1 R.11-10-023 2013 Phase I Resource Adequacy Workshop presentation March 30, 2012 10 am to 5 pm California Public Utilities Commission 505 Van Ness Ave.

Slides:



Advertisements
Similar presentations
ENERGY VALUE. Summary  Operational Value is a primary component in the Net Market Value (NMV) calculation used to rank competing resources in the RPS.
Advertisements

Avoided Cost and E3 Calculator Update Workshop March 14-15, 2006.
1 Illustrative Results Based on E3’s Avoided Cost Model Thursday, April 19, 2012 Marginal Generation Costs.
R RA Phase II Proposals Workshop (day 2) January 25, 2011 Court Yard room 10:00 am- 2:45 pm.
Energy Storage Definitions/Definitions ETWG 18 Feb 2013.
Status Report: Resource Adequacy (RA) and Long Term Procurement Planning (LTPP) CPUC Energy Division Molly Tirpak Sterkel cpuc.ca.gov; Tel:
TPTF Presentation Registration of PUN Facilities December 19, 2007.
California Energy Commission Resource Adequacy Demand Forecast Coincidence Adjustments R Resource Adequacy Workshop January.
1 R : LTPP Track II Workshop – Operating Flexibility Modeling Results Patrick Young Analyst, Generation & Transmission Planning California Public.
Unlocking value from existing utility assets NARUC Meeting – February 2012
Jim Mcintosh Director, Executive Operations Advisor California ISO Independent Energy Producers 2011 Annual Meeting - October 5, 2011 Stanford Sierra Conference.
INTEGRATION COST. Integration Cost in RPS Calculator While “Integration Cost” is included in NMV formulation, the Commission stated that the Integration.
NERC LTRA Update / CDR Capacity Counting Issues
Resource Adequacy Forecast Adjustment(s) Allocation Methodology
EE 369 POWER SYSTEM ANALYSIS
1 The Effects of Integrating Wind Power on Transmission System Planning, Reliability, and Operations Phase 1 Preliminary Overall Reliability Assessment.
Reliable Power Reliable Markets Reliable People ISO Rules Update – – Outage Cancellation – Long Lead Time Energy Dispatch Compliance.
Federal Energy Regulatory Commission Large Generator Interconnection Final Rule RM July 23, 2003.
Least Cost System Operation: Economic Dispatch 1
® Investor Meetings June 7-8, 2010 PG&E Corporation.
Energy Storage R Energy Storage Procurement & Policy Options Arthur O’Donnell/Aloke Gupta/Elizaveta Malashenko Energy Division Grid Planning.
Utah Schedule 37 Update June 25, Schedule 37 Background Schedule 37 – Published rates for standard power purchase agreements with qualifying facilities.
National Renewable Energy Laboratory Innovation for Our Energy Future * NREL July 5, 2011 Tradeoffs and Synergies between CSP and PV at High Grid Penetration.
SAN MATEO COUNTY CCA TECHNICAL STUDY: OVERVIEW Community Choice Energy Advisory Committee June 25 th,2015.
2009 Bidders Workshop Attachment D August 3, 2009.
Resource Adequacy Workshop: DG Deliverability and Flexible Capacity Procurement R January 23, 2012 CPUC Auditorium Phone ‐ ; Code:
ETAAC Energy Sector Energy Storage Smart Grid July 12, 2007 San Francisco, CA.
Jenell Katheiser Doug Murray Long Term Study Scenarios and Generation Expansion Update January 22, 2013.
California SONGS\OTC Plants Assumptions TEPPC – Data Work Group Call Tuesday, September 15, 2015.
Single Electricity Market Update Liam Ryan SEMO. Background 2 years in operation Gross Mandatory Pool All Suppliers All Generations units over 10 MW Trading.
OVERVIEW OF ISSUES DR AND AMI HELP SOLVE Dr. Eric Woychik Executive Consultant, Strategy Integration, LLC APSC Workshop on DR and AMI.
Bill Savings Public Workshop Costs and Bill Saving in the Low Income Energy Efficiency Programs for 2003 to 2005 April 21, :00 AM to Noon 77 Beale.
1 Energy Division Workshops: LTPP Planning Standards (Part 1) & Procurement Rulebook June 11, 2010 Workshop R , Tracks 1, 2, & 3.
GHG BACT Analysis Case Study Russell City Energy Center May 2010 Donald Neal Vice President, EHS.
California ISO – Internal Use Only Flexible Capacity Requirement CPUC RA Workshop March 30, 2012 Mark Rothleder Executive Director Market Analysis and.
Resource Adequacy for Distributed Generation January 27, :15 am to 12 noon Energy Division staff discussion Megha Lakhchaura.
2008 Bidders Workshop Attachment D April 11, 2008.
Demand Response: What It Is and Why It’s Important 2007 APPA National Conference San Antonio, Texas June 26, :00 a.m. to Noon Glenn M. Wilson Director.
1 Intermittency Analysis Project: 2010 Accelerated and 2020 Scenarios Dora Yen-Nakafuji, Commission Project Manager Kevin Porter, IAP Team Lead CEC PIER.
Avoided Cost and E3 Calculator Update Workshop March 14-15, 2006.
The Role of Energy Storage as a Renewable Integration Solution under a 50% RPS Joint California Energy Commission and California Public Utilities Commission.
DR issues in California discussed last year in March Historical DR in California: some background issues –Twenty years of programs/tariffs I/C and AC cycling.
ISO Proposed Flexible Capacity Requirements Stephen Keehn Senior Advisor California ISO CPUC Workshop January 26, 2012.
Long Term Study Scenarios and Generation Expansion Update October 12, 2012.
Target Reserve Margin (TRM) and Effective Load Carrying Capability (ELCC) of Wind Plants Evaluation - Input and Methodology ERCOT Planning 03/25/2010.
Craig Williams Market Interface Manager August 21, 2014 ISAS, Portland, OR.
CALIFORNIA ENERGY COMMISSION Workshop on the Staff Draft 2006 Summer Outlook Report December 8, 2005 Hearing Room B.
Study Results April 16, 2015 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
PALMDALE ENERGY PROJECT AMENDMENT (08-AFC-09C) Data Response Workshop Participation Information, Purpose, and Agenda Topics December 17, :30 a.m.
Overview of Governing Document for Weather-Sensitive ERS Pilot Project Stakeholder Workshop Mark Patterson, ERCOT Staff March 1, 2013.
2004/06/0 2 Market Operations Standing Committee of the IMO1 Small Facilities - Technical Requirements Rhonda Wright.
Congestion Revenue Rights 1 TCR to CRR Transition Plan NOIE Workshop Nodal CRR registration process for NOIEs (REVISED) Beth Garza.
California Energy Commission 2015 IEPR Self-Generation Forecast Sacramento, CA 2/26/15 Asish Gautam Demand Analysis Office Energy Assessments Division.
Presentation Title SOUTHERN CALIFORNIA EDISON® SM SOUTHERN CALIFORNIA EDISON® SM Regulatory Policy SCE Discussion on the Relationship Between NQC and EFC.
1 R Workshop on 2016 RA proposals Energy Division Staff Procurement Oversight and Resource Adequacy California Public Utilities Commission Thursday,
Energy Storage and Distributed Energy Storage (ESDER) Initiative California Independent System Operator CAISO – CPUC Energy Storage Workshop May 3, 2016.
Planning the Networked Grid Transmission Planning J.E.(Jeff) Billinton Manager, Regional Transmission - North Building the Networked Electricity Grid –
Understanding Value of Short-Duration Resources CPUC RA Workshop March 5, 2016.
April 5, 2016 CPUC. JDRP Proposal  Flexible RA Attributes and requirements should be unbundled from the underlying system RA and Local RA attributes.
Joint CPUC-CAISO Workshop: IOU Energy Storage Track 2, R May 2, 2016 STATION POWER Gabriel Petlin/ Manisha Lakhanpal Grid Planning and Reliability,
Resource Adequacy Coincident Adjustment Factor Methodology Miguel Cerrutti Demand Analysis Office Energy Assessments Division R Workshop California.
JOINT WORKSHOP ON MULTIPLE-USE APPLICATIONS. AMS’S 50 MW FLEET FOR SO. CAL EDISON MULTIPLE USE CASE #5: BEHIND- THE-METER DISTRIBUTED ENERGY RESOURCES.
1 Distribution Resources Plan [R ] Data Workshop California Public Utilities Commission May 23, 2016 Rulemaking R Pursuant to Public.
2013 Load Impact Evaluation of Southern California Edison’s Peak Time Rebate Program Josh Schellenberg DRMEC Spring 2014 Load Impact Evaluation Workshop.
1 R Phase I Resource Adequacy Workshop presentation – Day 1 January 26 and 27, am to 5 pm CPUC offices 505 Van Ness Ave San Francisco,
CPUC Resource Adequacy Program – LAO briefing May 25, 2009.
Target Reserve Margin (TRM) and Effective Load Carrying Capability (ELCC) of Wind Plants Evaluation - Input and Methodology ERCOT Planning 03/25/2010.
CPUC Rate Proceedings Relevant for TOU
Resource Adequacy Demand Forecast Coincidence Adjustments
Avoided Cost and E3 Calculator Update Workshop
Presentation transcript:

1 R Phase I Resource Adequacy Workshop presentation March 30, am to 5 pm California Public Utilities Commission 505 Van Ness Ave San Francisco, CA Courtyard Room and WebEx Copies of the agenda are available in the back of the room Restrooms are at the other end of the auditorium, and there is a cafeteria near the main lobby.

2 WebEx information Meeting Number: Meeting Password: energy Go to link: S=MI&LD=1&RD=2&ST=1&SHA2=jySO1w0aAEvT0JNZp wIlHls-8gplxNEy1QZi8HJDD/w=&RT=MiM0 Teleconference information: participant passcode:

Purpose: Record Building –Presentations will be added to record –Parties can comment on this presentation in their April 9, 2012 comments 3

4 Introductions and Agenda 10:00 am -10:30 am - Introductions and announcements. 10:30 am – 12:00 noon – Energy Division Proposal o Gross Load versus Net Load o Inter-hour change o Statistical representation of “typical day” o Bucket percentages o Characterization of current fleet – bucket definitions o Question/Answer 12:00 noon – 1:15 pm – Lunch

Cont. 1:15 pm – 2:45 pm – Further explanation of CAISO Proposal o CAISO Presentation o Question/Answer 2:45 pm – 3:00 pm – Break 3:00 pm – 4:15 pm – Additional Issues o Resource Adequacy for Distributed Generation o RPS/RA coordination o Question/Answer 5

Cont. 4:15 pm – 4:45 pm – Questions and wrap-up o Next Steps o Comment Schedule o Overall Question/Answer 6

7 Dates, 2012Phase I proceeding Schedule Jan 13Parties file proposals on Phase 1 issues; Energy Division issues staff proposals on Phase 1 issues Jan 26-27Energy Division workshops March 3CAISO publishes draft 2013 LCR report March 23Energy Division workshop report March 30Energy Division Workshop April 9Parties file comments based on Energy Division workshop report, except for LCR study issues. Deadline for requesting evidentiary hearing. April 20Parties file reply comments MayCAISO publishes final 2013 LCR Report May 7Comments on final 2013 LCR Report filed with Commission May 14Reply comments on final 2013 LCR Report filed MayProposed decision issued by ALJ

Energy Division Proposal – Recap of where we are Redesign of MCC Buckets – current structure insufficient going forward Differentiate and limit based on dispatchability and consistent hours of operation Definitions – dispatchability, consistent hours of operation Analysis to set percentages – daily and hourly load variation, not load duration curves Impact of intermittent generation on interhour change in load Several open issues – definitions, classification of resources, how to set percentages 8

Revised proposal – supplemented information Definition of dispatchability Bucket percentages – set relative to analysis on patterns of hourly load change and impact of wind generation on interhour change Breakdown of current fleet – limits on current resources 9

Definition of Dispatchability Dispatchability – three characteristics –Ramp rate over 4 MW/min –Registered cooling time of less than one day or minimum start up time of less than 10 hours –Unit has contractual obligation to be available for CAISO dispatch –Individual unit specifications (ramp rate, registered cooling time, start up time) are confidential, but dispatchability is a binary question, and can possibly be noted as such for NQC list. Confirmation from legal staff required 10

Hours of consistent production This is a qualitative metric, and is technology specific, not drawn from data. There is some room to dispute classification Broadly speaking, some steam units, nuclear units, and solar units have relatively stable and long generation profiles, while peakers, DR, and wind do not. Resources are either erratic or limited to a few hours in the day. 11

Notation on NQC list Two new fields to be added – Dispatchability and consistent production. Units count at NQC, there is only one number for each resource, and NQC is still calculated under current rules. Classifications can be appealed and discussed with ED staff – same as process for NQC calculations. 12

Bucket Percentages Bucket 1 – analysis of Gross Load versus Net Load Bucket 2 versus Bucket 3 – Analysis of hourly baseload versus flexible percentages as they differ each month – recommend percentages for buckets that are stable throughout the year, not monthly 13

Gross Load versus Net Load Gross Load – hourly load from 2009 and 2010, months of April, May, July, August, and October. Load data drawn from CAISO OASIS system. Net Load – Gross Load adjusted for corresponding hourly generation from wind facilities. Wind generation taken from CAISO settlement quality meter data, and is confidential. 14

Steps to Analysis –creation of “Typical” shapes Create 3 shapes for each month and each year (2009 and 2010) –Average –Median –90 th percentile 9 shapes created overall for each month. Compare interhour change in Gross Load and interhour change in Net Load curves 9 more shapes created from interhour change data. 15

Steps to Analysis – Interhour change shapes Create shapes for interhour change in Typical day –HE2 – HE1 = interhour change from HE1 to HE2 –Interhour change in Gross Load minus interhour change in Net Load = change in interhour change due to added wind affects. This calculation done for each hour of each day of each month Create 3 shapes for 2009 (30 days of data) and 3 more shapes for 2010 data (30 days of data for each month). Create 3 shapes for composite date (60 days of data). 9 total shapes created. 16

Difference in Interhour Change Created 9 curves to represent a “typical” amount of difference in Interhour change between Gross Load and Net Load values. 17

August –average, median, 90 th percentile 18

Base load versus Peaking needs 19

Results of Analysis – walk through August is peakiest month Flexible needs highest in August “Typical” needs run at 45% of peak Percentage represents ratio of lowest value in month (10 th percentile for all month) divided by the highest hourly value (90 th percentile for each hour of day) to create an hourly flexibility needs curve 20

Current NQC list Ramp rate/startup time quantitative analysis Technology based qualitative analysis Breakdown of NQC list 21

Breakdown of current fleet – from 2012 NQC List 22 Bucket Name Resources in each bucket * NQC of each bucket in the fleet (MW) Percentage of total NQC of the fleet 4 Combined Cycle Gas Turbines, Geothermal, Pumped Storage, Firm Imports26,47852% 3 Nuclear Plants, Solar facilities, Combined Heat and Power, Steam Turbines11,17022% 2 Combustion Turbines, Demand Response, Energy Storage, Dispatchable Hydro13,36826% 1 Wind, Run-of-river Hydro1,0152% TotalAugust 2012 Net Qualifying Capacity List51,079

Other topics for the day Resource Adequacy for Distributed Generation RPS/RA coordination 23

24 Thank you! For Additional Information: Megha Lakhchaura Donald Brooks Procurement and Resource Adequacy Phone: (415) (415)