1 Lincoln Footbridges Stewart Bewick -22 nd September 2014.

Slides:



Advertisements
Similar presentations
City of Hubbard Transportation System Plan Update April 25, 2012.
Advertisements

Consultation on key routes which run parallel to Oxford Road corridor September 2012 Bus priority package.
Railway Grade Separations Issues. Railway Grade Separations 1.Introduction Qualifications/experience to undertake bridge planning for railway grade separations:
Bath and North East Somerset – The place to live, work and visit BUDGET FAIR 2014 Cllr David Bellotti Cabinet Member for Community Resources.
Dam Removal in Rhode Island: Present and Future David Chopy, DEM July 16, 2009.
Totnes Bridge Presentation to Totnes Town Council 5 November 2012 John Fewings.
North East Transport Consultative Forum Woodhill House, Aberdeen 2 nd October 2014.
© OPDS 2009 WELCOME TO OCEAN PARK DRIVING SCHOOL My Name is Kim Filby and I will be your Driving School Instructor First things first, do we all know our.
MERTON HIGH STREET MATTHEW EALES. 2 Background Southern Gas Networks have been repairing leaks in Merton High Street over a number of years resulting.
What are “Pinch Points” PPinch Points are areas identified on the Highways Agency network of roads that experience high levels of congestion TThe.
Building Innovative Facilities for a Multimodal Future 2014 BICYCLE MASTER PLAN UPDATE FINAL PUBLIC REVIEW Baltimore City Department of Transportation.
Signs Keep it Simple. Which are on ramps? Exits?
May 7 th, Purpose and Scope of Project Project History Project Elements Next Steps.
Site Location Site Bus Stop Footbridge 400, 800, 1,200 and 1,600 Metre Walk Distance Primary Shopping Areas
Proposed Athletic Facility Renovations to East Hartford High School Albert Costa-Director/Facilities 1 Expectations Matter Effort Matters Competence Matters.
OVERVIEW AND SCRUTINY COMMITTEE SCRUTINY OF 20MPH SPEED LIMITS Rupert Thacker Team Leader – Forward Planning and Rail Liaison.
1 Nottingham-Lincoln Stakeholder Board – Network Rail update Doreen Marsh – 26 th February 2015.
Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users SAFETEA-LU Key Highway Safety Provisions Elizabeth Alicandri FHWA.
Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users SAFETEA-LU Key Safety Provisions Federal Highway Administration.
VTA Light Rail System and Safety Enhancements MTC Railroad Crossing Seminar May, 21, 2008.
Highways and Engineering Savings and Efficiencies Review November 2010.
Chapter 11 Driving on Expressways
Title: Rail Safety Survey Presenter’s Name: DAISY P. JACOBO Economy: Philippines 33rd APEC Transportation Working Group Tokyo, Japan October
Joint Transport Forum I Rapid Transit Line 2 Our Future Transport I West of England Sub Region.
Public Hearing August 30, 2014 Drive-Way Ordinance Please Sign in…
A presentation to a Roads Academy Masterclass May 2011 Paul Mitchell Head of Health & Safety Aiming for Zero The Highways Agency’s approach to improving.
Cycle Path Diversion Strategy Catford Stadium Barratt London Aldgate Author P.Willisr.
Ottawa’s Light Rail Transit Project OLRT Tunnel Geotechnical Update Technical Briefing December 21, 2010 John Jensen Director Rail Implementation Office.
THE SOUTH WESTERN RAILWAY Twickenham Station Platform Improvements 29 th January Twickenham Stadium.
Wolverhampton City Centre Metro Extension. Introduction  Background New Tram and Depot Extension Birmingham City Centre Extension Original Wolverhampton.
Transportation and Transit Committee 4 December 2002 Albion Road Corridor Study.
Review of Issues Affecting Utilities and Road, Rail and Motorway Corridors Mike Sim & Hamish Elliott Resources & Networks Branch Ministry of Economic Development.
Intersections  Traffic control  Traffic volume  Control all lanes of traffic  Pedestrians 1.
Policy Research and Innovation Research and Innovation H2020 – WP 2014/15 "Smart, Green and Integrated Transport" 1.
Oxford Health Overview and Scrutiny Sub- Committee Presentation by Oxford City PCT 24 th January 2006.
Totnes Old Bridge Presentation to the Totnes Traffic and Transport Forum 10 October 2012 John Fewings.
What is a TSP? Provides City with guidance for operating and improving a multimodal transportation system Focuses on priority projects, policies, and programs.
Brief Update 0-19 Prevention Service
Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users Advancing Safety through SAFETEA-LU Michael Halladay FHWA Office of.
© 2013 Sigma Management Development Limited THE VALUE IMPROVEMENT PROGRAMME & HOW IT WORKS COMMERCIAL DIRECTORS FORUM 3 DECEMBER
Street Design Construction White Bear Avenue Reconstruction Jesse Farrell, P.E &
Continental Crossings Peruvian Bridge Project Proposal Presented by: Avery Bang Team Members: Irund A-wan Jenna Kusmierek Tara Olds Ryan Wallace.
SHE Code 2: Safe Movement of Vehicles on STFC Sites Safety, Health and Environment (SHE) Group.
Level Crossings Safety Regulation in Great Britain Don Wilson HM Principal Inspector of Railways.
1 MD 5 (Point Lookout Road) Leonardtown (Phase 1) Intersection Reconstruction At Abell and Moakley Streets Informational Meeting January 19, 2016.
Praying Together: 7am – 8am Tuesday 11 th JANUARY Mark Henderson Centre Ann Street DD3 7TH “Seeing Dundee transformed for and through God’s glory” Enabled.
Item 6b. Project Vicinity Park Ave Bridge Existing Park Avenue Bridge.
1% Sales Tax Commission Board Meeting June 3, 2015.
Proposed Additions to MUTCD. Chapter 8E. Busway Grade Crossings Proposed revision submitted to FHWA in June Intended for next edition of MUTCD.
Connecting Eastside and Victoria Leisure Centre - Update St Ann’s and Dales Area Committee Presentation September 2010.
 According to the dynamics of traffic growth on the Kiev railway junction the existing transport capacity will be exhausted between the years
Road and rail safety. Look at the next slides and try to guess what each picture is of as it is revealed. The three pictures will show the most important.
Secor Road Reconstruction Project Public Meeting #2
HSR Crossing Safety Update Elliot A
Stanford Avenue/El Camino Real Intersection Improvements Project
Draft Transportation Element September 6, 2017
Step Free Access Programme
Building Stronger Communities 22nd October 2015
GATE SAFETY Traffic gates on JMU campus are for vehicles only. Do not cross beneath gates that are up as they may come down without warning. James Madison.
SCOHTS Meeting June 15-17, 2011.
SE 12th Street Roadway Improvements February 8, 2005.
Presentation to LEP Performance and Investment Committee 16 May 2018
SCOHTS Meeting June 15-17, 2011.
A133 IPSWICH ROAD SCHEME COMMUNICATION UPDATE ( )
A133 IPSWICH ROAD SCHEME COMMUNICATION UPDATE ( )
The EU Strategy for Adaptation to climate change
Ward Park Restroom Timeline
I Street Bridge Replacement Project
Buckner Road Interchange at I-65 Public Meeting
Presentation transcript:

1 Lincoln Footbridges Stewart Bewick -22 nd September 2014

2 Lincoln Crossings – The Problem Lincoln city centre is divided by two level crossings. They are there to protect safety but we know they cause disruption and can be frustrating. Most people use the crossings properly but we regularly see people rushing across them once the warnings have started, running around the lowering barriers or even climbing over them, putting themselves at risk.. The misuse at these crossings needs to be urgently addressed. We are consulting city partners and the public to find designs that reduce risk and inconvenience by separating rail and pedestrian traffic by providing new pedestrian connections across the city.

3 Safety risk is posed by misuse of the level crossings, not the technical design Incidents of misuse of the Lincoln Level Crossings are of significant concern, Our aim is to; – Improve the safety of the public – Improve the safety of the railway Level Crossings – Safety Risks

4 4 Crossing Misuse

5 5 Brayford Wharf – Proposal Footbridge – single lift, stairs. Footpath crossings retained, single lane highway. Swan island Future proofed for electrification

6 Brayford Wharf – Programme Planning approved on with 12 conditions Enabling Works – Swan Island (December 2013) A value engineering exercise is currently being undertaken on the project. Footbridge Construction programme is reliant on the services being diverted which are anticipated to commence in January 2015.

7 High Street – Proposal Free Standing Structure. Single Lift and Stairs. Requirement to alter 179 High Street. Future proofed for electrification

8 High Street - Proposal

9 High Street (Existing & Proposed )

10 High Street – Programme Planning approved on The design is continuing. Vacant possession of 179 High Street has been obtained. Construction programme -October 2014 to September 2015.