SPILL – RESISTANT VACUUM BREAKER ASSEMBLY SVBA TESTIN G.

Slides:



Advertisements
Similar presentations
Inspect Water Distribution EO Air Gaps, Vacuum Breaker, and Back Flow Preventers TP 8 50 min.
Advertisements

Lockout/Tagout Awareness Training
The idea evolved from two different contractor customers who shared with us a better way to perform hydrostatic testing of DWV piping system. Two different,
SKA-Pak Plus Mobile Air Cart Con-Space Link
CHAPTER 45 Engine Lubrication.
“The Strength of Experience”
Scott 4.5 Introductory SCBA.
Draeger BG-4 Self Contained Breathing Apparatus
PRESSURE TEST Hook tester up to tank inlet line. Pump tester up to 10psi (.7 bar) The line and carb should hold pressure for 1-min. Checks for leaks at.
General Rules Compressed gases and cylinders must be properly stored, transported and used to prevent injury and accidents. Compressed gases and cylinders.
Job Performance Requirement 7-13 Servicing an SCBA Cylinder Using a Cascade System.
Intermediate SFFMA Objectives: – Hrs received.
Morgan City Rentals Diesel Jet Pump 6 x 6 Peerless Safe Operating Practices and Procedures.
3.7.6 Student Book © 2004 Propane Education & Research CouncilPage Identifying Procedures for Conducting Container Vapor Flaring Operations Before.
Water Based Sprinkler Systems 2 major different types of water sprinkler systems Wet pipe system Dry pipe system.
Potential Pathways for Coliform Contamination. Fixing Positive Coliform Results.
Getting Started with the EVAPro ™ After you remove your EVAPro from the box, check to make sure you have all accessories shown below. Click here for next.
Backflow Training Introduction to Backflow For Irrigation Systems.
ResQmax Line Deployment Kit -ResQmax Launcher- 5 nozzle protectors -2 Streamline Projectiles- O-ring kit -500’ 3mm line with container- Corrosion block.
Filling, purging and air removal
Boiler Mountings.
F LOTEC Training Presentation for Authorized Repair Centers This presentation is designed to supplement M-Service Manual InGage Regulator.doc Flotec, Inc.
"AIR COOLER" Heat Exchanger
© Goodheart-Willcox Co., Inc.  Cooling system diagnosis  Cooling system problems  Thermostat service  Cooling system hose service  Radiator and.
Dennis Sabre Fire Appliances
Lockout - Tagout Control of Hazardous Energy CFR
2.5.6 Student Book © 2004 Propane Education & Research CouncilPage Operating a Propane Dispenser to Fill Vehicle-Mounted ASME Tanks To safely and.
3.2.2 Student Book © 2004 Propane Education & Research CouncilPage Performing DOT Cylinder Evacuation and Vapor Flaring Operations Before DOT cylinder.
Hydronic Mechanical Controls
Hydraulics For The Long Term
Series Operational Training. 2 Water Tank Water Pump Multiple Discharges 2000 Series Line Strainer Foam Tank Electronic Direct Injection Proportioner.
3.7.5 Student Book © 2004 Propane Education & Research CouncilPage 1 A full understanding of the operation of the liquid evacuation process if essential.
Left side compressor behind Left control box Right side compressor behind Right control box.
Placing Vapor Distribution Systems and Appliances into Operation MODULE 8 System Tests.
Gasoline fuel supply systems Function: store, transport, Pressurize and filter gasoline going to carburetor or fuel injection system.
TIDBITS Hose made pryor to July 1987 will be taken out of service Hose that is frozen will be service tested again Color’d Hoses All test gauges.
Water Supply Skill Drills.
Drinking Water + Compressed Air = Dangerous Mixture Spokane Regional Cross Connection Control Chapter Requirements for Winterizing Irrigation Systems with.
Specification & Installation pitfalls “Getting it right to ensure safe drinking water”
Lockout - Tagout Control of Hazardous Energy OSHA Standard
TRENTON Casing Filler Presentation
400A & 600A Heavy Duty Safety Switch NEMA 4X, NEMA 12 Replacement Instructions for Vault Handle and Linkage Assembly.
Student Book © 2004 Propane Education & Research CouncilPage Performing Gas Distribution System Leak Checks Requirements for vapor distribution.
Backflow Prevention for Fire Sprinkler Systems State of Illinois Plumbing Code.
Lockout/Tagout.
3.1.8 Student Book © 2004 Propane Education & Research CouncilPage Identifying Procedures for Conducting Container Vapor Flaring Operations Before.
OILGEAR PVV PUMPS PVV 200 Performance Curves.
Backflow Preventer Replacement Made Easy BY: Kenny Robbins.
15 Water Supply. 15 Objectives (1 of 2) Discuss rural water supplies. Describe how portable tanks are used to supply water for firefighting. Describe.
Procedures.
Tips on how to winterize your lawn sprinkler system Benefits of using Lawn Sprinkler Systems.
Vertical Pump Motor Manifold Upgrade. VPMM Replaces Existing Pumps, Motors, Relief Valves, Check Valves, Discharge Filters, Pump Running Pressure Gauges,
Gauge Installation and Removal Procedures By: Inmer Amaya.
Chapter 18 The Clutch System.
Workshop developed by RCAP/AWWA and funded by the USEPA
14 Refrigerant Recovery, Recycling, and Recharging.
R1 Fundamentals of Refrigeration
SAFE WORK INSTRUCTIONS
Student CD for Commercial Refrigeration for A/C Technicians Chapter 12 Ice Machines.
Effective Methods to Test the Fuel Pressure Regulator in your Car.
Alabama Tools Seminars
CHAPTER 45 Engine Lubrication.
R1 Fundamentals of Refrigeration
2 Fire Fighter Safety.
NEW COMPLIANCE REGULATIONS
Instructions: Adding refrigerant fluid to system
Backflow Devices 5 Types.
Compressor Operating Instructions
Bella Vista Fire Department Procedures on Sprinkled Buildings
Presentation transcript:

SPILL – RESISTANT VACUUM BREAKER ASSEMBLY SVBA TESTIN G

Review of Backflow Prevention Assembly Test Procedures and Diagnostics These procedures are intended as a review of basic test procedures and diagnostics intended for trained and experienced BAT testers. These procedures are used in many areas of the U.S. and Canada. The enclosed test procedures are not intended as a replacement for Approved Backflow Assembly Tester Education and/or Backflow Assembly Tester Certification, as required in many areas.

SPILL- RESISTANT VACCUM BREAKER FAILED TO OPEN AIR INLET OPENED 1.0 PSID or Greater PSID CONTINUED TO OPEN FULLY X YES NO CHECK VALVE PASSED 1.0 PSID or Greater PSID FAILED PASSED TEST x YES NO REMARKS:

EXAMPLES OF REQUIRED PRELIMINARIES IDENTIFY INSPECT OBSERVE - Obtain permission to turn water off to test assembly including and estimated time water will be off. Fire sprinkler systems require additional notifications. NOTIFY - Verify make, model, size and serial number to insure the correct assembly the is being tested. - Assembly shall be installed correctly and listed on the current “Assembly Approved List” - General condition of assembly, direction of flow, shut off valves and test cocks properly located and usable.

PRELIMINARY STEPS NOTIFY IDENTIFY INSPECT OBSERVE

REMOVE CANOPY

FLUSH TC

FLUSH VENT VALVE LOOSEN VENT VALVE SCREW UNTIL WATER TRIPS, THEN CLOSE

CONNECT TEST KIT UNUSED HOSES ARE RAPTED OR REMOVED

CLOSE ALL VALVES CONNECT TEST KIT

INSTAL COMPENSATING VALVE NO TC # 1

HIGH HOSE TO COMPENSATING VALVE CONNECT TEST KIT

PURGE OPEN TC

OPEN HIGH BLEED: FILL AIR INLET VALVE WITH WATER:CLOSE HIGH BLEED WHEN PURGED PURGE FILL AIR INLET VALVE

ISOLATE CLOSE SOV #2

ELEVATE TEST KIT ISOLATE CENTER LINE OF TEST GAUGE MUST BE MAINTAINED AT THE SAME LEVEL AS THE VENT VALVE WHILE TESTING CV & INITIAL OPENING POINT OF AIR INLET VALVE

CLOSE SOV #1 ISOLATE

CV TEST REDUCE PRESSURE TO ATMOSHERIC DOWNSTREAM OF CV EXPECTATIONS?? PSID REDUCES, FLOW FROM VENT VALVE CEASES AND GAUGE STABILIZES, PSID ACROSS CV SHALL BE 1.0 PSID OR GREATER O WHEN PSID REDUCES, FLOW FROM VENT VALVE CEASES, CV DOES NOT HOLD 1.0 PSID OR PSID MAY OR MAY NOT REDUCE AS FLOW CONTINUES FROM VENT VALVE

SLOWLY OPEN AND VENT VALVE SCREW CV PSID

O REMOVE VENT VALVE SCREW TEST KIT MUST REMAIN ELEVATED

VENT SCREW TEST KIT REMAINS ELEVATED WHEN FLOW CEASES FROM VENT VALVE & GAUGE STABILIZES; CV SHALL HOLD TIGHT AT 1.0 PSID OR GREATER (RECORD CV PSID LATER WHEN GAUGE IN LOWERED).

INITIAL OPENING POINT REDUCE WATER PRESSURE IN BODY EXPECTIONS? AIR INLET VALVE SHALL INITIALLY OPEN AT OR GREATER THAN 1.0 PSID AIR INLET VALVE DOES NOT OPEN OR AIR INLET OPENS BELOW 1.0 PSID OR AIR INLET TEST

STEP 1: AIR INLET VALVE INITIAL OPENING POINT 1. REDUCE PSID BY SLOWLY OPENING HIGH BLEED MAXIMUN OF ¼ TURN. TEST KIT REMAINS ELEVATED

WATER ON TOP OF AIR INLET VALVE WILL SUDDENDLY DROP OR FLOW FROM VENT VALVE AT INITIAL OPENING POINT O AIR INLET VALVE OPENING PSID initial opening point 2. OBSERV PSID REDUCE SLOWLY TO THE INITIAL OPENING POINT OF THE AIR INLET VALVE. 4. RECORD INITIAL PSID PENING POINT 3. LOWER TEST KIT

SPILL- RESISTANT VACCUM BREAKER FAILED TO OPEN AIR INLET OPENED 1.8 PSID CONTINUED TO OPEN FULLY YES NO CHECK VALVE PASSED 4.2 PSID FAILED PASSED TEST YES NO REMARKS: 5) RECORD CV PSID (4.2) AND AIR INLET INITIAL OPENING PSID (2.0 PSI)

EXPECTIONS? OBSERVE AIR INLET VALVE CONTINUES TO OPEN FULLY AIR INLET VALVE DOES NOT CONTINUE TO OPEN FULLY OR STEP 2: OBSERVE AIR INLET CONTINUES TO OPEN FULLY

1. CLOSE HI BLEED VALVE (TEST GAUGE) ONCE CV PSID VALUE AND INITIAL OPENING POINT OPENING OF THE AIR INLET VALVE IS RECORED……… AIR INLET VALVE CONTINUES TO FULLY OPEN

2. REMOVE HI BLEED HOSE FROM COMPENSATING VALVE TO ALLOW WATER TO DRAIN FROM THE SVBA BODY.

AIR INLET VALVE CONTINUES TO FULLY OPEN 3. WHEN THIS FLOW OF WATER STOPS, OBSERVE AIR INLET VALVE CONTINUES TO FULLY OPENED. OBSERVE AIR INLET FULLY OPENED REPORT AND RECORD AIR INLET CONTINUED TO FULLY OPEN.

SPILL- RESISTANT VACCUM BREAKER FAILED TO OPEN AIR INLET OPENED 1.8 PSID CONTINUED TO OPEN FULLY X YES NO CHECK VALVE PASSED 4.2 PSID FAILED PASSED TEST YES NO REMARKS:

INSTALL VENT VALVE SCREW RETURN TO SERVICE CLOSE CV #1

CLOSE TC RETURN TO SERVICE

CLOSE TC RETURN TO SERVICE

OPEN SOV #1 RETURN TO SERVICE

OPEN SOV #2 RETURN TO SERVICE

REMOVE VALVE COMPENSATING VALVE RETURN TO SERVICE

INSTALL CANOPY RETURN TO SERVICE

“I WILL NOTIFY OWNER, WATER IS BACK ON & ASSEMBLY PASSED”. IN CLASS…….. “I’M DONE TESTING THIS ASSEMBLY” “I WILL CORRECTLY FILL OUT TEST REPORT”

SPILL- RESISTANT VACCUM BREAKER (SVBA) FAILED TO OPEN AIR INLET OPENED 1.8 PSID CONTINUED TO OPEN FULLY X YES NO CHECK VALVE PASSED 5.2 PSID FAILED PASSED TEST x YES NO REMARKS: