I’ll Be Done in a Flash! An Arc-blast Incident Presented by:

Slides:



Advertisements
Similar presentations
Electrical Safety Program. How Electricity Works Operating an electric switch is like turning on a water faucet. Behind the faucet or switch there must.
Advertisements

Murray State University
Electrical Safety.
Arc Flash: Electrical Safety in the Workplace CCIA Safety Committee SAFETY ROUNDTABLE April 10, 2012 sm 1.
ELECTRICAL SAFETY-RELATED WORK PRACTICES Qualified Persons Those people that have training in avoiding electrical hazards while working on or near exposed.
This presentation is for illustrative and general educational purposes only and is not intended to substitute for the official MSHA Investigation Report.
CHREID 2008 ELECTRICAL SAFETY Introduction and Overview of Safety Clayton H. Reid September, 2010.
FHM TRAINING TOOLS This training presentation is part of FHM’s commitment to creating and keeping safe workplaces. Be sure to check out all the training.
San Bernard Electric Cooperative, Inc. Arc Flash Assessment.
This presentation is for illustrative and general educational purposes only and is not intended to substitute for the official MSHA Investigation Report.
19 3,600 disabling electrical contact injuries occur every year. 4,000 non-disabling injuries. 12.
Utilizing Only Qualified Persons for Electrical Work can Reduce Risk Presented by: Dennis K. Neitzel, CPE Director Emeritus AVO Training Institute, Inc.
What is Arc Flash? Arc flash is a short circuit through air that flashes over from one exposed live conductor to another conductor or to ground. Arc flash.
Qualified Persons Working On Or Near Energized Equipment
Danger Tags and Locks Picture of the Week Collider-Accelerator Department Take 5 for Safety.
Electrical Hazards Training Presented By: John S. Hillard, CSP Risk Control Consultant
Construction Methods and Materials Electric Electric.
Electrical Safety This material was produced under a grant (SH22249SH1) from the Occupational Safety and Health Administration, U.S. Department of Labor.
Don’t take electricity for granted…. Several months ago, a new contract electrician at a DOE site was performing work under a contract. The electrician.
High Voltage Electrical Safety
1 WELCOME TO Electrical Safety Arc Flash/Blast Injury Prevention Management/Supervisory Course.
Residential Construction Unit 5- Energy Efficiencies and Mechanicals Mr. Todzia.
Trindel Insurance Fund
/0309 Copyright ©2003 Business and Legal Reports, Inc. BLR’s Safety Training Presentations Lockout/Tagout Refresher 29 CFR
CONTROL OF HAZARDOUS ENERGY LOCKOUT/ TAGOUT PROGRAM.
Electrical Safety.
EXAMPLE ELECTRICAL DESIGN OF A SMALL OFFICE
Basic Electrical Safety
Copyright  Progressive Business Publications Electrical Safety.
 The purpose of this Lockout/Tagout Procedure is to have a positive method of confirming that a piece of equipment, machine, or device is not energized.
UTILITY SHUT DOWN PROCEDURES. Introduction Review with all crew members proper shut down procedures for Natural Gas and Electrical in emergency situations.
© Recognizing Electrical Risk Factors Module 2.
Electrical Safety and Electrical Safe Work Practices EHS Course #525 Reference EHS Electrical Safety Procedure
MNM Fatal Electrical Accident Electrical Accident October 10, 2010 (Oklahoma) October 10, 2010 (Oklahoma) Granite Operation Granite Operation Contract.
Pennsylvania Bureau of Deep Mine Safety Lockout/Tagout Program.
Electrical Hazards Temporary Wiring and Lighting Systems.
Control of Hazardous Energy Lockout/Tagout 2 Why bother with lockout/tagout? Lockout and tagout procedures are designed and implemented to protect you.
1 Electrical Safety This material was produced under grant number SH F-18 from the Occupational Safety and Health Administration, U.S. Department.
Electrical Safety, Subpart K
The two types of electricity used in mining are: “AC” or alternating current and “DC” or direct current.
MNM Fatal Electrical Electrical November 18, 2013 (Kentucky) November 18, 2013 (Kentucky) Crushed Stone Mine Crushed Stone Mine Contract Electrician.
NCSX NCSX Safety Meeting The Arc Flash Event at SLAC – How Should We Respond? Wayne Reiersen 20 January 2005.
Survey of Electrician Work Practices Presented at the 135 th Annual Meeting and Exposition of APHA November 5, 2007 Michael McCann, PhD, CIH Director of.
Chapter 3 PHYSICAL INJURY AND CONTROLS 3.2 Electrical Safety
CONTROL OF HAZARDOUS ENERGY (LOCKOUT/TRYOUT). LOCKOUT/TRYOUT The OSHA Standard for the Control of Hazardous Energy (Lockout/Tryout) 29 CFR covers.
3 Ways to Prevent Electric Arc Flash Blasts By Steward Hudson From Designnews.com View Original Article HERE:
Fort Worth Electrician ‎ THE TECHNICIANS AT CADDELL ELECTRIC PROVIDE THE BEST AND MOST COMPREHENSIVE COMMERCIAL ELECTRICAL SERVICES IN THE DFW METROPLEX.
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
San Francisco Electricians. Why Do You Need to Call an Electrician? Most of us have studied that one subject about circuits, electricity, and electrons.
Electrical Safety and Safe Work Practices
SCG-SH-0200 Southern Company Generation Clearance Procedure Awareness Training for Contractors and Nonlisted Personnel.
What is Arc Flash? Electrical arc flash and arc blasts release dangerous levels of heat energy, fire , molten materials, vaporized solids that can be inhaled,
Electrical Safety Lesson 7.
Energy Control (Lockout/Tagout)
Electrical Safety Equipment
Personal Protective Equipment
Electrical Safety Review Compliance Assistance Region IV
OSHA’s Final Rule: Electric Power Generation, Transmission, and Distribution Electrical Protective Equipment Presented to: RESAP Area Administrators Presented.
Contractor Injury – Electrical Arc Flash Washington Site
Health Care Facilities
Murray State University
Electrical Safety Lesson 7.
Identifying Apprentice Line-Workers On-Site Through Color Coding
Lockout/tagout Refresher Training
Click to start.
Electrical Hazards Training
Electrical Hazards By Kory Hildebrand.
2019 ECR Presentation “HOT SKIN”
Presentation transcript:

I’ll Be Done in a Flash! An Arc-blast Incident Presented by:

Company Information ELECTRICAL CONTRACTOR ELECTRICAL CONTRACTOR Residential Residential Commercial Commercial Light Industrial Light Industrial SIC Code: 1731 SIC Code: 1731 NAICS Code: NAICS Code: Service branch performs maintenance Service branch performs maintenance

Company Information In business for 9 years In business for 9 years 2 employees at the job site; 15 total in the Company 2 employees at the job site; 15 total in the Company OSHA History: No history with OSHA, had never been inspected. OSHA History: No history with OSHA, had never been inspected. OSHA Recordkeeping: Only minor incidents, no lost time. OSHA Recordkeeping: Only minor incidents, no lost time.

Safety Program Company has a plan that was set up several years ago (1999) primarily to get contracts with companies that required them to have a program set up. Company has a plan that was set up several years ago (1999) primarily to get contracts with companies that required them to have a program set up. Training is done during toolbox talks on larger projects of more than 5 employees. Training is done during toolbox talks on larger projects of more than 5 employees.

Work to be Conducted Removal of malfunctioning existing 3 phase 480 volt circuit breaker and hardware (fingers, contacts) from a Westinghouse 1,000 amp 3 phase 480 volt Main Distribution Panel (MDP). Removal of malfunctioning existing 3 phase 480 volt circuit breaker and hardware (fingers, contacts) from a Westinghouse 1,000 amp 3 phase 480 volt Main Distribution Panel (MDP).

Work to be Conducted Install a new 30 amp 3 phase 480 volt circuit breaker and hardware, to feed a newly installed sub-panel. Install a new 30 amp 3 phase 480 volt circuit breaker and hardware, to feed a newly installed sub-panel. Requested MDP be shut down, through GC, who made the request to Facilities Management. Requested MDP be shut down, through GC, who made the request to Facilities Management.

Work Site History FM did not want to shut down power and asked to find an alternate power source not affecting the MDP. FM did not want to shut down power and asked to find an alternate power source not affecting the MDP.

Work Site History FM and electrical contractor met to find an alternative. They thought they could get to a second source based on location (did not open walls or ceilings to determine).

Work Site History FM advised EC that they were behind schedule and needed to expedite the work (had to be completed ASAP). FM advised EC that they were behind schedule and needed to expedite the work (had to be completed ASAP).

Day of the Incident Work crew began work on a Friday afternoon (Bank Closed) and as they progressed, they found many obstacles that would take a substantial amount of time to overcome. Work crew began work on a Friday afternoon (Bank Closed) and as they progressed, they found many obstacles that would take a substantial amount of time to overcome. EC called Owner to discuss! EC called Owner to discuss!

Choices to be Made Go back to original plan and tie into the MDP. Go back to original plan and tie into the MDP. Shut the power off for no more than 1 hour. Shut the power off for no more than 1 hour. Work the panel live. Work the panel live. Sub-contract live work specialist. Sub-contract live work specialist. OR OR

CRITICAL CHOICE Continue with the alternative and advise GC that it will take an extra 2-3 days. Continue with the alternative and advise GC that it will take an extra 2-3 days. The FM and EC spoke via phone and a decision was made (based on time element of GC, and inexperience of both) to connect directly to the MDP live and not de-energize. The FM and EC spoke via phone and a decision was made (based on time element of GC, and inexperience of both) to connect directly to the MDP live and not de-energize.

CRITICAL CHOICE

Incident Information The Crew (Master Electrician and (Journeymen Electrician) began work on the MDP, removing the old breaker and contacts (fingers) The Crew (Master Electrician and (Journeymen Electrician) began work on the MDP, removing the old breaker and contacts (fingers)

Incident Information With just the use of a pair of Salisbury Class 1 Type 1 electrical gloves and a pair of Kunz insulated glove protectors, as the only Personal Protective Equipment being used. With just the use of a pair of Salisbury Class 1 Type 1 electrical gloves and a pair of Kunz insulated glove protectors, as the only Personal Protective Equipment being used.

Incident Information The Journeyman began to loosen one of the “fingers” when it began to shift in the direction of a second “finger”. The Journeyman began to loosen one of the “fingers” when it began to shift in the direction of a second “finger”.

Incident Information The Master Electrician grabbed a pair of pliers and the left glove to secure (keep from moving) the “live finger” while the screw was being removed. The Master Electrician grabbed a pair of pliers and the left glove to secure (keep from moving) the “live finger” while the screw was being removed.

Incident Information The Journeyman dropped his screwdriver and proceeded to get another one. The Journeyman dropped his screwdriver and proceeded to get another one. The Master Electrician’s pliers began to lose their grip on the “finger” and he expressed the need to hurry up to the foremen. The Master Electrician’s pliers began to lose their grip on the “finger” and he expressed the need to hurry up to the foremen.

Incident Information As the Journeyman was bent over looking for the screwdriver, the Master Electrician’s grip failed causing the “finger” to buck the other two phases as well as the grounded cabinet.

Incident Information An Arc-Blast occurred leaving both men in a daze and trying to exit the utility room as quickly as they could. An Arc-Blast occurred leaving both men in a daze and trying to exit the utility room as quickly as they could.

What is an Arc Blast? High Amperage Current arcing through air. This is initiated by contact between two energized points (generating High Amperage Current arcing through air. This is initiated by contact between two energized points (generating intense heat, light, sound and pressure!).

What is an Arc Blast? Three Primary Hazards Three Primary Hazards Thermal Radiation - Serious Burns Thermal Radiation - Serious Burns

What is an Arc Blast? Three Primary Hazards Pressure Wave - Possible Concussion

What is an Arc Blast? Three Primary Hazards Projectiles - Molten droplets & Shrapnel

Effects of the Incident Both men were seriously burned and were transported by Helicopter and Ambulance to the Burn Center. Both men were seriously burned and were transported by Helicopter and Ambulance to the Burn Center.

Group Discussion Identify the problems that were the source of the incident. Identify the problems that were the source of the incident. What could have been done to prevent this incident? What could have been done to prevent this incident? List the work practices that should have been implemented. List the work practices that should have been implemented.

Credit Credit: Edward M. Norton, Safety Specialist Credit: Edward M. Norton, Safety Specialist U.S. Department of Labor / OSHA Tampa Area Office U.S. Department of Labor / OSHA Tampa Area Office