Deviations from fiducial locations are unacceptable in areas despite high accuracy at alignment points.

Slides:



Advertisements
Similar presentations
C2 to C5 fit up review-R41 Review of MC Type C to C assembly clearances with C2 to C5 shell surface interface details 12/19/06 Rev 4.
Advertisements

1 A1 / A2 Fit-up Test 3/30/07 T. Brown / A. Brooks A1-A2 fit-up shims.ppt.
WING SUPPORT CONCEPTS FOR WINGS # 2,3,6,7 AND 9 GARY MCGINNIS 09/19/ – TAPPING HOLES FOR STUDS 2 – STUD AND INSERT WELDING 3 – WELDING BRACKETS.
Laser Enclosure to Elevated Rail Assembly Wyman Gordon Forging Locator Original Revision: 2/14/2013.
3 rd Harmonic He Vessel Welding Helium Vessel-to-Cavity No June 2008.
QXFSM1 Mirror Shim System R. Bossert Dec. 1, 2014 LARP Teleconference.
CHAPTER 32 Disc Brake System.
1 MC Assembly via Test Cell Crane FPA Stage 3 Peer Review August 12, 2005 T. Brown.
July GLAST Project Installation Review LATLAT 1 Tracker Tower Installation Review Peter Amnuaypayoat
Zack Wolf BFW Fiducialization October 20, Beam Finder Wire (BFW) Fiducialization Zack Wolf, Dean Walters, James.
Lathe.
Metrology for NCSX Steve Raftopoulos and the NCSX Metrology Team.
DELTA Quadrant Tuning Y. Levashov, E. Reese. 2 Tolerances for prototype quadrant tuning Magnet center deviations from a nominal center line < ± 50  m.
1 Stage 3 Peer Review October 26, 2006 T. Brown. 2 Field Period Assembly (FPA) 1.Make sure the requirements for the tooling is well defined (including.
NCSX Vacuum Vessel Joint Design Mike Viola PPPL July 1 st, 2003.
Tilt meter fiducial Guide rail Abstract This poster covers the survey and alignment techniques selected for installation of the SPIRAL2 accelerator devices.
Analyses of Bolted Joint for Shear Load with Stainless Steel Bushing and Frictionless Shim-Flange Interface Two cases of shim plates were investigated.
1 Dimensional Control for the National Compact Stellarator Experiment R. Ellis, A. Brooks, T. Brown, W. Reiersen, S. Raftopoulos, B. Stratton Presented.
1/12 Sylvain GRIFFET, 17/10/2011 BE/ABP-SU/ Simulations of laser tracker AT401 measurements on TM0 CLIC girders EDMS Document No
1 Stage 3 Peer Review October 26, 2006 T. Brown. 2 Field Period Assembly (FPA) – Stage 3 1.Make sure the requirements for the tooling is well defined.
10/31/2007Mike Viola1 NCSX Field Period Assembly + + = October 31, 2007 Mike Viola Field Period Assembly Manager.
Comments from Rob Durham’s Visit September 24-25, 2007.
Modular Coil Assembly Bolted Joint PDR 2/22/07. Objectives The review objectives include... Define the location of additional inboard bolts Finalize the.
ZDC Remote Handling Tool Structure and Force Analysis P. Debbins University of Iowa December 10, 2009.
NCSX A. Brooks, P. Fogarty, G. Lovett, D. Williamson June 3, 2005 Modular Coil Type-C Final Design Review – Part II.
10/31/2007Mike Viola1 NCSX Field Period Assembly + + = October 31, 2007 Mike Viola Field Period Assembly Manager.
Metrology Milestones Metrology Task Force –Vacuum vessel manufacture - P. Goranson –Mod. Coil Form manufacture - D. Williamson –Mod. Coil winding- S. Raftopoulos.
10/31/2007Mike Viola1 NCSX Field Period Assembly + + = October 31, 2007 Mike Viola Field Period Assembly Manager.
NCSX B. Stratton May 13, 2005 Modular Coil Winding Dimensional Control Plan Peer Review.
NCSX Field Period Assembly (FPA) Operations, Cost and Schedule, Staffing, and Metrology Utilization Mike Viola Field Period Assembly Manager NCSX FPA Peer.
We have to fix the design of the flanges on the 1 st horn frame to which the target support beams are attached.
IRMOS Diffraction Grating Integral Tab Design  Performance of an optical system is highly sensitive to the surface distortion of the optics in the system.
1 Field Period Assembly Office of Science Project Review Princeton Plasma Physics Laboratory Princeton, NJ November 2, 2005 T. Brown Princeton Plasma Physics.
1 MC Assembly over the VV FPA Station 3 FDR Review July 13, 2007 T. Brown.
10/31/2007Mike Viola1 NCSX Field Period Assembly + + = October 31, 2007 Mike Viola Field Period Assembly Manager.
SC Project Review of NCSX, April 8-10, 2008 NCSX Field Period Assembly Mike Viola NCSX Field Period Assembly Manager NCSX Project Review April 8-10, 2008.
SC Project Review of NCSX, April 8-10, 2008 NCSX Machine Assembly E. D. Perry.
1 Stellarator Core Metrology issues NCSX WBS-1 Meeting April 2, 2003 What are we measuring? When? How do we take the measurements? How do we correlate.
1 Assembly Tooling PU Workshop on NCSX Cost & Schedule Princeton Plasma Physics Laboratory Princeton, NJ Mar 1-4, 2007 T. Brown Princeton Plasma Physics.
Bushing Material The bushings are made of G11CR. However, it has been shown that deflections (and bolt stresses) due to shear loads not reacted by friction.
AWB Dimensional Control Requirements for the Modular Coils and TF coils Field Period Assembly Peer Review October 11-12, 2006 Art Brooks.
Field Period Assembly Wayne Reiersen SC Project Review PPPL May 2006.
1 FPA Stage 2 Peer Review May 12, 2006 T. Brown. 2 FPA Stage 2 Status Summary of Stage 2 activities Review current design status Review schedule details.
The Design: Totally bolted, electrically isolated 6 top and 6 bottom inboard flange holes, with tapped holes in one flange and a thru holes in mating flange.
1 Modular Coil Assembly Fixture (MCAF) Information Meeting February 23, 2005.
DRAFT Cost and schedule, staffing, metrology utilization 10 AM October 12, 2006 Mike Viola Field Period Assembly Manager.
9/28/20051 Mike Viola 1, T. Brown 1, P. Heitzenroeder 1, F. Malinowski 1, W. Reiersen 1, L. Sutton 1, P. Goranson 2, B. Nelson 2, M. Cole 2, M. Manuel.
10/31/2007Mike Viola1 NCSX Field Period Assembly + + = October 31, 2007 Mike Viola Field Period Assembly Manager.
SEPT 20, 2006 T. Brown, M. Cole, P. Fogarty, P. Goranson, K. Freudenberg, D. Williamson NCSX STAGE 2 COIL TO COIL ASSY.
8/15/2007Mike Viola1 NCSX Field Period Assembly + + = August 15, 2007 Mike Viola Field Period Assembly Manager.
12/19/2006Mike Viola1 December Lehman Review December 19, 2006 Mike Viola Field Period Assembly Manager NCSX Field Period Assembly + + =
This material is based upon work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC Michigan State.
1 BROOKHAVEN SCIENCE ASSOCIATES 13th International Workshop on Accelerator Alignment October 13-17, 2014, IHEP, Beijing, China Smoothing Based on Best-fit.
Radiation Shutter Re-Purposing Roy Preece STFC RAL 18 th December 2014.
STEP 1: ASSEMBLE INSERT PLATES 1.Assemble insert plates by press fitting roller bearing and adapter plate into assembly 1.1 Prep all mating surfaces to.
VIEW SERIES with Sliding Door
NCSX Vacuum Vessel Fabrication
STEP 1: ASSEMBLE ANGLE PLATES
Annex 4 - Moving Frame and Whiffletree assembly
CLAS12 Beamline Configurations
VIEW SERIES Track Assembly & Installation
STEP 1: ASSEMBLE ANGLE PLATES
T400 Motor Replacement.
Alignment of the first two magnet system modules of Wendelstein 7-X
On the accuracy of port assembly at Wendelstein 7-X
GLAST Large Area Telescope:
TKR and LAT Survey and Alignment Planning
Gaskets and Packing An introduction to Gaskets Packing
Senad Kudumovic Design engineer
Replace Timing Belt 300 Hours.
Presentation transcript:

Deviations from fiducial locations are unacceptable in areas despite high accuracy at alignment points

In particular, the mating flanges do not track each other A2, the coil mounted directly on the fixture, maintains its shape in the z-direction. We would expect that, with the coils properly mated, the “A”. The mating flanges clearly do not track each other after shimming and torquing. –“A1 flg A nopaper” is the measured fiducials on A1 flange A, minus.005” to compensate for Fuji paper that was present.

We may have locked in these deviations as a result of our choice of shim thickness Flange gaps were measured after positioning at inside and outside edges. The calculated shim thickness was derived from flange scans and MCWF fiducial measurement prior to positioning. The “compensated” shim thicknesses are the calculated shim thicknesses, with the average initial z- adjustment that was required [.008”] added.

The difference between calculated [and compensated] shim thickness, and the measured thickness chosen, tracks the deviation on the A1 flange in the worst areas. Compare “gap_comp” with “dz_nopaper”.

Shim number on A1 vs. Poloidal angle

Flange measurements can be used to optimize shim thickness while minimizing the cost and schedule impact. A sample assembly sequence is shown below. Initial modular coil measurements [ required for each modular coil]: Set the modular coil on the fixture, “B” flange down Using the laser tracker, align to the conical seats. –It is necessary to achieve a RMS deviation on.005” or better during the lock-in. Measure the monuments on the fixture in order to establish a global coordinate system that we can return to. Some additional monuments on the walls may be included. This will establish a global coordinate system based on the modular coil geometry. Measure all of the tooling ball monuments on the winding form. –The laser will need to be moved around the perimeter of the part. The final set of measurements must overlap the initial set of measurements. The difference between repeated measurements of the same tooling balls must be.005” or less. Scan the “A” flange of the modular coil. A-A modular coil fitup: Prerequisite: the shim thicknesses at all locations shall have been calculated based on “A” flange scan data from the previous step. Position the first type A modular coil on the fixture, “B” flange down. Obtain a set of “realigned” fiducial positions. Align the laser tracker to the tooling balls on the “A” flange. A rms deviation of less than.005” is required. Measure the monuments on the fixture, and some on the walls, in order to establish a global coordinate system based on the modular coil geometry. Place the initial three shims on the coil in the designated locations, identical to those in the A1-A2 fitup test. Install dial indicators on the modular coil in areas where we expect to see deflection. –This may be less of an issue with the MTM fixtures that we will use for actual assembly.

Sample assembly sequence [continued] Lower the mating type A modular coil into position. Measure the monuments on the bottom coil. Use jacks as needed to bring displaced monuments back to within.002” of their original position. The dial indicators can be used to help with this process. Using three target points, perform the positioning as was done in the A1-A2 fitup test. –If a z-adjustment is required, use the average of the adjustments to derive a “compensated calculated” set of shims. Install the shims, install studs, bushings, supernuts, and torque to 50% of final value. Measure the tooling balls on both coils. The maximum deviation from the “realigned” points should be.007” or less. Re-measure the tooling balls on both coils. If not, loosen all studs, adjust shims locally. Re- torque all studs to 50%. Complete tightening of flange bolts. Install eccentric bushings at three stud locations in order to preserve the relative coil positions after disassembly. Remove all studs, nuts, shims etc. Identify shim locations. A-B modular coil assembly: Place the “A” coil, “A” flange down, on the 20deg fixture. Obtain a set of “realigned” fiducial positions for the “A” and “B” coils. Align the laser tracker to the tooling balls on the coil. RMS deviation should be.005” or better. Measure the monuments on the fixture, and some on the walls, to establish a global system based on the modular coil coordinate system. Scan the “B” flange. Calculate the required shim thicknesses at all stud locations and the nose region. Place three initial shims on the coil’s “A” flange in designated locations. [similar to the A1-A2 fitup test] Lower the B coil onto the A coil. Measure the monuments on the A coil. Jack areas of the coil as necessary to bring displaced monuments back to within.002” of their original position.

Sample assembly sequence [continued] Using three target points, perform the positioning as was done in the A1-A2 fitup test. –If a z-adjustment is required, use the average of the adjustments to derive a “compensated calculated” set of shims. Install the shims, install studs, bushings, supernuts, and torque to 50% of final value. Measure the tooling balls on both coils. The maximum deviation from the “realigned” points should be.007” or less. If not, loosen all studs, adjust shims locally. Re- torque all studs to 50%. Measure the tooling balls on both coils. The maximum deviation from the “realigned” points should be.007” or less. Complete tightening of flange bolts. Measure the tooling balls on both coils. The maximum deviation from the “realigned” points should be.007” or less. Scan the “B” flange of the “B” coil. (A+B) to C modular coil assembly: Place the “AB” assembly, “A” coil down, on the 40deg fixture. Obtain a set of “realigned” fiducial positions. For the “A”, “B”, and “C” coils. Align the laser tracker to the tooling balls on the “A” coil. RMS deviation should be.005” or better. Measure the monuments on the fixture, and some on the walls, to establish a global system based on the modular coil coordinate system. Calculate the required shim thicknesses at all stud locations and the nose region. Place three initial shims on the “B” coil “B” flange in designated locations. [similar to the A1-A2 fitup test] Lower the C coil onto the B coil. Using three target points, perform the positioning as was done in the A1-A2 fitup test. –If a z-adjustment is required, use the average of the adjustments to derive a “compensated calculated” set of shims.

Sample assembly sequence [continued] Install the shims, install studs, bushings, supernuts, and torque to 50% of final value. Measure the tooling balls on both coils. The maximum deviation from the “realigned” points should be.007” or less. If not, loosen all studs, adjust shims locally. Re- torque all studs to 50%. Measure the tooling balls on both coils. The maximum deviation from the “realigned” points should be.007” or less. Complete tightening of flange bolts. Measure the tooling balls on both coils. The maximum deviation from the “realigned” points should be.007” or less. Scan the “B” flange of the “C” coil.