825YD 21/2”-10”. Modification Overview  825- ( ) Cast iron body- Threaded in seats- Internal check parts are epoxy coated iron. Old.
975, 975XL ¾”-2” 975, 975XL ¾”-2”. Modification Overview  Production of the original 975 began in This version had buna-n check discs and did not.
975DA 2½”-10”. Modification Overview  Production of the 975DA began in 1993 and was discontinued in  The 975DA uses a ¾” 975XL for the bypass.
994 2½ ”- 10”. Modification Overview  Production for the 994 began in 1999 and is current.
765 ½”- 2”. Modification Overview  Production of the 765 began in 1975 and is current.
200B ½”-2”. Modification Overview  Production of the 200B (Watts 719) began in 2003 and is current.
825Y(YA) 3/4”-2”. Modification Overview  Production of the 825Y began in 1978 and is current.  The 825YR ( ) had replaceable check seats. **
800 (M2,M3,M4) ½”-2”. Modification Overview  The original model 800 was produced from  The 800M2 was produced from  The 800M3.
375AST 21/2”-10”. Modification Overview  The stainless steel (ST) series was introduced in  This version has a stainless steel body. ***(Parts.
375, 375XL ¾”-1”. Modification Overview  Production of the ¾”-1” 375 began in 2004 and is current.  The lead free version 375XL was introduced in 2010.
475, 475V 2½”-3”. Modification Overview  Production of the 2½ - 3” sizes began in  The lead free version (XL) was introduced in 2011.
957RPDA, 957N RPDA, 957Z RPDA 21/2”-10”. Modification Overview  Production began in 2002 and is current.  Early versions used a ¾” Flomatic RPZE for.
LF866 2½”-10”. Product Overview  Production of the 2½” – 10” sizes began in  The LF866 utilizes a Type 2 bypass (Model LF619 single check).
4D-200, 4D-700 2½”- 10”. Modification Overview  Production began in 2003 and was discontinued in  The 4D-700 (RPDA) uses a Type-II bypass (single.
½”-10”. Modification Overview  Production of the series began in 1989 and is current.
009 (M3) ½”-2” 009 (M3) ½”-2”. Modification Overview- 009  009 ¾-1” ( ) (1” ) ¾-1” ( ) (1” ) 1¼ -2” ( ) 1¼.
RPZ 2½”- 10” RPZ 2½”- 10”. Modification Overview  Production of the RPZ in sizes 2½ - 10” began in 1993 and is current.
5000CIV 21/2”-10” 5000CIV 21/2”-10”. Modification Overview  Production of the 5000CIV (Watts 909RPDA) began in 1998 and is current.  The 5000CIV utilizes.
375, 375XL 1¼” -2”. Modification Overview  Production of the 1¼” -2” 375 began in 2004 and is current.  The lead free version 375XL was introduced in.
450 4”-10”. Modification Overview  Production of the 4” - 10” sizes began in  The lead free version (XL) was introduced in 2011.
How To: Replace an LTR- 450R Suzuki Fuel Filter By Goigen (#11)
Copyright © 2016 by The S.E.A. Group
”-10”.
½”-10”.
475, 475V, 475XL 4”-10”.
826YD 21/2”-10”.
009 2½”-3”.
RP4A (LF) ½”-2”.
PVB-4A ½”- 2”.
720A ½”-2”.
RPDA 4AN 21/2” – 6”.
800 (M2,M3,M4) ½”-2”.
¾”-2”.
½”- 2”.
450 2½”- 3”.
DC4A (LF) ½”-2”.
957RPDA, 957N RPDA, 957Z RPDA 21/2”-10”.
M500, M500N, M500Z 21/2”-10”.
4000B (M3) ½”-2”.
5000SS 21/2”- 6”.
719 ½”-2”.
880V 21/2”-10”.
975 2½”-10”.
774 2½”-12”.
C400, C400N, C400Z 21/2”-10”.
4000CIV 21/2”-10”.
375DA 2½”-10”.
919 ¾”-2”.
M400, M400N, M400Z 21/2”-10”.
450DA 4”-10”.
Presentation transcript:

Calypso / Titan / Octopus 2nd Stage Regulator

Calypso / Titan 2 nd Stage New cosmetics, new cover Large, easy-to-grip venturi lever –Easy to find & access –Easy adjustment even while wearing gloves –Much more effective than previous switch Lateral openings in front cover –Prevents freeflow from current –The diaphragm is more stable

Calypso / Titan 2 nd Stage New design on the exhaust tee –Built in diffuser creates smaller bubbles –Less noise Soft polyurethane cover –Resistant to abrasion and tearing –Offers impact protection –Easy to purge –“Living” hinge makes removal much easier than previous model

Calypso / Titan 2 nd Stage Comes with Comfo- bite mouthpiece and reusable clamp –Great for rental –Easy change out for disinfection

Calypso / Titan 2 nd Stage Baffles in the oral boss –Guide the air flow uniformly to make the breath more natural

Calypso / Titan 2 nd Stage Once cover is removed, a clip is exposed that allows easy removal of exhaust plate No tools are required

Calypso / Titan 2 nd Stage Venturi retainer clip is removed with finger Slide venturi assembly out No more tiny switch on top No more circlips!

Cutaway View of Valve

Cutaway View

Disassembly

Remove LP Hose 3/4” and 11/16” open end wrench

Remove Hose O-ring

Remove Hose Swivel O-ring

Remove Mouthpiece Remove mouthpiece clamp by lifting cam latch lever Pull off mouthpiece

Remove Front Cover Grasp collar of front cover, stretch over venturi switch Pull off cover

Remove Sealing Ring and Diaphragm Lift out sealing ring and diaphragm Inspect for wear or damage

Remove Exhaust Valve Cover Lift release latch Swing valve cover off lugs on box bottom

Inspect Exhaust Valve Inspect valve and seating surface Valve should be clean and free of tears/holes

Remove Venturi Switch Remove retaining clip with finger Grasp switch and pull straight out of box

Remove Venturi Switch O-ring

Remove Inlet Fitting Apply a ¾” open end wrench to the inlet fitting Loosen and remove

Remove Inlet Fitting O-ring

Remove Crown Medium blade screwdriver Turn CCW until threads disengage

Remove Crown Orifice Seat Extractor Tool (PN )

Remove Crown Orifice O-ring

Critically Inspect Crown Sealing area O-ring groove

Remove Valve Body

Remove Locknut ¼” nutdriver CAUTION: SPRING LOADED

Separate Valve Assembly

Remove LP Seat Pierce seat to remove Do not throw away seat; used in reassembly

Remove Poppet Bearing

Cleaning & Lubrication Brass and Stainless Steel Parts –Pre-clean in warm soapy water; nylon bristle brush –Ultrasonically clean with soapy water; vinegar OK on tough corrosion –Rinse in fresh water; use distilled water if tap water is “hard” –Blow dry with LP filtered air

Cleaning & Lubrication Aluminum, Plastic & Rubber Parts –Soak in warm, soapy water –Use soft nylon bristle brush to remove deposits –Rinse with fresh water –Blow dry with LP filtered air CAUTION: DO NOT soak plastic parts in acidic solutions. !

Cleaning & Lubrication Hoses –Soak hose ends only –Do not allow solution to enter hose –Rinse with fresh water –Dry with hose ends hanging down –Blow out hose before installing

Cleaning & Lubrication Lubrication –Christo-lube MCG 111 –Light film only –Remove visible excess

Reassembly

Install Exhaust Valves Outside of box bottom Pull barb thru center hole Make sure barb is all the way thru Leave 5mm after trimming Leave 5mm

Install Inlet Fitting O-ring

Install Crown O-ring

Press Crown into Fitting

Adjust Crown Drive in crown as far as tool will allow

Place Old Seat into Inlet Reassembly aid only Removed and discarded later

Install Poppet Bearing Seat Extractor Tool Place on tool squared side facing up Press fit into valve body

Install New LP Seat Press fit only No adhesives

Install Poppet & Spring Place poppet on old seat Place spring over poppet

Install Lever Housing Compress spring Screw all the way onto inlet fitting

Install Lever Top of lever faces away from air outlet hole Air Outlet

Install Washer

Install Locknut One thread showing past locknut One thread only

Remove Old LP Seat Remove and discard used LP seat

Insert Valve and Lever Assembly

Install Inlet Fitting Keep valve body pressed against side wall

Torque Inlet Fitting Inch-pound torque wrench 3/4” Crows-foot 45 (±5) in-lbs

Install Hose O-rings & Hose Install o-rings to each end of hose Attach hose to first stage – torque to 40 (±2) in-lbs Attach hose to second stage – turn clockwise until finger tight

Adjust Lever Height Lever Height Adjustment Tool (p/n ) Lever should be 2.5mm above rim of box bottom 2.5mm

Install Venturi Switch O-ring

Install Venturi Assembly Push into right side of box bottom Insert retaining clip, it clicks when locked into place.

Install Exhaust Valve Cover Mate cover holes with lugs on box bottom Swing cover up into position, it will click when latch is engaged

Install Diaphragm Assembly Fit washer on front of diaphragm Place assembly into box bottom

Install Front Cover Start with hose side

Inspect Front Cover Make sure it is seated evenly all the way around

Install Mouthpiece Buckle should be on the right side with latch pointing down

Attach MP Hose 11/16” crows foot Torque to 40 (±3) in/lbs

Testing Preferred method of testing is with a calibrated air flow test bench. This allows quantifiable results to be obtained that can be documented. All test specifications are found in the repair manual

Subjective Breathing Test Place venturi switch in minus “-” position Check for strong purge Inhale slowly but deeply –Should deliver air with little effort, smoothly, without “fluttering” –Should not freeflow or leak Should exhale smoothly

Immersion Test Submerge pressurized regulator in a test tank of clean water Observe for air leaks NOTE: Do not confuse bubbles from trapped air with a true leak. If there is an air leak, bubbles will come out in a constant stream.

Common Problems Air Leak or freeflow –MP too high –Lever too high –Crown orifice maladjusted or damaged –LP seat damaged Weak purge –Lever too low High opening effort –Crown orifice maladjusted