Approximately 3 ounces of gold from the mine
Water pump, 2,000 gallons a minute
Loader taking a bucket of gravel to wash plant
Loader dumping material into wash plant Loader dumping material into wash plant
Loader finished dumping gold bearing material into wash plant
Cat ready to push coarse tailings from discharge deck of DeRocker washplant
Loader and cat at work feeding the wash plant and removing tailings
Cat and loader doing their job
Gold recovered from 300 cu. Yards of pay gravel Gold recovered from 300 cu. Yards of pay gravel
Float plane arrives with visitors to our lease
Unloading visitors from Plane