3-1. Estimate the actual bucket load in bank measure for a hydraulic excavator – backhoe whose heaped bucket capacity is 2.10 CY (1.6 CM). The machine.

Slides:



Advertisements
Similar presentations
Excavators Cranes(will discuss another section)
Advertisements

Excavating and Lifting Part 1
Loading and Hauling.
Excavating and Lifting Part 2
 Soil compaction :  Compaction is the reduction in voids content due to air being forced out of the soil or dissolved in the soil water by mechanical.
Loading and Hauling Part 2
Compacting and Finishing Part 2
Lecture 4 Excavating and Lifting
Draglines and Clamshells
Eng. Malek Abuwarda Lecture 8 P1P1 Construction Methods Lecture 8 Loading and Hauling.
Loading and Hauling Part 3
Lecture 7 Loading and Hauling
Front shovel, back hoe and loader. Group member: Lam Wai Kei Hui Tan La
Chapter 3 Measuring Excavation and Sitework
Excavating and Lifting Hmwk Ch 2 # 1,2,5,8 Ch 3 #2,4,6,10.
TRUCKS THE MOST COMMON HAULING EQUIPMENT USED FOR MILITARY CONSTRUCTION SITE ARE 2 1/2, 5, AND 20 TON DUMP TRUCKS. THE HAUL CAPACITY CAN BE EXPRESSED.
SOIL MECHANICS & TESTING
Chapter 3 Compaction. To improve the density and other properties of soil Increases the solid density improves strength Lowers its permeability Reduces.
Matching An Excavator to Our Trucks ©2009 Dr. B. C. Paul Note – These Slides contain tables and information found in the Caterpillar Performance Handbook.
Pricing Excavation and Backfill
ESTIMATING EARTHWORK Prof Awad S. Hanna.
Excavating and Lifting Part 2
Eng. Malek Abuwarda Lecture 5 P1P1 Construction Methods Lecture 5 Excavating and Lifting.
Compaction Compaction - Densification of soil by removing air voids using mechanical equipment As compaction increases, the following occurs: –Strength.
Proctor Compaction Test for Maximum Dry Density
Lecture 3 Earthmoving Materials
CTC-375 Construction Methods
ENCI 5791 Compaction In-situ soils used as: –Bases for the construction of highway pavements –embankments or leveling material for construction projects.
CEE 404 Winter Productivity Refresher. CEE 404 Winter Excavator Cycle Time.
Compacting and Finishing Part 2
Chapter 5 Compacting and Finishing Part 1 1CE 417 King Saud University.
Loading and Hauling Part 1
COMPACTION Topic COMPACTION Presented to Dr. Ayub Elahi Presented by Group leader. M.Zeeshan haider yousaf Zia. # 14 Haider ayub # 13 Bilal ansari #35.
7. Soil Compaction (Das, chapter 6)
Estimating Ahmed Elyamany, PhD, AVS. EARTHWORK AND EXCAVATION bank  Earth that is to be excavated is called bank measure. loose  Earth that is to be.
Compacting and Finishing Part 1
Excavating and Lifting Part 1
Lecture 6 Loading and Hauling
CONSTRUCTION TECHNOLOGY & maintenance
TYPES OF CONSTRUCTION MACHINERY. FOLLOWING ARE THE MAJOR TYPES OF EQUIPMENTS THAT IS BEING USED IN THE CONSTRUCTION INDUSTRY.
Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display. Chapter 6 Machine Equipment Power Requirements.
Field Compaction Equipment and Procedures
Compaction and Stabilization Equipment
Field Compaction Equipment and Procedures
Lecture 2 Introduction to Earthmoving
SHOVELS.
Soil Compaction Topic I Topic I.
Highway Subgrade (1) Introduction
Compaction.
ESTIMATING EARTHWORK DR. Nabil Dmaidi.
نظام المحاضرات الالكترونينظام المحاضرات الالكتروني Construction Methods By Ruqaya ALZubaidi.
Soil And Rock General Soil Characteristics Trafficability – ability of soil to support weight of vehicles under repeated traffic –Controls traffic on unimproved.
Chapter 4 Loading and Hauling Part 3 1CE 417 King Saud University.
© Awad S. Hanna, PhD, P.E.1 Estimating and Scheduling CEE 492 Lecture 5 ESTIMATING EARTHWORK.
Ahmedabad Institute of Technology
Hasmukh Goswami College Of Engineering
Earth Moving Equipment Companies in Sharjah
SOIL COMPACTION GEOLOGY AND APPLIDE GEOLOGY -:Prepared By:- GEC,GODHRA
Compaction According ASTM D 1557/02
CONSTRUCTION METHODS & TECHNOLOGY
CONSTRUCTION METHODS & TECHNOLOGY
TRUCKS & HAULING EQUIPMENT
Geotechnics 1 (BFC 21702) SOIL COMPACTION.
Lecture 7 Excavators TSP-308 MPK Ferdinand Fassa.
Lecture 6 scrapers TSP-308 MPK Ferdinand Fassa.
CONSTRUCTION EQUIPMENT MANAGEMENT
Lecture 5 Dozer TSP-308 MPK Ferdinand Fassa.
MUHAMMAD WAJAHAT AMIN (INTERNEE, MINE PLANNING) OPEN PIT MINING TOPICS.
ESTIMATING EARTHWORK Prof Awad S. Hanna.
ESTIMATING EARTHWORK Prof Awad S. Hanna.
Presentation transcript:

3-1. Estimate the actual bucket load in bank measure for a hydraulic excavator – backhoe whose heaped bucket capacity is 2.10 CY (1.6 CM). The machine is excavating sand and gravel

3-1. Estimate the actual bucket load in bank measure for a hydraulic excavator – backhoe whose heaped bucket capacity is 2.10 CY (1.6 CM). The machine is excavating sand and gravel

3-3. A 2-CY (1.53 CM) dragline is being used to excavate a canal in common earth. The average swing angle is 70º, the average depth of cut is 8.9 ft. (2.7 m), and the job efficiency is 50 min/hr. Estimate the dragline’s hourly production in loose measure.

3-5. An hydraulic excavator-backhoe is excavating the basement for a building. Heaped bucket capacity is 1.5 CY (1.15 CM). The material is common earth with a bucket fill factor of 0.90. Job efficiency is estimated to be 50min/hr. The machine’s maximum depth is of cut 24 ft (7.3 m) and the average digging depth is 13 ft (4.0 m). Average swing angle is 90º. Estimate the hourly production in bank measure.

3-6. A small hydraulic excavator will be used to dig a trench in soft clay (bucket fill factor = 0.90). The minimum trench size is 24” (0.61 m) wide by 6’ (1.83 m) deep. The excavator bucket available is 30” (0.76) wide and has a heaped capacity of ¾ CY (0.57 CM). The maximum digging depth of the excavator is 17.5’ (5.3 m). The average swing angle is expected to be 90º. Estimate the hourly trench production in LF (m) if the job efficiency is 50 min/hr.

4-2. The tractor-scraper whose travel-time curves are shown in Figures 4-4 and 4-5 hauls its rated payload 4,000’ (1220 m) up a 5% grade from the cut to the fill and returns empty over the same route. The rolling resistance factor for the haul road is 120 lb/ton (60kg/t). Estimate the scraper travel time.

4-6. How many hours should it take an articulated wheel loader equipped with a 4 CY (3.06 CM) bucket to load 3,000 CY (2294 CM) of gravel from a stockpile into rail cars if the average haul distance is 300’ (91.5 m) one way? The area is level with a rolling resistance factor of 120 lb/ton (60 kg/t). Job efficiency is estimated at 50 min/hr.

5-1. The data in the accompanying table resulted from performing Modified Proctor Tests on a soil. Plot the data and determine the soil’s laboratory optimum moisture content. What minimum field density must be achieved to meet job specifications which require compaction to 90% of Modified AASHTO Density?

5-5. Estimate the production in compacted CY (CM) per hour of a self-propelled tamping foot roller under the following conditions: average speed = 5 mph (8.0 km/hr), compacted lift thickness = 6” (15.2 cm), effective roller width = 10’ (3.05 m), job efficiency = 0.75, and number of passes = 8.