EPICS 2008, ShanghaiBEPCII Timing System1 BEPC-II Event Timing System Ge LEI for BEPC-II timing team Institute of High Energy Physics, Beijing Mar. 2008.

Slides:



Advertisements
Similar presentations
01/11/2002SNS Software Final Design Review1 V123S Event Link Encoder, Transmission System and PLL Receiver Thomas M. Kerner (BNL) SNS Global Controls.
Advertisements

Stephanie Allison LCLS Event System 14 June LCLS Event System Outline HW Block Diagram Timing Requirements Time Lines EVG.
1 Initial Commissioning of BEPCII Storage Ring J.Q. Wang 10 May, Initial Commissioning of BEPCII Storage Ring J.Q. Wang 10 May, IMAC2007.
Progress of the sub-harmonic bunching system (i.e. upgrading progress of BEPCII present bunching system) Pei Shilun for the SHBS team Accelerator center,
Dirk Zimoch, EPICS Collaboration Meeting, Vancouver 2009 Real-Time Data Transfer using the Timing System (Original slides and driver code by Babak Kalantari)
Damping ring K. Ohmi LC Layout Single tunnel Circumference 6.7 km Energy 5 GeV 2 km 35 km.
Kazuro Furukawa, KEK, May Event System and Embedded IOCs EPICS Meeting, Vancouver 1 Event System and Embedded IOCs at KEK Recent Activities at KEK.
Dayle Kotturi and Stephanie Allison Facility Advisory Committee Meeting April 20-21,
F.Brinker, DESY, July 17 st 2008 Injection to Doris and Petra Fitting the detector in the IP-region Radiation issues Beam optic, Target cell Polarisation.
Demonstration of the Beam loading compensation (Preparation status for ILC beam loading compensation experiments at ATF injector in this September) (PoP.
The TIMING System … …as used in the PS accelerators.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
EPICS 2011 Spring Collaboration Meeting, Hsinchu, June 13-17, 2011 TPS Timing System & Plan of Machine Protection System TPS Timing System & Plan of Machine.
Background Issues: Real Time Radiation Measurement S.M.Yang EPC.IHEP Mini-Workshop on BEPCII Background Study March 2008 Institute of High Energy.
INTRODUCE OF SINAP TIMING SYSTEM
Overview of SINAP Timing System Electronics Group Beam Diagnostics & Control Division SINAP.
Commissioning Plan of BEPCII Storage Rings J.Q. Wang April 26, 2006.
BEPCII Transverse Feedback System Yue Junhui IHEP , Beijing Sep 17 th, 08IMAC.
Status of BEPCII Timing System Presented by Ge Lei IMAC 2006.
LCLS-II Linac LLRF Control System – L2, L3 Zheqiao Geng Preliminary Design Review May 7, 2012.
Micro-Research Finland Oy Timing System Modules Jukka Pietarinen EPICS Collaboration Meeting, Argonne, June 2006.
Micro-Research Finland Oy MRF Timing System Jukka Pietarinen Timing Workshop CERN February 2008.
Xiao-Yan Zhao Beam Instrumentation Group Accelerator Center, IHEP BEPCII Background Issues: Beam Loss Measurement.
1 Timo Korhonen PSI 1. Concepts revisited…again 3. New (Diamond) cards features and status 4. EPICS interface 5. Conclusions SLS & Diamond Timing System.
Simulation and Experimental Results of SSRF Top-up Operation Haohu Li, Manzhou Zhang SSRF Top-up Workshop, Melbourne
SNS Integrated Control System Timing Clients at SNS DH Thompson Epics Spring 2003.
Digital Phase Control System for SSRF LINAC C.X. Yin, D.K. Liu, L.Y. Yu SINAP, China
1 Proposal for a CESR Damping Ring Test Facility M. Palmer & D.Rubin November 8, 2005.
February 2010 ALBA Synchrotron Light Source Francis Perez.
Kazuro Furukawa, KEK, Jan Accelerator Controls at KEK EPICS Workshop 2009, RRCAT, India 1 Event System at KEK Kazuro Furukawa, KEK KEKB and Linac.
WELCOME TO IHEP. RF Phase Control for BEPCII Linac Accelerator Wenchun Gao.
Kazuro Furukawa, KEK, Jun EPICS Collaboration Meeting / NSRRC SuperKEKB Event / Timing Controls 1 Timing system towards SuperKEKB controls Kazuro.
BEPCII Transverse Feedback System Yue Junhui Beam Instrumentation Group IHEP , Beijing.
Timing System of the Swiss Light Source Timo Korhonen Paul Scherrer Institute, Switzerland 1. Introduction 2. Components and technology 3. SLS Timing Application.
IMAC 2007BEPCII Timing System Status1 Event timing system for BEPCII storage ring commissioning Presented by G. Lei May 2007.
BEPC II TIMING SYSTEM EPICS Seminar Presented by Ma zhenhan IHEP 20.August 2002.
First Collision of BEPCII C.H. Yu May 10, Methods of collision tuning Procedures and data analysis Luminosity and background Summary.
Bunch by bunch feedback systems for KEKB Makoto Tobiyama KEK Accelerator Laboratory.
Bunch Numbering P. Baudrenghien AB/RF for the LHC/RF team.
Beam Physics Issue in BEPCII Commisionning Xu Gang Accelerator physics group.
Design of BEPC Ⅱ Bunch Current Monitor System Zhanglei Beam Instrumentation Group.
CSNS Timing System G. Lei Feb Page CSNS Timing System Feb Contents of this talk Breif introduction to CSNS Requirement investigation Strategy:
Design of New LLRF System for the SPring-8 Storage Ring T. Ohshima on behalf of RF team of SPring-8-II project LLRF Workshop Shanghai.
The machine status and operating mechanism of BEPCII CAO, Jianshe Institute of High Energy Physics, CAS April 16, 2013 The 4th Accelerator.
U. Iriso ESLS XXIII Nov Commissioning of the Bunch By Bunch Feedback System U. Iriso, J. Moldes, A. Olmos (ALBA – CELLS) M. Abbot, G. Rehm (Diamond)
Bunch by bunch feedback systems for KEKB Makoto Tobiyama KEK Accelerator Laboratory.
ESS Timing System Plans Timo Korhonen Chief Engineer, Integrated Control System Division Nov.27, 2014.
Bocheng Jiang SSRF AP group
Failure analysis at BEPCII
SLS Timing Master Timo Korhonen, PSI.
Timing and Event System S. Allison, M. Browne, B. Dalesio, J
Superconductivity in the BEPCII Performance
PSB Injection scheme in the Linac 4 era
CSNS Accelerator Control and Beam Instrumentation JIN Dapeng, XU Taoguang … June 9, 2015
LLRF and Beam-based Longitudinal Feedback Readiness
Fill-pattern Control System for KEKB
Machine Operation and Progresses in SSRF
Recent studies on BEPCII longitudinal impedance
Timing and Event System for the LCLS Electron Accelerator
CEPC Injector Damping Ring
N. Terunuma (KEK) ILC2010, Beijing, March 29th, /2/28.
Mini-Workshop on BEPCII Background Study
BEPCII Background Issues: Collimators and Masks
SLS & Diamond Timing System update
Institute of High Energy Physics Chinese Academy of Sciences
Timing and Event System S. Allison, M. Browne, B. Dalesio, J
Commissioning Issues of BEPCII
Breakout Session: Controls
Device support for VMIVME-5565 and its usage at KEK
Timing and Event System Status DOE Review of the LCLS Project SC5 - Controls Systems Breakout Session S. Allison, M. Browne, B. Dalesio, J. Dusatko,
Presentation transcript:

EPICS 2008, ShanghaiBEPCII Timing System1 BEPC-II Event Timing System Ge LEI for BEPC-II timing team Institute of High Energy Physics, Beijing Mar. 2008

EPICS 2008, ShanghaiBEPCII Timing System2 Brief Introduction to BEPC-II BEPC--Constructed in 1984 –1988; Operation Single Ring collider, Beam energy: 1 – 2.8 GeV Physics Run : Lum cm -2 s 1.89GeV, 5 month/year Syn. Rad. Run : 2.2 GeV, 3 month/year

EPICS 2008, ShanghaiBEPCII Timing System3 Design Goals of BEPCII The BEPCII continues to serve the purposes of both high energy physics experiments and synchrotron radiation applications.

EPICS 2008, ShanghaiBEPCII Timing System4 SR mode: outer ring (BSR) Col. mode: e+ ring (BPR) e- ring (BER) Commissioning Phase 1 : Backup Scheme Phase 2 : With SCQ Phase 3 : With detector e+ e SR

EPICS 2008, ShanghaiBEPCII Timing System5 -Jan. 31 Beam collision tuning with SCQ to improve the luminosity & minimize the background Feb One month of SR operation Mar. 26 Shutdown for detector to move in May 14 Start collision tuning with detector on line Test run of HEP experiment Dec Lum. (1.0~3.0)  cm -2 s -1 BEPCII Schedule of Commissioning

EPICS 2008, ShanghaiBEPCII Timing System6 BEPC-II timing system, an event timing system

EPICS 2008, ShanghaiBEPCII Timing System7 BEPC-II timing related Parameters colliding modeSR mode ring circumference m m energy1.89GeV2.5GeV RF frequency499.8MHz harmonic number revolution frequency1.262MHz1.243MHz linac repetition rate5, 12.5, 25, 50Hz linac RF frequence2856MHz

EPICS 2008, ShanghaiBEPCII Timing System8 BEPC-II timing system requirements delay resolutionRMS jitter in respect to RF Clock Injection kickers2ns< 100 ps e-Gun10ps< 35ps other triggers10ns<200ps clock<100ps

EPICS 2008, ShanghaiBEPCII Timing System9 Black boxes are timing stations Blue lines: timing multi-mode fiber cables Red lines: 499.8MHz reference distribution. Greed line: 10MHz synchronizing cable from linac master osc. to ring RF osc. BEPCII timing system layout

EPICS 2008, ShanghaiBEPCII Timing System10 BEPCII timing structure

EPICS 2008, ShanghaiBEPCII Timing System11 2 EVGs, 18 EVRs 13 VME crates and controllers, 2 levels of fanout, 5 Fout-7 modules in total. GUN-TX and Gun-Rx for e-gun pulser timing 4 TD-4Vs for Kickers 18 sets of home-made E/O and O/E for linac BEPCII timing system hardware

EPICS 2008, ShanghaiBEPCII Timing System12 What are special in BEPCII event timing Hardware developed –18 sets of optical transmitting/receiving boards, for gun power supply, positron source, and 16 modulators (LI Gang, LE Qi) –Gun-Rx module modified to generate NIM outputs directly (WANG Lin) –Revolution frequency Software –Make every bucket selectable –Fast bucket selection: a dedicated record support and device support developed for fast bucket selection

EPICS 2008, ShanghaiBEPCII Timing System13 To select any bucket The event clock is set to 499.8MHz/5. –Reason: In EVG-200, the event clock is generated from RF divided by 4,5,6,8,10 and 12, among which only 5 is a prime numver. event-clock/7 is set to be the sequencer clock –Reason: 7 is a common factor of BEPCII ring RF and linac RF frequnecy. Bn = MOD(Rn*35, 396), for BEPCII colliding mode –Rn is the SequenceRAM unit number, Bn is the bucket number. –Using the above formula, any unit from 0 to 395 in SeqRAM can be mapped to one and only one bucket in the ring, which has 396 buckets in total. The above formula can generate a table, SeqRAM unit to bucket number. Transform it to a table mapping bucket number to SeqRAM unit number.

EPICS 2008, ShanghaiBEPCII Timing System14 Map bucket number to SequenceRAM unit number (partly) BktSeqRAMBktSeqRAMBktSeqRAMBktSeqRAMBktSeqRAM

EPICS 2008, ShanghaiBEPCII Timing System15 To select any bucket This table is put into an array of one-dimension in our dedicated record support which does the fast bucket selection. The n-th element of table gives the SeqRAM unit which generates the n-th bucket to the ring. Similarly, we generate the mapping table for BEPCII synchronized radiation mode by Bn = MOD(Rn*35, 402)

EPICS 2008, ShanghaiBEPCII Timing System16 Fast bucket selection event timing + Beam Current Monitor A new EPICS record support has been created to do the fast bucket selection, –Damping time consideration, bucket switch in 50Hz –protection to BCM hardware process –read BCM values from reflective memory card of BI group, select a bucket of smallest bunch current –map the bucket number into corresponding SeqRAM unit, –Set event code to the above unit in SeqRAM of EVG

EPICS 2008, ShanghaiBEPCII Timing System17 bktRecord.dbd BKSE, DBF_LONG, BER TotalBucketNumbers BKSP, DBF_LONG, BPR TotalBucketNumbers BKSS, DBF_LONG, BSR TotalBucketNumbers BKTE, DBF_LONG, BER BucketInj BKTP, DBF_LONG, BPR BucketInj BKTS, DBF_LONG, BER BucketInj BSEL, DBF_LONG, bucket selection method COUN, DBF_LONG, count CNTD, DBF_LONG, count down DONE, DBF_LONG, all buckets done ENKE, DBF_OUTLINK, Enable/Disable Kicker e- ENKP, DBF_OUTLINK, Enable/Disable Kicker e+ EVG, DBF_OUTLINK, Output SeqRAM delay to EVG INJ, DBF_UCHAR, if is injecting LBKT, DBF_LONG, Last Bucket injected

EPICS 2008, ShanghaiBEPCII Timing System18 bktRecord.dbd MAX, DBF_LONG, max bcm protection value MODE, DBF_MENU, BEPCIIoperationMode RLPE, DBF_UCHAR, ReLoadPatternFile of BER RLPP, DBF_UCHAR, ReLoadPatternFile of BPR RLPS, DBF_UCHAR, ReLoadPatternFile of BSR RMMD, DBF_MENU, ReflectiveMemoryMode RMEO, DBF_LONG, ReflectiveMemory BER Offset for bucket 0 RMPO, DBF_LONG, ReflectiveMemory BPR Offset for bucket 0 RMSO, DBF_LONG, ReflectiveMemory BPR Offset for bucket 0 SEQO, DBF_LONG, EVG SeqRAM offset for bucket 0 TPUP, DBF_LONG, topup autoInjMinBkt

EPICS 2008, ShanghaiBEPCII Timing System19 bktRecord.dbd PTRE, DBF_NOACCESS, BER Pattern , extra int ptre[402] PTRP, DBF_NOACCESS, BPR Pattern , extra int ptrp[402] PTRS, DBF_NOACCESS, BSR Pattern , extra int ptrs[402] BCME, DBF_NOACCESS, –BCM readout for BER –extra char bcme[402] –asl ASL1, –special SPC_DBADDR, BCMP, DBF_NOACCESS, –BCM readout for BER –extra char bcmp[402] –asl ASL1, –special SPC_DBADDR

EPICS 2008, ShanghaiBEPCII Timing System20 Multi bunch injection control

EPICS 2008, ShanghaiBEPCII Timing System21 Multi-bunch injection control Control when to inject and when to stop –Top-off injection, a control loop –Stop injection when all buckets reach the bunch current limit Bucket select method –The smallest the first –Next smaller than the bunch limit, according to the sequence in the injection pattern definition file Criterion –Beam current from DCCT, or bunch current from BCM Injection pattern definition file: ASCII files

EPICS 2008, ShanghaiBEPCII Timing System22 BCM display of 20 * 20 buckets colliding

EPICS 2008, ShanghaiBEPCII Timing System23 Revolution frequency Since our event clock is selected as 499.8MHz/5 = 99.96MHz, no way to generate revolution frequency directly by EVG/EVR with this clock rate. 1.Second EVG of event clock 499.8MHz/4, this method has been using from Oct 2007 to Feb. 2008, second round commissioning for colliding mode of BEPCII 2.Develop a revolution frequency module Input: Ring RF 499.8MHz Output: 499.8MHz/396 or 499.8MHz/402 Made by an institute in Beijing Has been working well since Feb

EPICS 2008, ShanghaiBEPCII Timing System24

EPICS 2008, ShanghaiBEPCII Timing System25 Performance: jitter of transport line beam signal (taken from TC-BCT2) to 499.8MHz RF signal is less then 16 pico seconds. On Apr. 26, 2007, last for 20 minutes.

EPICS 2008, ShanghaiBEPCII Timing System26 Acknowledgement Work done by Ge Lei, Guanglei Xu, Lin Wang, Gang Li, Wenchun Gao, etc. Thanks to the cooperation. Many thanks to the discussions and suggestions of Jukka Pietarinen (MRF Oy.), Kazuro Furukawa (KEKB), Timo Korhonen (SLS), Dekang Liu and Liying Zhao (SSRF), Angelos Gorias and Yuri Chernousko (DLS). Special thanks to the 50Hz module from Yuri Chernousko. Many thanks to the suggestions and cooperation of the colleagues in group of AP, BI, PS Injection, RF, Linac Power Source, Linac Microwave, and detector of BEPCII project.

EPICS 2008, ShanghaiBEPCII Timing System27 Thank you!