Overview of Low Energy RHIC e-Cooler (LEReC) project and needed RHIC upgrades Vladimir N. Litvinenko Department of Physics and Astronomy, Stony Brook.

Slides:



Advertisements
Similar presentations
Beam Dynamics in MeRHIC Yue Hao On behalf of MeRHIC/eRHIC working group.
Advertisements

Accelerator Science and Technology Centre Prospects of Compact Crab Cavities for LHC Peter McIntosh LHC-CC Workshop, CERN 21 st August 2008.
Study of the Luminosity of LHeC, a Lepton Proton Collider in the LHC Tunnel CERN June F. Willeke, DESY.
Chris Tennant Jefferson Laboratory March 15, 2013 “Workshop to Explore Physics Opportunities with Intense, Polarized Electron Beams up to 300 MeV”
Ion Accelerator Complex for MEIC January 28, 2010.
Simultaneous Four-Hall Operation for 12 GeV CEBAF Reza Kazimi November 2012.
Cooling Accelerator Beams Eduard Pozdeyev Collider-Accelerator Department.
1 Low-energy RHIC electron Cooler (LEReC) Update November 17, 2014.
V.N. Litvinenko, ElC Collaboration Meeting, Hampton University, May, 2008 Staging of eRHIC Increased Reach in c.m. Energy and Luminosity Vladimir.
MeRHIC Design V.Ptitsyn on behalf of MeRHIC Design team: M. Bai, J. Beebe-Wang, I. Ben-Zvi, M. Blaskiewicz, A. Burrill, R. Calaga, X. Chang, A. Fedotov,
ALPHA Storage Ring Indiana University Xiaoying Pang.
Thomas Roser RHIC Open Planning Meeting December 3-4, 2003 RHIC II machine plans Electron cooling at RHIC Luminosity upgrade parameters.
Thomas Jefferson National Accelerator Facility Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Issues.
Toward a Test Facility for an ERL Circulator Ring Based e-Cooler MEIC Electron Cooler Test Facility Planning Retreat January 31, 2012.
MEIC Electron Cooling Simulation He Zhang 03/18/2014, EIC 14 Newport News, VA.
1 Low-energy RHIC electron Cooler (LEReC) cost estimate December 2, 2014.
Particle dynamics in electron FFAG Shinji Machida KEK FFAG04, October 13-16, 2004.
I.V. Bazarov, Multivariate Optimization of High Brightness DC Gun Photoinjector, UCLA Workshop, 8-10 November CHESS / LEPP ERL DC Gun Injector.
History and motivation for a high harmonic RF system in LHC E. Shaposhnikova With input from T. Argyropoulos, J.E. Muller and all participants.
October 4-5, Electron Lens Beam Physics Overview Yun Luo for RHIC e-lens team October 4-5, 2010 Electron Lens.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Sergey Belomestnykh SRF and RF systems.
July LEReC Review July 2014 Low Energy RHIC electron Cooling (LEReC) Alexei Fedotov LEReC overview: project goal and cooling approach.
Alexei Fedotov, 02/02/12 1 Potentials for luminosity improvement for low-energy RHIC (with electron cooling) February 2, 2012.
J. Alessi RF Structures EBIS Project Technical Review 1/27/05 RF Structures J. Alessi Some general thoughts on what our approach will be.
Design of an Isochronous FFAG Ring for Acceleration of Muons G.H. Rees RAL, UK.
1 FFAG Role as Muon Accelerators Shinji Machida ASTeC/STFC/RAL 15 November, /machida/doc/othertalks/machida_ pdf/machida/doc/othertalks/machida_ pdf.
1 Studies of electron cooling at DESY K. Balewski, R. Brinkmann, Ya. Derbenev, Yu. Martirosyan, K. Flöttmann, P. Wesolowski DESY M. Gentner, D. Husmann,
ERHIC design status V.Ptitsyn for the eRHIC design team.
9/24-26/07 e- KOM Slide 1/20 ILC Polarized e- source RDR Overview A. Brachmann.
BROOKHAVEN SCIENCE ASSOCIATES Electron Cooling at RHIC Enhancement of Average Luminosity for Heavy Ion Collisions at RHIC R&D Plans and Simulation Studies.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Brian Sheehy Laser and Timing.
Thomas Roser EIC AC meeting November 3-4, 2009 EIC Accelerator R&D Strategy and Programs Thomas Roser/Andrew Hutton BNL / Jefferson Lab R&D program is.
Starting cost discussion Vladimir N. Litvinenko Brookhaven National Laboratory, Upton, NY, USA Stony Brook University, Stony Brook, NY, USA Center for.
Preliminary MEIC Ion Beam Formation Scheme Jiquan Guo for the MEIC design study team Oct. 5,
Overview of Collective Effects in MEIC Rui Li MEIC Collaboration Meeting Oct. 6-8, 2015.
Prospects for RHIC Low-Energy Operations Todd Satogata (W. Fischer, T. Roser, A. Fedotov, N. Tsoupas, M. Brennan, C. Montag, and others) “Can We Discover.
Synchronization Issues in MEIC Andrew Hutton, Slava Derbenev and Yuhong Zhang MEIC Ion Complex Design Mini-Workshop Jan. 27 & 28, 2011.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Jorg Kewisch, Dmitri Kayran Electron Beam Transport and System specifications.
MeRHIC Internal Cost Review October, Dmitry Kayran for injector group MeRHIC Internal Cost Review October 7-8, 2009 MeRHIC: Injection System Gun.
1 RHIC II – Ion Operation Wolfram Fischer RHIC II Workshop, BNL – Working Group: Equation of State 27 April 2005.
Beam-beam Simulation at eRHIC Yue Hao Collider-Accelerator Department Brookhaven National Laboratory July 29, 2010 EIC Meeting at The Catholic University.
9MHz LeRHIC Cavity Design Salvatore Polizzo RF Design Engineer May 16, 2014.
LER Workshop, Oct 11, 2006Intensity Increase in the LER – T. Sen1 LHC Accelerator Research Program bnl-fnal-lbnl-slac  Motivation  Slip stacking in the.
1 Machine issues for RHIC II Wolfram Fischer PANIC Satellite Meeting – New Frontiers at RHIC 30 October 2005.
P OSSIBILITIES FOR MAINTAINING AA AND PP CAPABILITIES IN PARALLEL WITH E RHIC V. Ptitsyn Collider-Accelerator Department BNL RHIC and AGS Users Meeting,
Longitudinal aspects on injection and acceleration for HP-PS Antoine LACHAIZE On behalf of the HP-PS design team.
ECOOL Meeting 03/26/10 1 Electron beam transport for FNAL electron cooler E-cooling is referred as “non-magnetized” OVERVIEW Material is taken from FNAL’s.
EC plans in connection with eRHIC Wolfram Fischer ILCDR08 – Cornell University, Ithaca, New York 10 July 2008.
Alexei Fedotov, December 7, Beam parameters and collective effects for pEDM ring (December 7, 2009)
R&D Topics for FOA Funding Proposals
Electron Source Configuration
Why CeC is needed? High luminosity of US future electron-ion collider(EIC) is critical for success of its physics program 2018 NAS Assessment of U.S.-Based.
Physics Design on Injector I
Summary of Beam Cooling Parallel Session
07/22/2019 Dhananjay Ravikumar
Injector for the Electron Cooler
MEIC New Baseline: Part 10
12 Steps to a Cooler Design
JLEIC 200 GeV Ion Injector Chain and Bunch Formation
MEIC New Baseline: Luminosity Performance and Upgrade Path
Main Design Parameters RHIC Magnets for MEIC Ion Collider Ring
Synchronization in MEIC
JLEIC Main Parameters with Strong Electron Cooling
MEIC New Baseline: Part 7
MEIC New Baseline: Performance and Accelerator R&D
More on MEIC Beam Synchronization
HE-JLEIC: Do We Have a Baseline?
Some Thoughts on the JLEIC Ion Injector
Optimization of JLEIC Integrated Luminosity Without On-Energy Cooling*
Beam Synchronization in MEIC: The Problem, Scale and Prospect
Presentation transcript:

Overview of Low Energy RHIC e-Cooler (LEReC) project and needed RHIC upgrades Vladimir N. Litvinenko Department of Physics and Astronomy, Stony Brook University Collider-Accelerator Department, Brookhaven National Laboratory Center for Accelerator Science and Education August 13,

Content: my talk is an introduction to the detailed description of the LEReC 11:00 Expected luminosity performance with cooling – A. Fedotov 11:30 Layout, infrastructure and engineering - J. Tuozzolo 13:30 Electron cooling specifications and parameters – A. Fedotov 14:00 SRF accelerator – S. Belomestnykh 14:30 Laser and photocathode – B. Sheehy 15:30 Electron beam transport and dynamics – D. Kayran 16:00 Beam stability and requirements on technical components – I. Pinayev 16:20 RHIC and AGS aspects for low-energy operation – M. Blaskiewicz 16:40 Effects on hadron beam from electron bunches – G. Wang 2

LEReC Goals Enable RHIC low-energy collisions of heavy ions (from about 3.8 GeV/n to 10 GeV/n with about ten-fold higher luminosity Reduce, if possible, beam-losses and associated back- ground Build a compact, in-tunnel system Fit within a single AIP budget Re-use as much as possible of existing/or planned infrastructure 3

4 © A. Fedotov What is possible?

How to cool ? 5

What was considered? Moving FNAL’s Pelletron Using ERL SRF Gun (704 MHz) Using existing RHIC RF system Various locations in RHIC: IP4, IP2, IP12 Magnetized e-beam Finished with –a stand-alone 2-cell 5 MeV SRF Gun/Linac –operating at low frequency ~ 100 MHz –using 500 MHz NC RF cavity for flat-top acceleration –cooling two beams with a single accelerator –located at IP2 –re-using a lot of hard-ware presently built for CeC Proof-of-Principle experiment 6

Fundamentals The main limitations for the RHIC luminosity at low energies are coming from: –Space-charge dominated beam-dynamics –Shrinking dynamic aperture –Shrinking RF bucket –IBS Additional limitation: –Limited tunability of existing RHIC RF allows to collide beams only at a very limited number of energies below 10 GeV/u (3 to 4) 7

RF 8 Three main scaling –the energy acceptance is proportional to 3/2 power of beam energy: –the voltage required to keep constant acceptance is proportional to cube of the harmonic number (i.e. doubling RF frequency requires 8-fold increase in voltage!) –increasing the bunch-length (e.g. space-charge effects mitigation) require low voltage and/or low harmonic number

Acceptances of Existing RHIC RF Systems (in eV*sec) MHz RF Systems

4.5MHz Cavity C&F –A concept and feasibility study has been started to propose a 4.5MHz cavity design for the new low energy gold program. –Two design typologies are being considered for this effort. Ferrite Loaded Cavity A ferrite loaded cavity design has been fabricated and initial performance testing has been performed. Alumina Disk Reentrant Cavity Preliminary simulations of an alumina disk reentrant cavity design have been completed and plans to build a scaled down version currently underway. © A. Zaltsman

4.5MHz Cavity C&F Ferrite Loaded Cavity –Center Frequency = 4.7MHz –Q = 22 –Drive Power = 2KW –Max Voltage = 4KV (Without Bias) © A. Zaltsman

4.5MHz Cavity C&F Alumina Disk Reentrant Cavity –Center Frequency = 4.55MHz –Estimated Q = 4000 –Estimated Drive Power = 5KW –Max Voltage = 40KV © A. Zaltsman

Choosing 4.5 MHZ RF system Low frequency RF has serious advantages –Long bunches to increase bunch intensities and provide room for cooling – Large longitudinal acceptance Without low frequency RF the luminosity can not be increases at low energies (below 7 GeV/u) very the increase of the luminosity is the most critical It is also broadly tunable to cover all necessary energies for LE RHIC scan –γ=4.1 require 3% tunability –γ=2.55 will require 8% tunability The number of RF bucket will be constant (60) independent of the beam energy Collisions occurring in both RHIC detectors –Tunable 9 MHz tunable RF cavities would provide for a slightly higher luminosity (because of 2x bunches) but would require 8 times higher voltage, and would be significantly more expensive. 13

Timing: Need to tunable RF Cooling beams in two ring simultaneously requires that length of the e-beam loop (measured from the IP) will be an integer number of the distance between ion bunches If number of the bunches (as in a current operations) is changing, then the loop’s length has to be adjusted Tuning RF frequency and keeping distance between buncher of 1/60 th of RHIC circumference fixes the geometry of the cooler 14

Timing is important! Using ~24 th harmonic of 4.5 MHz (e.g. ~108 MHz) SRF electron accelerator for LEReC Since SRF frequency is not widely tunable, in general we are operating with electron bunches sliding through the hadron beam Estimation for a worst case (1 kick, 9 free passes, full mix in 10 turns) modulation of the focusing scenario could cause emittance growth time of ~ seconds for 4.5 MHz case and 12.5 sec for 28 MHz case Solution is to keep fixed e-beam pattern over-lapping the hadron bunch

Patterns at s=0 Electron beam has following pattern: Hadron sees on Nth turn Pattern repeats itself if

Fixed pattern condition In our case let’s select energy of 10 GeV/u: Lets introduce fixed pattern conditions RHICCircumference m Central energy10GeV   fo E+04Hz ho1440

Fixed pattern condition m  E, GeV/n ……………………………

There are 100 points satisfying this condition between 2.65 GeV/u and 10 GeV/u This is sufficient for a detailed energy scan

CeC Proof-of-Principle Experiment 40 GeV/u Au ions cooled by 22 MeV electrons Under contraction Commissioning/test should start in 2015

Using CeC PoP experience and infrastructure

22 Details Top Level Conclusion Based on the physics of the process (and some considerations of the costs) we made choices for main components of the electron cooler In combination with tunable 4.5 MHz RF system this system promises to deliver 10-fold boost in RHIC luminosity at energies below 10 GeV/u The beam dynamics, IBS and cooling simulation indicate that the required cooling speed as well as ion beam parameters Our predictions are based on the space charge and the beam-beam parameters demonstrated in RHIC energy scan I We did not find any show-stoppers for current design There is synergy with CeC PoP experiment Engineering of the system will start after this review