What is a Good SmartSignal Model?

Slides:



Advertisements
Similar presentations
3/17 Dividend Street, Mansfield, 4122, Queensland, Australia phone: web: The SuperCycler A Software.
Advertisements

WHAT IS DRS? Thermoflow, Inc.
Micro Control Solutions Stability System II rev. 6.4
Networking Essentials Lab 3 & 4 Review. If you have configured an event log retention setting to Do Not Overwrite Events (Clear Log Manually), what happens.
Sunday Business Systems Asset Tracking Database Control Calibrated Equipment Manage Preventive Maintenance Maintenance Tracking.
OfficeTrack Mobile Employees and Fleet Management System.
Improving Decision Making Through Advanced Analytics
Multi-DNC Data Collection/Monitoring
1 OCEANIA TECHNOLOGY SEMINAR 2008 © 2008 OSIsoft, Inc. | Company Confidential OCEANIA TECHNOLOGY SEMINAR 2008 How PI Notifications ensures that SmartSignal’s.
In this presentation you will:
Copyright © 2003 OSI Software, Inc. All rights reserved. Reliant Resources Fleet Wide Deployment of PI By : David A. Thomason Joseph W. Milton, PE.
VALUE NOW: Using PI Data to Improve and Optimize Process Control John Cunningham The RoviSys Company.
MCTS GUIDE TO MICROSOFT WINDOWS 7 Chapter 10 Performance Tuning.
Manufacturing Productivity Solutions Management Metrics for Lean Manufacturing Companies Total Productive Maintenance (T.P.M.) Overall Equipment Effectivity.
Chevron’s Power Performance Monitoring Solution
1 Oil oxidation impact on Feed pump and turbine performance Presenter: Walter Bischoff.
Diesel Generator Reliability: Lessons Learned from Storms
7 Day Self Assessment Tool (7 Day SAT) User Guide v7 (June 2015)
Department of Electrical and Computer Engineering Texas A&M University College Station, TX Abstract 4-Level Elevator Controller Lessons Learned.
Chapter 14 Chapter 14: Server Monitoring and Optimization.
Maintaining and Updating Windows Server 2008
Actuators & Their Applications
Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved. Data Center & IT Monitoring Use Cases Regional Seminar Series Carolyn.
Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved. Fleet Optimization Through Process Information Regional Seminar Series.
The Northwestern Mutual Life Insurance Company – Milwaukee, WI Application Monitoring Jeremy Kalsow.
TIMKEN Bearing Diagnostics and Prognostics Using PI Reducing Unplanned Downtime Rich Browner - Program Manager Reliability Solutions The Timken Company,
Project Management on SharePoint with BrightWork.
Completions Safety, Speed, Efficiency, Real Time Statistics and Progress.
Operational Excellence at Roche: PI Delivers Robert Fretz F. Hoffmann-La Roche Ltd. Basel, Switzerland.
GML-3 GPRS BASED METER AND LOGGER THREE PHASE METER WITH INBUILT DATA LOGGER © Embuilt Technologies Visit us at Or For.
ADDED VALUE APPLICATIONS ~ ENABLED THROUGH PI Jerry Weber, Thermal Performance Specialist Frank Borth, Performance & Data Engineer Wayne Benedeck, Thermal.
Fleet Performance and Reliability in Generation Utilities
MCTS Guide to Microsoft Windows 7
What it does ? Continuously monitors critical industrial machinery providing information concerning wear and tear as well as the early warning of forthcoming.
S P O N S O R E D B Y S M A R T S I G N A L Less is More! Pitching New Ideas to Not so New Operators and Managers. Less is More! Pitching New Ideas to.
1 © 2008 OSIsoft, Inc. | Company Confidential Edison Mission Energy: PI for the Next Generation (of Generation) OSI Regional User Conference 10/09/08 Jerry.
Manual Logger & BuzzMe by James Weller and Elizabeth McNeill Manual Logger & BuzzMe By James Weller and Elizabeth McNeill.
Enterprise PI - How do I manage all of this? Robert Raesemann J Jacksonville, FL.
Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved. The Use of PI at International Power Regional Seminar Series Lee.
XpsOES : A New Tool for Improving Safety at Workplace Yasar Kucukefe, Ph.D., National Power Energy.
Network Management Tool Amy Auburger. 2 Product Overview Made by Ipswitch Affordable alternative to expensive & complicated Network Management Systems.
Empowering Business in Real Time. © Copyright 2009, OSIsoft, LLC. All rights Reserved. Value of Partnerships and Collaboration for World Class Performance.
TELVENT IT for a Sustainable and Secure World Alarm Management Gregory Bogle Business Development Manager – Europe Telvent – Oil and Gas Division – EMEAA.
IPECJAFPilgrim Pilgrim Nuclear Power Station Successes At Entergy Nuclear Northeast Efficiencies and Cost Savings Using PI.
Event Management & ITIL V3
© 2007 Multigas Detector Reliability in a small package.
PI at NB Power Presented by Steve Boyko. Introduction About NB Power Our PI history Current PI status Specific PI applications Future PI applications.
1 December 1, 2011 Barry Boguski District Manager, Industrial Scientific Industrial Scientific – Gas Detection Programs.
1 VALUE NOW, VALUE OVER TIME © 2010 OSIsoft, Inc. | Company Confidential Empowering Business in Real Time. © Copyright 2010, OSIsoft LLC. All rights Reserved.
(c) Adaptive Processes Consulting Be with the Best!
Evolution of PI in an Expanding Utility’s Strategy John L. Ragone KeySpan.
2 © 2005 OSIsoft, Inc. – Company Confidential PI Utilization: Strategies for Leveraging Existing Technologies in Refining.
REPORTING SOFTWARE for BUILDING & INDUSTRIAL AUTOMATION.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Temelin NPP Risk Panel A PSA and Safety Monitor Application Workshop Information.
Putting Performance in Context Keys to Closing The Performance Gap Maureen Coveney, OSIsoft Todd Spencer, SmartSignal Michael Saucier, Transpara.
InnoSys Park Brake Tool Master Control Panel Screens Revision A, 12Dec /12/20071.
Spring Hill Assembly1 InnoSys Park Brake Tool Master Control Panel Screens 1 3-Mar-2008.
QC – User Interface QUALITY CENTER. QC – Testing Process QC testing process includes four phases: Specifying Requirements Specifying Requirements Planning.
Presented by The Emerging Role of the PI System in Caterpillar’s Condition Monitoring Service David Krenek – Global Petroleum Market Professional.
Data Analytics – A Cost Effective Approach to Reducing Operating Costs Automatically “find what matters” in the data from building equipment systems and.
Introduction to LabVIEW. Overview Objectives Background Materials Procedure Report/Presentation Closing.
Maintaining and Updating Windows Server 2008 Lesson 8.
Implementing eMaintenance using i SCADA technology for Wisma Persekutuan Melaka By Nurhaizan JKR Mekanikal Melaka Case Study Published by permission and.
Striving for Operation Excellence Using CPM CX
Introduction to LabVIEW
Programming and File Management Part 2
Presented by Jon Pastuszynski, Lead M&D Engineer
August 23, 2000 R.N. Dubois Dow Chemical
Distributor Want aka. Dis-WAnt
Presented by: John Antanies Principal and Founder
Presentation transcript:

What is a Good SmartSignal Model? Presented by Joe Milton Engineering Manager Reliant

Outline Reliant generating fleet and OSIsoft PI infrastructure Virtual M&D concept Human factors What is a good model? KPIs and other metrics

Generating Fleet Location and Fuel Type

Common Plant Historian -- OSIsoft PI 29 PI Servers 203 interfaces to various systems 1000+ process displays & reports 350K tags (real-time data points)

OSIsoft PI took care of history and current value but not what the value should be…. We selected SmartSignal to leverage our existing OSI PI infrastructure and predict…

SmartSignal Predictive Maintenance Tool SS takes data from our PI infrastructure (like vibration, temperature, pressure, etc.) and inputs it into a software model. This model shows how a a typical piece of equipment is supposed to operate over various loads and ambient temperatures. If the data goes outside of the predictive model, an alarm is sent to the station for further investigation. Basically, we are making the computer do the work of scanning all of the sensors and instruments in the plant for changes in known equipment behavior.

Defining WatchList Graphing Terms: Actual, Estimate, Residual, Alert, Incident Actual (blue) from OSI PI Estimate (green) generated by SSC models Residual = Actual - Est Alerts (red X) Statistically significant residual value Incident (diamond) multiple samples or sensors showing alerts; drives the WatchList

Typical Results & Additional Terms VSG (green diamond) Virtual Signal Generation was enabled Missing Value (blue X) Signal gave NaN value

Smart Signal – Site WatchList Models Can see incidents by clicking the arrow button.

SmartSignal – Site Model Detail Site that you are on. Incident List – This is a list of incidents on the models. Chart View –The Blue line is the actual PI data and the Green line is the model data.

SmartSignal-Reliant Scope 67 coal & natural gas power units across U.S. Total 13,450 MW power Rotating & non-rotating balance-of-plant assets monitored 411 assets, 1174 models Turn 30K+ sensors to exception-based monitoring Goals include Early warning of equipment faults & process problems Maximize availability Minimize forced outages Improvement of unit heat rates

Reliant’s “Virtual” M&D Center Staff of three working 5*8 at their own cubes: Review WatchList Email plants when equipment issues are detected Tune Build new models Teach WatchList classes Document issues and model changes. Plant champions Look at the WatchList Use log Deal with the easy ones

Typical Emails to Plant

Typical Plant Response The Plant Champion will commonly use Pi Processbook or Datalink to confirm the item and issue a work order

Example of Full Cycle of a Catch From: Sent: Thursday, November 30, 2006 1:34 PM This is a pretty significant movement on FD Fan Motor outboard bearing (about 17 deg above expected currently). The oil levels are all good and the filters have been changed. The filters were dirty and the temps are dropping on the motor after the change out.

What is a Good Model?

Good Model Brainstorm

Truth Table (Logic) SS Catch SS Catch False Catch True Catch SS no Catch SS no Catch No Machine issue Machine issue

What is a Good Model So Far? Modeling elements It has catches (detects changes) It has no misses (or few) It uses as-found data Human elements It has engaged users

Metrics True Catches Look at the tracking log-equipment/instrumentation catches Missed Catches Long term – Use Power GADS to review major events Was the system modeled? If not, should it be? Build it. If modeled, review and improve the model. No Catches & No Machine Problems Could be a sign of a good program Could mean just wait False Catch Track issues Use log statistics and target problematic models

Catches The table shows true catches and false catches *2006 catches not a full year

False Catch SmartSignal alerts indicate a change from the model data set (State matrix)- A repair could cause a change A new season An operational mode change An abnormal configuration Or bad modeling data

Model with False Alerts Detailed review of this model data set found that it had two modes. A and B with the same Inlet temperature and A down stream of B

Model with False Alerts Detailed review of this model data set found that it had two spikes that were included in the model.

Human Factors How can acceptance be measured? Is the user engaged? What are good KPIs? How can it be made “fair” for peaking and base load unit?

Levels of SmartSignal Utilization basic level is where the WatchList Team (WLT) serves as an M&D center. Plant responds to WLT email questions about their units and WatchList items. the engaged user logs into the WatchList at least once a week (on average). The committed user logs in several times a week (on average). They also add information to the log and clear alerts from the WatchList. The power user exceeds the committed user level by pressing model issues and providing a dialogue about known plant repairs and changes.

Levels of SmartSignal Utilization 2007 – ‘08

KPI Issues Terms like basic, power user work well for a full-year but they did not track seasonal units well We moved to a new metric that is much closer to the desired outcome– If you are running- login

“Average number of service hours between logins” SS Login Ratio “Average number of service hours between logins”

Log Entries 2007 50% of plants had no log entries 78% of log entries were at one plant “C” 2008 Only 10% have no log entries for 2008 Log entries more evenly spread across fleet 119% increase in total log entries

Lessons The knowledge of how the plant should run comes from how it has run (PI data) Keeping the messenger alive is part of the task (instruments) Eliminate variables (do not add them) Model to detect changes Exception-based Statistics-based technologies are not common in plant environments. Tools are not complete solutions – People still have to act

Questions?