Recent and on-going EU policy developments and implementation issues in the field of water management Nicola Notaro (Ph.D) Deputy Head Water Unit C1 DG.

Slides:



Advertisements
Similar presentations
A Blueprint to safeguard Europe’s waters
Advertisements

Water.europa.eu Water quality in the Danube basin Third Conference on the EU Strategy for the Danube Region 21 April 2010 Marieke van Nood Water Unit DG.
W EC work on water reuse Stakeholders meeting - follow-up to public consultation 4/12/2014 Pavel MISIGA Head of Water Unit Directorate General for Environment.
Aqua Publica Europea 04 December 2014 Outlook from the European Commission on the implementation of Art. 9 WFD: state of art and future actions Lukasz.
Module 4: European Blueprint
EU Wetland conservation policy. Communication on the Wise Use and Conservation of Wetlands (1995) => first European document dedicated exclusively.
Water.europa.eu Assessment of the River Basin Management Plans – preliminary findings Conference on River Basin Management Planning Ankara, 28 February.
EU Legislation in the field of environment – key developments in 2007 and rd ECENA Plenary Meeting 18 September 2008.
Blueprint to Safeguard Europe's Water Resources Dagmar BEHRENDT KALJARIKOVA Protection of Water Resources Unit Directorate General for Environment European.
Component 5.2 Harald Marent, Veronika Koller-Kreimel, Austrian Ministry for Agriculture, Forestry, Environment and Water Management Edith Hödl-Kreuzbauer,
Water.europa.eu Assessment River Basin Management Plans CIS Strategic Coordination Group meeting Brussels, May 2011 Marieke van Nood WFD Team DG.
Water.europa.eu 3) a. Reform of the Common Agricultural Policy (CAP) Water Directors’ meeting Budapest, 26 & 27 May 2011 Nicolas ROUYER European Commission.
Seminar for Eastern Europe, Caucasus and Central Asia Countries (EECCA) on Water Statistics September 2012 Almaty, Kazakhstan The EU Water Framework.
Water.europa.eu Compliance Checking of River Basin Management Plans Strategic Coordination Group Meeting, 4-5 November 2009 DG Environment, European Commission.
Progress and challenges of a transboundary cooperation Dr. Adam Kovacs International Commission for the Protection of the Danube River (ICPDR) Status of.
A Blueprint to Safeguard Europe's Water Resources
The Water Framework Directive - Legal Issues for Policy Integration'
Relationship between EUROWATERNET and the Water Framework Directive, and for broader water reporting Steve Nixon ETC/WTR.
EU Water Framework Directive
Groundwater legislative framework
STRATEGIC CO-ORDINATION GROUP Water scarcity Expert group
Marine Strategy Framework Directive: an introduction
Directive 2006/118/EC Short overview
Climate Change and River Basin Planning
The EU WATER POLICY.
Purpose Independent piece of legislation, closely integrated in a larger regulatory framework (complement to WFD): prevent deterioration protect, enhance.
WWater reuse Water Directors 24/11/2014 Nicola NOTARO
Policy Options in the Blueprint April 2012
Directive 2006/118/EC Short overview
1. Implementation of the Water Framework Directive: notifications & infringements, RBMP assessments for the agricultural sector Expert Group on WFD & agriculture.
Balázs Horváth DG ENV C.1 Water Unit
Commission's activities
Meeting of the EG on WFD&Agriculture
Update on RBMP&FRMP adoption and reporting Assessment of RBMP&FRMP
Review of Annexes I and II of the Groundwater Directive 2006/118/EC
Water Framework Directive and Floods Directive latest news
A Blueprint to safeguard Europe’s Water Resources
A Blueprint to safeguard Europe’s waters
A Blueprint to safeguard Europe’s waters
Evaluation of water-related instruments
State of play RBMP assessment
Fitness Check EU Water Policy
Strong needs for coordination at EU level
Fitness Check of EU Freshwater Policy
Towards a Work Programme for the Common Implementation Strategy for the Water Framework Directive (2000/60/EC) Water Directors Meeting 28 November.
EU Water Framework Directive
Commission's activities
EP Pilot project Comparative study of pressures and measures
Water scarcity & droughts
Update WG Eflows activity and link with EcoStat
Legal issues and compliance checking in WFD implementation SCG meeting 5-6 November 2008 Jorge Rodríguez Romero, Unit D.2, DG Environment, European.
Water Framework Directive implementation: RBMP assessment
WWater reuse SCG Water Reuse 1/10/2014 Dagmar BEHRENDT KALJARIKOVA
State of the Environment reporting Agenda 5.
DG Environment, Unit D.2 Marine Environment and Water Industry
Jacques Delsalle, DG Environment, Unit D.1
River basin management plans in Europe
WG Hazardous substances * Marine Strategy 19 November 2003
Water scarcity and droughts
From Water Scarcity & Droughts to Water Accounts
EU Water Policy and Legislation Recent developments and next steps
The Blueprint and Council Conclusions:
Review of Annexes I and II of the Groundwater Directive 2006/118/EC
Brussels – 20 April 2007 European Commission - DG Environment
Results of the screening of the draft second RBMPs
Peter Kristensen European Environment Agency
River basin management plans in Europe
Good groundwater chemical status
Water efficiency for water related products
Assessment of Member States‘ 2nd River Basin Management Plans
Presentation transcript:

Recent and on-going EU policy developments and implementation issues in the field of water management Nicola Notaro (Ph.D) Deputy Head Water Unit C1 DG Environment

The Blueprint package Blueprint Communication COM(2012)673+ Impact Assessment SWD(2012) 381 & 382 Report on River Basin Management Plans COM(2012)670 Commission Staff Working Document, European Overview on River Basin Management Plans, Volumes 1 and 2 SWD(2012) 379 Commission Staff Working Document, River Basin Management Plans, Volumes 3 to 30 (All Member States + Norway) SWD(2012) 379 Communication on the Review of the European Water Scarcity and Drought Policy COM(2012)672 + accompanying Commission Staff Working Document SWD(2012)380 Fitness Check SWD (2012)393

Status of adoption of WFD plans GREEN - River Basin Management Plans adopted! RED – consultations not started, ongoing or finalised but not ALL plans adopted or reported to EC

4 Assessment River Basin Management Plans: Some general findings A lot of effort put into preparation of the plans and impressive knowledge improvement High uptake of the common framework and common language on water management provided by the WFD Integration of ecological perspective into water management Enhancement of international cooperation Public participation, stakeholder involvement 4 Member States yet to submit all plans Low ambition in many of the plans. Uncompleted setting of measures Lack of comparability in some areas (e.g. chemical status!) Little understanding of aligning water management practices and environment protection (e.g. definition of exemptions) Insufficient consideration of water pricing and definition of costs

Status of surface waters

A lot has been achieved, but challenges remain Significant pressures (rivers) Significant impacts (rivers) Source: EEA

Water bodies in good status in 2009 and 2015: What progress expected? Nb of MSNb of water bodies % Water bodies in good status or potential 2009 % Water bodies in good status or potential 2015 Progress in % Ecological status of surface waters Chemical status of surface waters Information unclear to establish the 2009 baseline Quantitative status of groundwater (5197)89 (85)96 (92)7 (7) Chemical status of groundwater (5197)83 (68)89 (77)6 (9)

Blueprint impact assessment 12 priority problems 1.Lack of water pricing 2.Lack of metering 3.Lack of labeling of traded goods 4.Land use/Agricultural impacts 5.Inefficiency in buildings/appliances 6.Inefficient water infrastructure (leakage) 7.Lack of water re-use 8.Governance 9.Target setting 10.Drought management 11.Understanding costs and benefits 12.Knowledge base

Blueprint objectivesVoluntaryRegulationConditionalityFunding Efficient incentive water pricing CIS Guidance on trading schemes by 2014 Enforcement of Art. 9 WFD (ongoing) Ex-ante conditions under RD&C policy funds 2014 Metering take upEnforcement of Art. 9 WFD (ongoing) Water use reduction in agriculture Precondition for some irrigation projects under RD as of 2014 Reduction of illegal abstraction/impoundme nts Apply GMES as of 2013 Possible EU initiative on inspections Cross-compliance under CAP Awareness of water consumption Support voluntary labeling & certific. schemes Maximisation of the use of NWRM (Green Infr.) CIS Guidance by 2014 Greening of CAP pillar I as of 2014 S&C Funds & EIB loans Efficient water appliances in buildings EU Ecolabel & GPP criteria 2013 Eco-design Working Plan in 2012 Reduction of leakagesBest practice/tools on SELL in 2013 S&C Funds & EIB loans Maximisation of water reuse Possible Regulation in 2015 S&C Funds & EIB loans Improvement of governance Peer review of RBMPs (2013 – 2016)

Blueprint objectivesVoluntaryRegulationConditionalityFunding Implementation of water accounts, e-flows & target setting CIS Guidance on WAs / E- flows & Target setting by 2014 Reduction of flood riskThrough Green Infr. European Flood Awareness System Flood Risk Management Plans by 2015 Reduction of drought risk Through Green Infr. European Flood EDO in Enforcement of WFD requirements (ongoing) Better calculation of costs and benefits CIS Guidance by 2014 Better knowledge baseUpgrading WISE by 2015 Support to developing countries Tackling pollutionReport on pharmaceuticals & the environment 2013 Targeted enforcement of WFD, EQS/PSD, NID, UWWTD, IED … Cross-cuttingEIPs on Water and Agri as of 2013 Overall enforcement of WFD, EQS/PSD, NID, UWWTD, IED Possible European Semester Recomm CAP, S&C Funds & EIB loans

Follow up Ensuring correct implementation of WFD in first and second RBMP period (Follow up RBMP assessment) Council Conclusions Follow up bilaterally (COM+MS, 11 meetings to date) Possible enforcement action Common Implementation Strategy (CIS work program incorporated Blueprint policy options) Possible new legislative initiatives Assessment of PoM and integration of EU Water Directives 2019 review WFD

The Groundwater Directive

13 Risks of pollution from diffuse/point sources (urban, agriculture, industrial) EU-wide Quality standards: Nitrates & pesticides (more stringent TVs are required if associated surface waters or directly dependent terrestrial ecosystems need them) TV establishment at most appropriate level (local, regional, national), with account of impacts on aquatic and terrestrial ecosystems, human toxicology and ecotoxicology knowledge Drinking water abstraction Run-off Good chemical status criteria (Article 3 & Annexes I and II) Threshold values for “risk” substances set by MS (end 2008) – Indicative list of pollutants provided – Transboundary coordination required – Possible amendment at RBMP review =WFD environmental objective (besides quantitative status covered by WFD)

Review of GWD Annexes I and II in 2013 and if appropriate, legislative proposals taking account of monitoring data and research outputs GWD implementation group with MS and stakeholders: 479a-8b6d-0c056b6890e a-8b6d-0c056b6890e4 9 October Conference in Brussels 14

The Environmental Quality Standards Directive

An updated list of priority substances 12 new priority substances (very persistent and bio-accumulative, highly toxic, or suspected of being endocrine disruptors) To be monitored regularly in all Member States No later than 2021, action to reduce or eliminate emissions and bring concentrations down to safe levels by 2027

A watch list A new monitoring mechanism – the 'Watch List' - to improve the evidence base for identifying priority substances in the future Three pharmaceutical substances included on the first watch list Provisions to improve the information presented to the public on the chemical status of water A strategic approach to pharmaceuticals

The Floods Directive

Three stage approach Preliminary flood risk assessment (maps, experience from past floods, predictions of future floods, identification areas of potential significant flood risk) Flood mapping (= knowing areas at risk of flooding, different scenarios, flood hazard maps & flood risk maps), Flood Risk Management Plans (= plans to reduce flood risks, covering all elements of the flood risk management cycle) (Transposition) (CA/Unit of management) * **2021 Review /update every 6 years thereafter Reporting to the Commission : 3 months after * = date of 1st review of pressure and impact analysis under the WFD ** = date of 1st review of WFD river basin management plans

Urban Waste Water Treatment

Collection rates:15 MS collecting 100 % of total polluting load. All MS maintained or improved previous results, compliance rates below 30 % in Bulgaria, Cyprus, Estonia, Latvia and Slovenia Secondary treatment 82 %, up 4 points. In EU-15, range %, EU-12, average 39 % Compliance rates for more stringent treatment 77 % overall but EU-12 only 14 %, whereas Austria, Germany, Greece, and Finland reached 100 % EU territory designated as a sensitive area increased by 2 points to 75 % UWWTD as a pilot for the Structured Information and Implementation Framework (SIIF)

Drinking Water Directive

Review of Annexes II and III (monitoring and analysis) Article 11.2 requires an update to respond to technical and scientific progress Improving efficiency, effectiveness, comparability Minimum requirements for monitoring to improve public access to information Coherence with water legislation Discussion at DW Commiteee in November

Thank you for your attention ! All docs available at