Lecture 4 Excavating and Lifting

Slides:



Advertisements
Similar presentations
Excavating and Lifting Part 1
Advertisements

Using Large Landscape Maintenance Equipment. Next Generation Science/Common Core Standards Addressed! CCSS.ELA Literacy.RST.9‐10.1 Cite specific textual.
Loading and Hauling.
Excavating and Lifting Part 2
Environmental Drilling By: Josh Humphreys October 8,2006.
Ground-Supported Slabs • Exterior Flatwork
Loading and Hauling Part 2
Earthwork Operations & Equipments
Horticulture CD Unit C 6-3: Nursery, Landscaping, and Gardening.
3-1. Estimate the actual bucket load in bank measure for a hydraulic excavator – backhoe whose heaped bucket capacity is 2.10 CY (1.6 CM). The machine.
Types of Loaders ©Dr. B. C. Paul 2000 Modified 2009 Note – These slides contain drawings copied from the book Surface Mining Equipment.
Draglines and Clamshells
Eng. Malek Abuwarda Lecture 8 P1P1 Construction Methods Lecture 8 Loading and Hauling.
Lecture 7 Loading and Hauling
Front shovel, back hoe and loader. Group member: Lam Wai Kei Hui Tan La
Excavating and Lifting Hmwk Ch 2 # 1,2,5,8 Ch 3 #2,4,6,10.
Foundations Excavations
OSHA Subpart O Motor Vehicles, Mechanized Equipment, and Marine Operations.
Matching An Excavator to Our Trucks ©2009 Dr. B. C. Paul Note – These Slides contain tables and information found in the Caterpillar Performance Handbook.
Pricing Excavation and Backfill
ESTIMATING EARTHWORK Prof Awad S. Hanna.
Excavating and Lifting Part 2
Eng. Malek Abuwarda Lecture 5 P1P1 Construction Methods Lecture 5 Excavating and Lifting.
Lecture 3 Earthmoving Materials
CTC-375 Construction Methods
National Mine Safety and Health Academy John G. Tyler
Estimating Site work. Major Components Erosion & Sediment Control Fencing Clearing and grubbing Excavation Backfill Grading Trucking.
2 Civil Engineering Practice Labor vs Machinery Instructor: Dr. Attaullah Shah Lecture # 2 Department of Civil Engineering Swedish College of Engineering.
Estimating Ahmed Elyamany, PhD, AVS. EARTHWORK AND EXCAVATION bank  Earth that is to be excavated is called bank measure. loose  Earth that is to be.
Excavating and Lifting Part 1
Loading and Hauling Part 2
Chapter 2b Foundations Shallow & Deep Foundations.
Lecture 6 Loading and Hauling
CONSTRUCTION TECHNOLOGY & maintenance
TYPES OF CONSTRUCTION MACHINERY. FOLLOWING ARE THE MAJOR TYPES OF EQUIPMENTS THAT IS BEING USED IN THE CONSTRUCTION INDUSTRY.
Forklift and Lift Truck Safety. Survey: Fatalities.
Estimation 1 Lesson 4 - Excavation.
Lecture 2 Introduction to Earthmoving
Planning for Earthwork Construction
SHOVELS.
Horticulture CD Unit C 6-3: Nursery, Landscaping, and Gardening.
Powerhouse Prodigy Compact Utility Loader
Matching Shovels ©Dr. B. C. Paul 2000 revised 2008 Note – Matching procedures depicted in these slides are widely understood among those schooled in the.
1. 2 Civil Engineering Practice Introduction Instructor: Dr. Attaullah Shah Lecture # 1 Department of Civil Engineering Swedish College of Engineering.
Road Construction Technology
Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display. Chapter 7 Dozers.
ESTIMATING EARTHWORK DR. Nabil Dmaidi.
نظام المحاضرات الالكترونينظام المحاضرات الالكتروني Construction Methods By Ruqaya ALZubaidi.
Soil And Rock General Soil Characteristics Trafficability – ability of soil to support weight of vehicles under repeated traffic –Controls traffic on unimproved.
L04: Understand the implications of the issues and constraints on building construction Lesson Objective To be able to explain the different plant required.
Overview of harvesting system Planning Falling and bucking Transport Loading Yarding Unloading Road construction.
Types of Loaders ©Dr. B. C. Paul 2000 Loading Equipment l Four Basic Types of Loaders Cable Shovel Hydraulic Front Shovel (also called hydraulic excavator)
© Awad S. Hanna, PhD, P.E.1 Estimating and Scheduling CEE 492 Lecture 5 ESTIMATING EARTHWORK.
Riprap Installation Construction Inspection for Field Office Activities Will use Riprap Gradation and Riprap Subgrade Problems from Class Problem Section.
Excavation and lifting Excavator: Power driven digging machine Types 1. Hydraulic excavator 2. Cable operated excavator 3. Shovel 4. Draglines 5. Hoes.
Earth Moving Equipment Companies in Sharjah
CLASSIFICATION OF MINING EQUIPMENT
In the Name of Allah The Most Beneficent & Merciful
EXCAVATION, LATERAL RESTRAINMENT FOR IT AND DEWATERING
Powerhouse Prodigy Compact Utility Loader
CONSTRUCTION METHODS & TECHNOLOGY
SAB 3122 CONSTRUCTION TECHNOLOGY AND ESTIMATING Excavation
TRUCKS & HAULING EQUIPMENT
Lecture 7 Excavators TSP-308 MPK Ferdinand Fassa.
CONSTRUCTION EQUIPMENT MANAGEMENT
Lecture 5 Dozer TSP-308 MPK Ferdinand Fassa.
ESTIMATING EARTHWORK Prof Awad S. Hanna.
Backhoe.
ESTIMATING EARTHWORK Prof Awad S. Hanna.
Presentation transcript:

Lecture 4 Excavating and Lifting Construction Methods Lecture 4 Excavating and Lifting Lecture 4

Excavating and Lifting Excavating and Lifting Equipment An excavator is defined as a power-driven digging machine The major types of excavators used in earthmoving operations include hydraulic excavators and the members: of the cable-operated crane-shovel family (shovels, draglines, hoes, and clamshells). Dozers, loaders, and scrapers can also serve as excavators. Lecture 4

Excavating and Lifting Excavators and Crane-Shovels Lecture 4

Excavating and Lifting Excavators and Crane-Shovels Some of many attachments for the hydraulic excavator and their uses include: Arms" extendible: Replaces the standard stick to provide extra reach. Auger: Drills holes for poles, posts, soil sampling, and ground improvement. Booms: Extended booms used for long-reach applications. Breaker/hammer: Bucket Grapple Pile driver Lecture 4

Excavating and Lifting Crawler mountings are widely used for drainage and trenching work as well as for rock excavation. Truck and wheel mountings provide greater mobility between job sites but are less stable than crawler mountings and require better surfaces over which to operate. Wheel mountings, on the other hand, use a single operator's station to control both the carrier and the excavating mechanism. Lecture 4

Excavating and Lifting Excavator Production Plate line capacity is the bucket volume contained within the bucket when following the outline of the bucket sides. Struck capacity is the bucket capacity when the load is struck off flush with the bucket sides. Water line capacity assumes a level of material flush with the lowest edge of the bucket Heaped volume is the maximum volume that can be placed in the bucket without spillage based on a specified angle of repose for the material in the bucket. Lecture 4

Excavating and Lifting A better estimate of the volume of material in one bucket load will be obtained if the nominal bucket volume is multiplied by a bucket fill factor or bucket efficiency factor. Example Estimate the actual bucket load in bank cubic yards for a loader bucket whose heaped capacity is 3.82 m3. The soil's bucket fill factor is 0.90 and its load factor is 0.80. Lecture 4

Excavating and Lifting Hydraulic Excavators The original and most common form of hydraulically powered excavator is the hydraulic excavator equipped with a hoe front end. It is designed primarily for excavation below grade. Lecture 4

Excavating and Lifting Hydraulic Excavators The use of compact or "mini" excavating equipment is a growing trend in the construction equipment industry. These machines are available in sizes from about 10 to 60 hp (7.5-45 kW) with digging depths from about 7 to 15 ft (2.1-4.6 m). Lecture 4

Excavating and Lifting Production Estimating In trenching work a fall-in factor should be applied to excavator production to account for the work required to clean out material that falls back into the trench from the trench walls. Lecture 4

Excavating and Lifting Lecture 4

Excavating and Lifting Example Find the expected production in LCM per hour of a small hydraulic excavator. Heaped bucket capacity is 0.57 m3. The material is sand and gravel with a bucket fill factor of 0.95. Job efficiency is 50 min/h. Average depth of cut is 4.3 m. Maximum depth of cut is 6.1 m and average swing is 90. Lecture 4

Excavating and Lifting Lecture 4

Excavating and Lifting Shovels The hydraulic shovel digs with a combination of crowding force and breakout Although the shovel has a limited ability to dig below track level, it is most efficient when digging above track level. Lecture 4

Excavating and Lifting Lecture 4

Excavating and Lifting Lecture 4

Excavating and Lifting Production Estimating Lecture 4

Excavating and Lifting Lecture 4

Excavating and Lifting Example Find the expected production in LCM per hour of a 2.3-m3 hydraulic shovel equipped with a front-dump bucket. The material is common earth with a bucket fill factor of 1.0. The average angle of swing is 75° and job efficiency is 0.80. Lecture 4

Excavating and Lifting The Drag Line The drag line is a very versatile machine that has the longest reach for digging and dumping of any member of the crane-shovel family. It can dig from above machine level to significant depths in soft to medium-hard material. Lecture 4

Excavating and Lifting Lecture 4

Excavating and Lifting Clamshells It is capable of excavating to great depths but lacks the positive digging action and precise lateral control of the shovel and backhoe. Clamshells are commonly used for excavating vertical shafts and footings, unloading bulk materials from rail cars and ships, and moving bulk material from stockpiles to bins, hoppers, or haul units. Lecture 4

Excavating and Lifting Lecture 4