( 1 ) PROCEDURE FOR FLAT HEAT PRESS OPERATION PROCEDURE FOR MULTI FUNCTION HEAT PRESS MACHINE.

Slides:



Advertisements
Similar presentations
Bardia Baheri Rotary High Voltage Motor Physics project.
Advertisements

How To Install RAM In Laptop Installing Larger RAM is the easiest way speed up your laptop computer. This Post will guide you about installing laptop computers.
Data Projector Setting Up/Connecting Laptop & Data Projector.
Zebra® 105SL™ * Removing and Installing Printhead
DS1000B-RM/ DS1500B-RM Battery Replacement Procedure.
Cap Sewing with HCS-1201 Voyager
My Picture is Upside Down! HELP!!. Check your Remote # 2 NEC # 1 Mitsubishi.
Setting Up a Tripod. Unscrew the center knob at the collapsed tripod base to loosen, and then re-tighten it once all the legs are fully extended.
Copar Corporation CTC Wrap Arm Calibration Procedure Office: Fax:
How to use a Heart Rate Monitor. Equipment needed Heart Rate Monitor Watch Transmitter Strap.
Frame Assembly Produced by Ed Latimer, Team 476 Ken York, Team 476 Ron Markum, Team
Optical Manufacturing Solutions 1 Probe Assembly.
Sandblasted, repainted fender brackets. Mudflaps and rubber buttons to attach them.
Digital StarLab Set-Up, Operation, Maintenance, and Teacher Manual for the Digital StarLab are in the links below or on the training tab in the BlackBoard.
6200 Calorimeter Operation Colby College Version Parr Instrument Company.
MyLock 644D Service Seminar.
HTS5120 Rework Instruction for service centre Nov 18, 2010.
ES1000C/1500C Battery Replacement Procedure. 1.Pull off the front panel.
Head jig usage procedure RKC London Office. Set the head jig 2) Put two screws with loose condition 3) Lock the plate 4) Tighten two head jig screws 5)
ORYX Microbatch Screening Ran Meged -1-. Microbatch oil protein & reagent solution -2-
L2000 Technical Training 6. Assemble/Disassemble.
Abaxis Piccolo xpress The piccolo xpress™ chemistry system is compact and easy to transport. The system consists of a portable analyzer and single-use.
Mitsubishi RA90 4 axis Wire EDM
CE 260 SURVEYING CHAPTER 5.
1 © 2011 Profile Recorder for ProtoFlow S Installation Instruction.
1 Student Hands On Training I (2007) Timing Circuit & Camera Integration Timing Circuit & Camera Integration.
MC11000 Kit Replacement 1 1. Open the face plate and remove the 2 screws. Remove and discard the original face plate. 3. Remove the 2 white caps on the.
RT 408 Repairing manual. Chapter one The whole machine problems.
AV/Xerox On your way to being real nerds…. Audio/Visual Equipment Every Carbarn classroom is the same! Note: The projectors are controlled by the opposite.
FROST I Site Initiation Visit version 1.4. IVTM System.
Transformation of Energy During Digestion Lab Investigation: Purpose: To find our what type of energy is released during digestion Hypothesis: I think.
Example – Solve the system of equations below We will do this graphically on our calculator. We first need to isolate y in each equation.
I. The whole machine problems. 1. Machine does not work properly Possible causes : 1 ) How to test the voltage: transfer the millimeter to voltage range(20V),
MODEL : EDF-102 SERIES 1. APPLICATION The EDF-102 thermostat is designed to provide temperature control of heating or cooling systems in villas, hotels.
PS500B/800B Battery Replacement Procedure. 1.Remove the two screws at the bottom of the front panel. 2.Push down then remove the front panel.
PS1500B Battery Replacement Procedure. 1.Pull off the front panel.
Natura Water Machine B and D Series 3 – Dispense tower plumbing kit Kit number Kit includes components used for both Natura B and Natura D series.
Holding Down and Chocking The engine must be securely fixed to the ship. For this the engine is mounted on resin or cast iron chocks and bolted to the.
PREPARATIONS TOOLS : 1 、 wire stripper 2 、 coating stripper 3 、 fiber length measurement 4 、 cutter QUICK ASSEMBLY CONNECTOR 1.
WS50(Stratacache) Software updating guide (By Using USB)
Our Vision. Your Safety ™
Sikes & West S4P3a: Identify simple machines and their uses.
Chapter 3 Device Monitor Screen Otasuke GP-EX! Chapter 3 Device Monitor Screen Chapter 3 Device Monitor Screen.
Oregon Robotics Tournament and Outreach Program RCX Basics.
PS2200B/3000B Battery Replacement Procedure. 1.Disconnect the wire connecting the UPS and the battery pack. 2.Pull off the battery pack front panel.
PRINTMAKING. Definition: involves repeating a design from a specially prepared surface. Types of Printmaking: 1.Relief Printing – the process of making.
Simon Calibration Instructions Main Antenna Jig Peter Karlsson V2.
Parts of the Bernina 240 Sewing Machine Dalton- Clothing Instructions: Please go through The Parts of the Sewing Machine and explore each part on your.
Getting Started with your Diagnostic Station Getting Started with your Diagnostic Station.
Rapid Change Technology The following is a presentation to aid Technicians in the replacement of the Rapid Change Technology Block.
Connecting a SmartBoard: A How-to Guide Created by Julie Santaniello Staff Developer Title IIB Math & Science Partnership Grant.
PLC programming Part 3: Problems with solutions. Topics  Every problem is devided into three parts:  Technology description contains the general properties.
1 Touch Screen Voting Device Training Election Systems & Software.
Touch Screen Voting Device Training Election Systems & Software Presented by: Bill Lowe.
To install the four wires from the back of the coil machine, loosen the four knobs. Keep each wire in center under each knob, off to the side will allow.
Caster - engineers in the front seat
Front panel wiring PICO 155
Simple Machines.
5 pcs ,fasten the tray, please pay attention ,
To install the four wires from the back of the coil machine, loosen the four knobs. Insert each of the four wires from the side under the knobs. Keep each.
Disassembly and Assembly of A900C-W Electronic Governor Actuator for P8 Fuel Injection Pump
Reader Swap out Guide.
Step 1:Disassemble battery case
Task 1 You are going to use the Makey Makey arrow inputs to create a joystick / games controller. Step 1: Connect Makey.
Oregon Robotics Tournament and Outreach Program
5 pcs ,fasten the tray Screw 1 and 2 are the same. 1 for the body and tray, 2 for body and cover, 3 for body and columns.
Step 1:Disassemble battery case
Step 1:Disassemble battery case
Step 1:Disassemble battery case
Presentation transcript:

( 1 ) PROCEDURE FOR FLAT HEAT PRESS OPERATION PROCEDURE FOR MULTI FUNCTION HEAT PRESS MACHINE

① Put the machine on a flat surface

② Connect power

③ Push down Red button and turn on the machine

④ After three seconds, machine display as below picture.

⑤ Press “SET”, upper line shows the machine real temperature, the lower line shows the set –up temperature.

⑥ Press “SET”, there are two lines displayed: upper line shows 5P, lower line shows set-up temperature.

⑦ Press to set the temperature needed.

⑧ Press “SET” again, upper line shows 5F,lower lines shows original set time.

⑦ Press to set the time needed.

⑩ Then press “SET” again, upper line shows machine real temperature, lower line shows set temperature.

11 、 When upper line temperature shows the same with the lower line set-up temperature.

12 、 Put the material on the machine

13 、 Put the heat transfer paper on the material

14 、 Press down the upper plate, and then press “Green button”

15 、 When the time shows “0”, means the heat transfer process finished.

( 2 ) PROCEUDER FOR CUP HEAT PRESS OPERATION PROCEDURE FOR MULTI FUNCTION HEAT PRESS MACHINE

① Put the machine on a flat surface

② Change the relative power wire.

③ Press “Red button” to turn on the machine

④ Three seconds later, screen display as below:

⑤ Press “SET”, upper line shows the machine real temperature, the lower line shows the set –up temperature.

⑥ Press “SET”, there are two lines displayed: upper line shows 5P, lower line shows set-up temperature.

⑦ Press to set the temperature needed.

⑧ Press “SET” again, upper line shows 5F,lower lines shows original set time.

⑦ Press to set the time needed.

⑩ Then press “SET” again, upper line shows machine real temperature, lower line shows set-up temperature.

11 、 When upper line temperature shows the same with the lower line set-up temperature.

Remark How to change the cup heating platen?

① Loose the screw on the cup platen as below:

② Change other size heating platen and fasten screws.

③ Connect the wire.

(3) PROCEDURE FOR PLATE HEAT PRESS OPERATION PROCEDURE FOR MULTI FUNCTION HEAT PRESS MACHINE

① Put the machine on a flat surface

② Loose the screws on the upper heating plate, see below picture Screws should be loosen.

③ Picture for all screws are loosen.

④ Take away the upper heating plate.

⑤ Prepare the heating part for plate.

⑥ Install the heating part according to below picture and fasten the screws.

⑦ Picture after heating part installation:

⑧ Connect the power

⑨ Push down Red Button and turn on machine

⑩ After three seconds, machine display as below picture.

11 、 Press “SET”, upper line shows the machine real temperature, the lower line shows the set –up temperature.

12 、 Press “SET”, upper line shows 5P, lower line shows set-up temperature.

13 、 Press to set the temperature needed.

14 、 Press “SET” again, upper line shows 5F,lower lines shows original set time.

15 、 Press to set the time needed.

16 、 Then press “SET” again, upper line shows machine real temperature, lower line shows set temperature.

17 、 When upper line temperature shows the same with the lower line set-up temperature, then you can process plate heat transfer.

( 4 ) PROCEDURE FOR HAT HEAT PRESS OPERATION PROCEDURE FOR MULTI FUNCTION HEAT PRESS MACHINE

① Put the machine on a flat surface

② Loose the screws on the upper heating plate, see below picture Screws should be loosen.

③ Picture for all screws are loosen.

④ Take away the upper heating plate.

⑦ Loose the two screws under the lower heating plate. Loose these two screws.

⑧ Picture after two screws loosen out

⑨ Move away the lower heating platen

⑩ Picture after heating platens are moving away.

11 、 Picture after heating platens are moving away.

12 、 Loose the two screws in the middle The two screws

12 、 Picture after two screws loosen.

13 、 Fasten the lower heat platen.

14 、 Fasten the screws in the front

15 、 Fasten the screws in back side.

13 、 Lower hat heat platen installation is finished.

14 、 Fasten the screws to fix the upper hat heat platen.

15 、 Picture after both platens fixed.

16 、 Connect power wire.

17 、 Now, installation finish

18 、 Press Red Button to turn on machine.

19 、 After three seconds, machine display as below picture.

20 、 Press “SET”, upper line shows the machine real temperature, the lower line shows the set –up temperature.

21 、 Press “SET”, upper line shows 5P, lower line shows set-up temperature.

22 、 Press to set the temperature needed.

23 、 Press “SET” again, upper line shows 5F,lower lines shows original set time.

24 、 Press to set the time needed.

25 、 Then press “SET” again, upper line shows machine real temperature, lower line shows set temperature.

26 、 When upper line temperature shows the same with the lower line set-up temperature, then you can process hat heat press.