EMB PAR, 23 nov. 2001 P. Perrodo, LAPP, Annecy1 ATLAS EMB SERIE MODULE CABLING Experience started with three successive prototype modules (module 0) in.

Slides:



Advertisements
Similar presentations
Status of EC-C assembly at Liverpool C Buttar EC PAR, Nikhef Nov 04.
Advertisements

Introduction. Introduction: Things to Prepare before Assembly Anti-static wrist strap Set of screwdrivers and pliers Piece of cloth CPU Thermal compound.
Training Course on the WJ-HD300A Series DVR Hard Drive Replacement Procedure WJ-HD300A Series DVR.
16/5/2003SCT PAR, Georg Viehhauser1 Assembly of Modules to Cylinders Georg Viehhauser.
Mounting instruction – Hi-Fi-Series – HE-01 / HE-02 Specification : Color: black / silver Measurement: 445 x 460 x 135mm (w x d x h) Material: all-aluminium.
Engineer Training Inkjet Head Cleaning TJ8300 / TJ8500 Inkjet Head Cleaning.
Cleaning of the Optical Block, Critical Orifice, and Focusing Nozzle of the Brechtel Model 1710 Mixing CPC.
Pascal PERRODO, ATLAS-LAPP
How to Build A Computer By John A. Saiz. Materials Required Tools Screw driver Screw driver Tweezers Tweezers Flashlight FlashlightHardware PC Case PC.
AMS-02 tracker mechanics status of assembly and integration Inner tracker integration completion: - Assembly and cabling - Temperature and magnetic field.
Building a Computer Kate Chapin Capstone Project.
Atlas SemiConductor Tracker Andrée Robichaud-Véronneau.
Don Lynch 9/15/05 HBD Safety Review 1 Mechanical Design And Installation Hadron Blind Detector (HBD) Don Lynch.
Coil Manufacture, Assembly and Magnetic Calibration Facility for Warm and Cold Magnetic Measurements of LHC Superconducting Magnets CERN AT-MTM 1 / 21.
Lesson 3 How to Construct Your Own Personal Computer.
Chiho Wang ATLAS TRT Duke University Dubna, May Fuse Box Production Chiho Wang/Jack Fowler.
ISR Work Progress Report Muon Week April 10 th 2003 A. Benvenuti INFN Bologna.
Setting up the Ricoh C305 Press F5 to start the Presentation
Assessment Outcomes 2 and 3 Russell Taylor. Assessment Outcome 2 Set-up an operational computer system with a range of computer hardware Practical & Theoretical.
RICH WG M.Lenti. Outlook Mirror Support Vidyo meeting on June 12, 20, 27 and on July 4 and 11 RICH WG meeting on august 27  Vessel status (see Ferdi’s.
Construction and Installation Readiness of TOTEM Roman Pots Detectors Federico Ravotti (PH/TOT) Gennaro Ruggiero (PH/TOT) LHCC minireview – 06 May 2009.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
© 2007 Cisco Systems, Inc. All rights reserved.Cisco PublicNew CCNA Jianxin Tang IT 1 V4.0 Ch3. Computer Assembly—Step by Step.
M. Gilchriese Disk Geometry January 18, M. Gilchriese 2 ATLAS Coordinate System.
Some questions:  In which order cables will be put ?  Who, where will put PS signal cables in bundles ?  Which kind of cable binders: velcro or panduit.
16/04/20031PNPI / LHCb Muon EDR Wire Pad Chambers PNPI design for regions R4 in Stations M2,M3,M4  4 gas gaps of 5mm±70µm;  Active area: 1224x252.8 mm².
Mechatronics Task Force, 26-nov-02 Olivier Teller, CERN EP-CMA1 Cooling Mechatronics Schedule.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
Status of NA62 straw electronics Webs Covers Services Readout.
ATLAS Endcap Signal Feedthrough Project Status Report Pin carrier Procurement Summary Feedthrough Production QA/QC Shipment to CERN Reception Tests at.
© 2008 Cisco Systems, Inc. All rights reserved.Cisco ConfidentialPresentation_ID 1 Chapter 3: Computer Assembly IT Essentials 5.0.
Endcap Signal Feedthrough Overview Endcap Signal Feedthroughs are constructed and tested in Victoria by Victoria and TRIUMF staff. Each feedthrough unit.
4-Jan-16S.Movchan Straw manufacturing and QC1 Straw tracker manufacturing procedure Dubna: assembly halls procedure conclusion Presented by S.Movchan.
The HCAL barrel absorber structure
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
Single Module Tests (electrical) Inspect connectors and cables for visible damage C-measurement: make sure all pads are correctly connected HV test (1.5.
G.Barber Mice Tracker Integration Harbin Jan Mice Tracker Integration Installation requirements & Procedure.
INSTALLING HARDRIVES AND FLASH DRIVES Objective: install a flash drive and test the installation. How is a Flash drive different to a Hard Drive? Hard.
Dec
Progress on the Prototype design Catania Goikoetxea, Mikel Navarro Medrano, Javier Mainz, March 31st,
D. Piccolo Barrel RPC Cable procurement, installation Davide Piccolo INFN Napoli.
M1 Central Part Cable Routing R3 FAR R2 CLOSE R2 FAR + GEM A3 B From chain GEM R2 CLOSE R2 FAR A1 20 A1 A1 A2 A CHAIN Access Front Dané.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
IBL – UniGe involvements UniGe Team : G. Barbier, F. Cadoux, A. Clark, S. Débieux, D. Ferrère, C. Husi, G. Iacobucci, M. Weber Other member (KEK): Y. Takubo.
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
Concept Design for LBNF Far detector (LAr single phase)
B.Puccio MPE Workshop for LS1 / 22 & 23 Nov Logistics for DYPB activities Bruno PUCCIO (TE/MPE)
July 20, 2007Anita Topkar, BARC PSD Production: Present Status Dr Anita Topkar BARC.
E.Guschin (INR,Moscow) 26 February 2008PS/SPD commissioning meeting CERN PS/SPD LED monitoring system status Tuning of SPD ‘C’ side: We concentrated our.
1 Chamber Interfaces Adalberto Readout-, I2C-, HV-, LV-, Gas- and chamber support interface. Space issues.
Requested hardware for Clermont-Ferrand in the test beam 2015 September 23 Roméo Bonnefoy and François Vazeille This material is provided by LPC and Collaboration:
TEST FACILITY STATUS FOR TESTING CERN Marta Bajko WP10. EUCARD 2 Task 4 - HTS Magnet Tests, June 2015.
Single Phase ProtoDUNE TPC CERN The SP TPC Team Jan. 13, 2016.
Inner Triplet Review 1 H. Prin AT/MEL Activities on the triplets at CERN Reception and Acceptance Triplet String Assembly in Building 181 Handling and.
Planning for Proto-DUNE PD Installation and Cabling at CERN
Brooks Expert Support Tool (BEST) Software
Considerations from machine protection and the ELQA teams
Baby-MIND Modules & Services
Cryomodule test stand at ESS site
LKr status R. Fantechi.
Service channels between Tracker and PP1
Status of straw production straw module assembling
K TO 12 CHS MODULE FOR GRADE 9, PP
Mini-drawers, FE-ASIC , Integrator
352MHz Klystron Control for the 3MeV Linac test stand
Pierluigi Paolucci - I.N.F.N. Naples
SPD cable length and rack location
Cryomodule Assembly Plan
Safety, reliability and maintainability
Presentation transcript:

EMB PAR, 23 nov P. Perrodo, LAPP, Annecy1 ATLAS EMB SERIE MODULE CABLING Experience started with three successive prototype modules (module 0) in 1997 Today several serie modules have been cabled. At CEA: M15,M13,M11, at LAPP: M14,M10,M12, at CERN M06. Notes written to describe the procedures: note on frame definitions (ATL-AB- EN-0013), note on cable length specifications (ATL-AL-EN-0030), note on cabling itself (ATL-AB-EN-0014), note on installing the monitoring (ATL-AB- EN-0015).

EMB PAR, 23 nov P. Perrodo, LAPP, Annecy2 Cabling conditions Work in a clean (not white) room Clean the module Inspect everything before installation Write every action in a log book max 4 people cabling at the same time check electrical insulation

EMB PAR, 23 nov P. Perrodo, LAPP, Annecy3 Front Motherboards sectors 1 and 2 Cable tight, Radiation hardness Calibration cables

EMB PAR, 23 nov P. Perrodo, LAPP, Annecy4 Front with temperature probe connection Calibration cables

EMB PAR, 23 nov P. Perrodo, LAPP, Annecy5 Front sector 8

EMB PAR, 23 nov P. Perrodo, LAPP, Annecy6 Front corner at z=3000 with patchpanel PS calibration low profiles

EMB PAR, 23 nov P. Perrodo, LAPP, Annecy7 Front corner at z=3000

EMB PAR, 23 nov P. Perrodo, LAPP, Annecy8 Front Patch Panel « Colonettes »: Great care to screw them on the patch-panel. Connection to the pig-tails is very delicate. Some work has to be done to secure it, particularly in the final cryostat.

EMB PAR, 23 nov P. Perrodo, LAPP, Annecy9 Front motherboard with removed labels MB serial number

EMB PAR, 23 nov P. Perrodo, LAPP, Annecy10 General view of the module M12 after cabling

EMB PAR, 23 nov P. Perrodo, LAPP, Annecy11 Back sector 1 HV spare channelsHV protection Temp. Connection

EMB PAR, 23 nov P. Perrodo, LAPP, Annecy12 Back, gutter with white scotch and cable tights White scotch, (behaviour at cold) Large cable tight Small cable tight

EMB PAR, 23 nov P. Perrodo, LAPP, Annecy13 Back cables properly tighten Small tights HV cables

EMB PAR, 23 nov P. Perrodo, LAPP, Annecy14 Back, cables close to an external ring Cables not too close to the rings Cable tights HV cable

EMB PAR, 23 nov P. Perrodo, LAPP, Annecy15 Back, temperature probe and HT protection Temp. Probe connection HV protection glued

EMB PAR, 23 nov P. Perrodo, LAPP, Annecy16 Full view of a back sector Protection diodes: Remove the MB cover Some low profiles and Change the Millmax

EMB PAR, 23 nov P. Perrodo, LAPP, Annecy17 Mounting the back Patch Panel

EMB PAR, 23 nov P. Perrodo, LAPP, Annecy18 Back patch panel, after cabling

EMB PAR, 23 nov P. Perrodo, LAPP, Annecy19 Electrical tests in building 180 After half-barrel rotation (z axis horizontal, outside the cryostat): it is possible on each half-module (32) to: 1. Pulse, 2. Perform TBF test, 3. Put HV Using a test bench to perform that needs to be very safe with the connectors and cleanness. Do we want that ? Electrical insulation should be checked anytime. After insertion into the cryostat and connection to the feedthrough, the 3 tests mentionned above will be performed from the base plane level (using the test bench currently at CERN for cabling) and the final HV power supplies.