COBRA Status W. Ootani MEG Review Meeting Jul. 18th, 2007.

Slides:



Advertisements
Similar presentations
IOT Measurements & Amplifier Improvements at Diamond
Advertisements

Submitted by: Name:Rajendra Kumar Choudhury Branch:Electrical Engg.
6 th April 2010 MP3 weekly summary – issues and follow-up 0v1 M. Zerlauth for the MP3-CCC shift crew.
MP3 report – week 17 19/4/2010 – 25/04/ interventions MP3/QPS team in CCC Monday Morning Meeting : 26th of April 2010.
Daikin Altherma™ Troubling Shooting
1 I. Troubleshooting ◆ Troubleshooting of hydraulic machine FailuresReasonsCountermeasures Hydraulic driving motor can ’ t start 1)Fuse burnt 2)Electric.
CONTENTS Principles and Methods of Electric Power Conversion Semiconductor Power Switches Supplementary Components and Systems AC-to-DC Converters AC-to-AC.
Alessandro Cappelletti for CTF3 collaboration 5 th May 2010 RESULTS OF BEAM BASED RF POWER PRODUCTION IN CTF3.
ET3380 Principles and Methods of Electric Power Conversion David Morrisson MS,MBA Week 1.
TEV DUMP SWITCH FAILURES OF 2/10/09 Dan Wolff/EE Support.
CLIQ Coupling Loss Induced Quench Magnet protection system for HQ test Overview 1) CLIQ system overview 2) Adding lead to pizza box 3) remote triggering.
POWER SUPPLIES. The Power Supply A station’s power supply (sometimes known as a power supply unit or PSU) is a device or system that supplies electrical.
A. Baldini PSI 18 July 2007 MEG Overview Cobra (W. Ootani) LXe calorimeter (S. Mihara) Calibrations (G. Signorelli) Drift Chambers (J. Egger) Timing counter.
Malte HildebrandtMEG Review Meeting, 14th February 2007 Report of Run Coordinator Run 2006 Summary Malte Hildebrandt MEG Review Meeting, 14th February.
HQ02b : Test plan overview Test plan overview: Main elements and Open questions H. Bajas TE-MSC-TF H. BAJASUpdate meeting on HQ02b assembly and test plan02/05/2014.
Asservicement.
Noise studies: hardware tests and preliminary results Anna, Anton, Giovanni, Pigi, Silvia, A. Boiano, A. Vanzanella.
Status of COBRA Magnet Wataru OOTANI MEG review meeting July 11 th, 2003 PSI Switzerland.
LQS01 Test Preparation and Test Plan LARP Collaboration Meeting 12 LBNL - April 8-10, 2009.
Upgrades and Activities of 13kA EE systems during LS1 Bozhidar Panev TE-MPE-EE
1 W.Ootani ICEPP, University of Tokyo MEG experiment review meeting Feb , PSI W.Ootani ICEPP, University of Tokyo MEG experiment review meeting.
Brookhaven - fermilab - berkeley US LHC ACCELERATOR PROJECT LHC IR Quad Heaters.
Turn up the heating The electric current Heating effects of a current Voltage – Current graphs.
HFM High Field Model, EuCARD WP7 review, 20/1/2011, Philippe Fazilleau, 1/16 EuCARD-WP7-HFM Dipole Conceptual Review Nb 3 Sn dipole protection Philippe.
European Organization for Nuclear Research - Organisation européenne pour la recherche nucléaire SSD/SDD Proposal Upgrade 30/08/2012
COBRA Magnet Status W. Ootani June 27th, 2006 MEG Review W. Ootani June 27th, 2006 MEG Review.
CARDIAC meeting – 30 Sept 05 M3R3-M5R3-M5R4 FEE status.
EGA Technical World Leaders in Combustion Management Solutions Mk7 EGA.
Digital Microfluidics Control System II P Previous state - The previous control system is not self contained and uses a class AB amplifier which.
EGA Technical World Leaders in Combustion Management Solutions Mk7 EGA.
E.Gushchin (INR,Moscow) 09 March 2009 Shutdown Calo meeting CERN Status PS/SPD of LED tuning Status of tuning on A-side. Some problems Results of tuning.
Electronic. Analog Vs. Digital Analog –Continuous –Can take on any values in a given range –Very susceptible to noise Digital –Discrete –Can only take.
RF observation from Saturday morning Observation of beam induced voltage/power following the two klystron trips: 03:18 3B1 just at end ramp, 1.26E14 p.
Status of the ETL 9125FLB Photomultiplier Tubes Steve Bache UNC-Wilmington.
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
9/17/2008TWEPP 2008, R. Stringer - UC Riverside 1 CMS Tracker Services: present status and potential for upgrade Robert Stringer University of California,
Status of Muon Activities W.Baldini, N. Bondar, O.Maev, B. Schmidt LS1 Meeting Dec. 20-rd 2013.
BCWG - 16/11/20102 Content WHY do we need a HW Commissioning campaign? WHAT are we going to do? HOW are we going to do it? ElQA QPS Powering Tests Planning.
Chronology - I  Year Jan. 2008: from time to time short circuits failures in chains supplying low voltage to C-W bases (either +6V or -6V, ~5 lines.
ATF hardware status - Orbit Stabilization T.Naito(KEK) ATF2 Project meeting Laboratoire de l'Accélérateur Linéaire (LAL) 1.Orbit oscillation.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
1 COBRA Magnet Status W.Ootani MEG Experiment Review Meeting, Jul W.Ootani MEG Experiment Review Meeting, Jul
Machine Protection Review, R. Denz, 11-APR Introduction to Magnet Powering and Protection R. Denz, AT-MEL-PM.
Main dipole circuit simulations Behavior and performance analysis PSpice models Simulation results Comparison with QPS data Ongoing activities Emmanuele.
A. Baldini PSI July 05 Overview of the experiment MEG is being built (Beam line, Magnet, LXe, DC, TC, Elect., Software) Delays in some items: O(months)
August 2007 Booster RF Upgrades J.Reid Booster RF Upgrades West Gallery LCW modifications: – Headers in select locations to be upgraded by.
TOF status and LS1 plansTOF status and LS1 plans 27/06/2012.
1 W.Ootani ICEPP, University of Tokyo MEG experiment review meeting Feb , PSI W.Ootani ICEPP, University of Tokyo MEG experiment review meeting.
NLC - The Next Linear Collider Project James T Volk 10/03/2001 Report on Magnet Group Status May 7 th 2002 J Volk, C Spencer, B Parker.
Capacitor Circuits. Thunk some more … C 1 C 2 V C3C3 C1=12.0  f C2= 5.3  f C3= 4.5  d (12+5.3)pf.
Group 31 Presented by: Yanlin Zhou &Yueqi Ni ECE 445 Senior Design May 1, 2016.
Machine Protection Review, Markus Zerlauth, 12 th April Magnet powering system and beam dump requests Markus Zerlauth, AB-CO-IN.
Inner Triplet Protection Strategy LHC & HL-LHC Daniel Wollmann with Inputs from B. Auchmann, G. Ambrosio, R. Denz, P. Fessia, E. Ravaioli, F. Rodrigues.
7/8/20161 Pixel detector status and infrastructures Pixel detector status and infrastructures G. Bolla.
MICE Spectrometer Solenoids Step IV running. MICE Spectrometer Solenoids Remember: Both magnets met the full specification at the vendor and were fully.
WP10 General Meeting, Giovanni Volpini, CERN 1 December 2015 Test progress INFN 1.
Detector Safety System overview DSS is a PLC based system designed to protect ATLAS detector from damages. Front end (hardware) 2 redundant PLC ~700 input.
MICE Spectrometer Solenoids Step IV running
Jim Kerby Fermilab With many thanks to Vladimir Kashikhin, the FNAL, KEK, and Toshiba teams. SCRF BTR Split Quadrupole ILC ML & SCRF Baseline Technical.
Temperature Test Allows monitoring of temperature changes.
S. Feher MICE Magnet Readiness Review RAL, June 28th, 2016
D1 and D2 powering and protection
Potential failure scenarios that can lead to very fast orbit changes and machine protection requirements for HL-LHC operation Daniel Wollmann with input.
CHAPTER 10 Power Supplies.
Machine Protection Xu Hongliang.
Electromagnetic Relay
Status of RF at HZB: BESSY II, MLS, bERLinPro and BESSY VSR
Rebuilding the ON0EME power amplifier
Quench Detector Reaction Times
IS&LEBT Commissioning Review Safety and Radiation Protection
Presentation transcript:

COBRA Status W. Ootani MEG Review Meeting Jul. 18th, 2007

Quench Problem (slide from last meeting) We had two quenches during the beam time in last December. Dec.16th, 21:30: COBRA ON Dec.19th, 19:05: First quench (cooling water problem?) Dec.21st, 12:00: Second quench Dec.22nd, 7:00: COBRA OFF No (fake) quench for the past 8 months! External noise was observed in the quench detector signal line. Much faster than the previous one New noise source? inside the MEG system? What measures can be taken? Modify shielding and grounding scheme Different method to detect quench? SQD? A few good things to know... Nothing was damaged by the quench. Quick recovery (~2.5hrs) thanks to newly installed TMP 200msec 100mV

The shielding and grounding scheme was improved after the December run. There hasn’t been no unexpected shutdown since then. No shutdown for ~10 days with SC+NC+Bypass during shutdown period. No shutdown for ~10 days with SC + (BTS) after accelerator started to run. The problem by the external noise seems fixed. Quench Problem Status

Another Measure for External Noise Quench test to investigate a possibility to loosen the threshold for the quench detection. Current threshold: 100mV x 50ms Idea: Loosen the voltage threshold and compensate the response delay by tightening the time threshold a little. Test procedure Induce quench by firing a heater attached to the coil. Check the quench propagation in the coil (the induced voltage, temperature rise,...) Start the test at partial current and increase the current step by step. The test was success! No noise could have fired the quench detector with 500mV x 40ms. 100mV x 50ms200mV x 40ms500mV x 40ms Max. Voltage1261V1188V1237V Max. Temperature110K109K110K Original

Overheat problem of compensation coil power supply Caused by a blockage in cooling water tube(s) inside the power supply Electrical decomposition of Cu pipe. The tubes were cleaned up by using chemicals (H 2 O 2 ). Instability of compensation coil power supply New Problems... ✔

Instability of Compensation Coil Power Supply A new problem happened during CW accelerator testing. COBRA was unexpectedly shutdown after 40 hrs operation. Still under investigation, but it seems there was a problem with NC power supply according to the measured waveform. Problem of primary power line? Malfunction of control circuit? Failure of electrical parts in the main circuit? Thyristor rectifier, transistor, free-wheeling diode, filter capacitor...