5/4/2006 Project presentation 1 AquaMoney project presentation Development & testing practical guidelines for the assessment of environmental and resource.

Slides:



Advertisements
Similar presentations
1 First Task: Homepage for the Preparation of the Pilot Project News / Updates / Proceedings Policy background Implementation.
Advertisements

Promoting Innovative Intermodal Freight Transport PROMIT 5 th Workshop, Bologna, 20/21 November 2007 PROMIT Co-ordination Action Promoting Innovative Intermodal.
The Euronet-PBL Project: Overview of the Work Plan Pekka Kämäräinen University of Bremen, ITB, Presented at the 1st International Meeting of the Euronet-PBL.
MAP-IT! Review Meeting 5 March Brussels Project management Overview Cybion Srl.
Research Programme Design and Management – Experiences from CRUE – Partner Countries Reiner Enders PTJ (Project Management Organisation Juelich) Brussels,
TRANSACT – the collaborative approach and its influence on networking Petra Brüning PAXIS PROJECTS JOINT WORKSHOP Salamanca,
Mediterranean Sea Workshop SEANERGY 2020 project Athens, Greece, 24 May 2011 European Wind Energy Association, Dorina Iuga Supported by.
The Knowledge Resources Guide The SUVOT Project Sustainable and Vocational Tourism Rimini, 20 October 2005.
OVERVIEW OF INTEGRATED WASTE MANAGEMENT IN WEST AFRICA (IWWA)
1 Beyond California Water Plan Update 2005 California Water and Environmental Modeling Forum Annual Meeting, March 3 rd, 2005.
Donatella Fazio BLUE-ETS project coordinator Maria Grazia Calza BLUE-ETS senior researcher ISTAT BLUE-ETS BLUE – Enterprise and Trade Statistics 2012 ESSnet.
This project is implemented through the CENTRAL EUROPE Programme co-financed by the ERDF. Work Package 4 & Methodology for Open Living Lab O4.1.7 Budapest,
CABRI-Volga Cooperation Along a Big RIver: Institutional coordination among stakeholders for environmental risk management in the Volga basin International.
Tackling Transport in Africa The TEST Network.
Water.europa.eu Assessment of the River Basin Management Plans – preliminary findings Conference on River Basin Management Planning Ankara, 28 February.
Funded by European Commission GA Prospects for Farmers‘ Support: Advisory Services in European AKIS (PRO AKIS) EU FP 7 coordination and support.
Connecting People for Better Coastal Water Management in Europe AWARE is funded by the European Community’s Seventh Framework Programme.
I NTRODUCING WP7: D ISSEMINATION Mario Zamponi Centre of Historical and Political Studies on Africa and the Middle East Dept. of Politics, Institutions,
Adaptation knowledge needs and response under the UNFCCC process Adaptation Knowledge Day V Session 1: Knowledge Gaps Bonn, Germany 09 June 2014 Rojina.
1 WERT: WP 5 RG EVANS ASSOCIATES November 2010 Aim To pilot and evaluate the content and context of the course material with target groups To help women.
WFD, Common Implementation Strategy Water Scarcity and Droughts Expert Group Madrid, February 17, 2010.
1 Women Entrepreneurs in Rural Tourism Evaluation Indicators Bristol, November 2010 RG EVANS ASSOCIATES November 2010.
Ing. Peter Burger Regional dimension of of the knowledge economy (REDIPE) – the project is supported by Slovak Research and Development.
European Commission DG Enterprise VIRTUAL ENVIRONMENT FOR INNOVATION MANAGEMENT TECHNIQUES VERITE Kick-off meeting Thessaloniki November 2001.
The Age-Friendly City (TAFCITY) Meeting 2 Budapest May 2012 WELCOME.
ENTRANZE Policies to enforce the Transition to nearly zero energy buildings in the EU-27.
COMRISK meeting – March 2003 EUROSION Coastal Erosion - Assessing the needs for actions Project funded by the European Commission.
Marina Signore e- Frame Project Coordinator Division "Metadata, Quality and R&D Projects", Chief Istat e-Frame “European Framework for Measuring Progress.
Implementation Strategy July 2002 STANDARDS DEVELOPMENT LIFECYCLE PROCESS ORP Publishes & Maintains 8 Standing Committee Recommends Approval / Disapproval.
United Nations Economic Commission for Europe UNECE Transport Division 1 TRANS-EUROPEAN RAILWAY (TER) PROJECT 2 nd Expert Group Meeting (Budapest, 23 September.
Sub-contractors’ Kick-off Meeting 7 th April 2003 Dominique De Buys - GCI.
CRES – 7/2007 Transfer of experience for the development of solar thermal products TRANSOLAR Contract No: EIE/06/107/SI Duration:1/11/2006 – 31/10/2008.
Michel Van Hoegaerden Programme Manager EU Expert Group 16/11/10, Brussels Joint Action on Health Workforce Planning and Forecasting STATUS BRIEFING.
WP6 – Dissemination Project Name: Enhancing Students Participation in Quality Assurance in Armenian HE- ESPAQ Ref TEMPUS BE-TEMPUS-SMGR.
EU Project: Trans-Boundary River Management Phase II and Phase III for the Kura River basin – Armenia, Georgia, Azerbaijan ( Transboundary.
European Commission, DG Environment Unit D.2: Water and Marine Amsterdam, 2/3 December 2004 Slide 1 Item 5.4 RTD / LIFE & Science-Policy Interface Water.
European Commission, DG Environment Unit B.1: Water, the Marine and Soil Joachim D’Eugenio Slide 1 The Common Implementation Strategy (CIS) for the Water.
PRESENTED TO: ENERGY FACILITY CONTRACTORS GROUP SAFETY ANALYSIS WORKING GROUP SAFETY ANALYSIS WORKSHOP BY: CHRIS CHAVES NSR&D PROGRAM OFFICE OF NUCLEAR.
This research has received funding from the European Community’s Seventh Framework Programme (FP7/ ) under grant agreement No WP3 update.
Ecologic.de Public Participation- Key element of EU Water Policy Nicole Kranz Ecologic - Institute for International and European Environmental Policy.
Flood Awareness and Prevention Policy in border areas Brussels, 7 May 2007 Annelieke Laninga-Busch Project manager.
Agriculture “Water Science Meets Policy” Event Common Implementation Strategy of the Water Framework Directive.
E u r o p e a n C o m m i s s i o nCommunity Research Global Change and Ecosystems - Water cycle and Soil-related aspects EC funded research in support.
CARPE DIEM 2 nd meeting Critical Assessment of available Radar Precipitation Estimation techniques and Development of Innovative approaches for Environmental.
Co-funded by the European Union under FP7-ICT Alliance Permanent Access to the Records of Science in Europe Network Co-ordinated by aparsen.eu #APARSEN.
Implementing the European Standards and Guidelines
EC FP7 - Cooperation Theme 6: Environment (incl. climate change)
Background CRiteria for the IDentification of Groundwater thrEsholds BRIDGE Project Presentation Contract N° (SSPI) Co-ordinator: BRGM (Fr)
Project Coordination Group (PCG) for the implementation of the MSFD
Civil Protection Financial Instrument – Prevention Projects
BRIDGE WP5 Socio-Economic Assessment of Groundwater Threshold Values
LUCAS Task Force 30 September 2015 Item 4 – Update on the Knowledge Innovation Project on Accounting for Natural Capital and ecosystem services (KIP INCA)
RECARE set-up Rudi Hessel on behalf of coordination team
toitototototoot toitototototoot
1. Implementation of the Water Framework Directive: notifications & infringements, RBMP assessments for the agricultural sector Expert Group on WFD & agriculture.
Mandate, governance and name of the Committee
River Basin Management Planning
Natural water Retention Measures
LIFE and the implementation of the Water Framework Directive
WFD, Common Implementation Strategy  Water Scarcity and Droughts Expert Group Madrid, February 17, 2010.
Harmoni-CA initiative
Harmoni-CA initiative
The Common Implementation Strategy – an overview
Green Paper on Adaptation and
Fitness Check EU Water Policy
Planning process in river basin management
EP Pilot project Comparative study of pressures and measures
Water scarcity and drought
Common Implementation Strategy for the Water Framework Directive (2000/60/EC) Work Programme : Strengthening EU Water Policy through the 2nd River.
Scientific Support to Policies
Presentation transcript:

5/4/2006 Project presentation 1 AquaMoney project presentation Development & testing practical guidelines for the assessment of environmental and resource costs and benefits in the WFD (SSPI )

5/4/2006 Project presentation 2 Outline Main objective Partners Set-up work packages Organization Activities and deliverables Work plan Time plan

5/4/2006 Project presentation 3 Main objective Development of practical guidelines for the economic assessment of environmental resource costs and benefits

5/4/2006 Project presentation 4 Partners 1.Institute for Environmental Studies (IVM) (coordinator)NL 2. Institute for Intern. and European Env. Policy (Ecologic)DE 3.University of East Anglia (UEA)UK 4.University of Life Sciences (UMB)NO 5.Universidad Politecnica de Valencia (UPVLC)ES 6. Bureau de Recherches Geologiques et Minièeres (BRGM)FR 7.University of the AegeanGR 8. Research Institute for Soil Sc. and Agr. Chemistry (RISSAC) HU 9. Center for Environmental Policy (AAPC)LT 10. Flemish Institute for Technological Research (VITO)BE 11. University of Bologna IT 12. Institute for Water Research (NIVA) NO 13. Royal Veterinary and Agricultural University DK 14. University of Bucharest RO 15. Institute for Advanced Studies Carinthia (IHSK)AT 16. Corvinus University of Budapest HU

5/4/2006 Project presentation 5 Set-up work package WP1: Identification and integration of policy demand for practical guidelines and information WP2: Data base development and meta-analysis for the purpose of benefits transfer WP3: Development of practical guidelines WP4: Testing of guidelines in pilot case studies in representative European river basins WP5: Communication and dissemination of results

5/4/2006 Project presentation 6 Organization WPO: IVM WP1: Ecologic WP2: IVM WP3: UEA WP4: UPVLC WP5: Ecologic - Coordinator - Scientific Council - Project Team - Advisory Committee

5/4/2006 Project presentation 7 Coherence WP3 Guidelines Refinement process WP4 Cases WP1 Policy demand WP2 Database WP5 Dissemination Synthesis & policy recommendations

5/4/2006 Project presentation 8 Activities & Deliverables WP1 ActivityDeliverable Activity 1.1 Definition environmental and resource costs and benefits in WFD D12 Working definition ERCB Activity 1.2 Identification role environmental and resource costs and benefits in the economic analysis in the WFD D13 Survey template national approaches D14 Survey findings Activity 1.3 List of criteria and recommendations related to policy maker demand for practical guidelines D15 Draft list guideline criteria D16 Final list guideline criteria

5/4/2006 Project presentation 9 Activities & Deliverables WP2 ActivityDeliverable Activity 2.1 Review available water valuation studies across Europe D17 Theoretical framework for data base development Activity 2.2 Set-up database existing water valuation studies D18 Water valuation data base Activity 2.3 Meta-analysis existing water valuation studies for the purpose of benefits transfer D19 Meta-analysis results

5/4/2006 Project presentation 10 Activities & Deliverables WP3 ActivityDeliverable Activity 3.1 Development practical guidelines D20 Identification key issues D21 Draft guidelines D23 Final guidelines Activity 3.2 Feasibility study development water value map for European river basins D24 Feasibility study results Activity 3.3 Blueprint for set-up case studies D22 Blueprint case studies

5/4/2006 Project presentation 11 Activities & Deliverables WP4 ActivityDeliverable Guideline testing in case studies D25-D34 Case study status reports D35-D44 Case study results D45-D54 Best practice recommendations

5/4/2006 Project presentation 12 Activities & Deliverables WP5 ActivityDeliverable Activity 5.1 Management of knowledge and interactions with policy makers D55 Benchmark stakeholder participation D57 Final plan use & dissemination knowledge D58 Report raising public participation & awareness Activity 5.2 Set-up and maintenance project web site ( D56 Operational project website

5/4/2006 Project presentation 13 Work plan 1. What are we talking about? 2. What is already out there? 3. How do we measure this? 4. Go out and measure 5. Compare results: how generally applicable are the results? 6. Produce guidelines

5/4/2006 Project presentation 14 Time plan YEAR 1 Draft guidelines and set-up case studies YEAR 2 Tests in case studies YEAR 3 Comparison results and further refinement guidelines

5/4/2006 Project presentation 15 Time plan YrWork PackagePartners 1 Activity 1.1 Definition ERCB Activity 1.2 Identification role ERCB in WFD Activity 1.3 Guideline criteria list IVM-UEA Ecologic with all partners Activity 2.1 Review existing valuation studies Activity 2.2 Set-up database Activity 2.3 Meta-analysis IVM with all partners IVM Activity 3.1 Draft guidelines Activity 3.3 Blueprint set-up case studies UEA-IVM-Ecologic IVM with all partners 2WP4 implementation case studiesAll partners 3Activity 3.1 Final guidelines Activity 3.2 Feasibility study water value map UEA-IVM IVM

5/4/2006 Project presentation 16 Meetings M12M18M24M30M36 Kickoff meeting Amsterdam PT-SC Workshop results WP1-3 & set-up case studies Berlin PT-SC-AC1 Workshop prelim. case study results Bologna PT-SC Workshop final case study results Budapest PT-SC International conference Berlin PT-SC-AC & others Year 1 Year 2Year 3 Workshop case study recommendations Amsterdam PT-SC & invited external experts M1