1 LBT Q1 2009 Eng/SW Review SHTR: Shutters. 2 Highlights (Q1/2009) Shutters have been working well, generally Shutters have been working well, generally.

Slides:



Advertisements
Similar presentations
BMW 1985 – 325e Timing Belt and Water Pump Replacement
Advertisements

 Without reference, identify principles relating to Fixed Radiological X-RAY PM with at least 70 percent accuracy.
2013 NATEF Task Area A-4 Suspension, Steering, Alignment A. Steering System Diagnosis & Repair B. Suspension System Diagnosis & Repair C. Wheel.
MTRC Safety Alert issued on 31-May-2013 draw our highly attention for the innovative improvements. It is possible that a wire rope is able to come off.
BumperBot uses two contact switches to go through a labyrinth. Bumper.
By Graham Pryke.  Objectives:  Identify the chain & sprockets  Explain why maintenance is necessary  Discuss the four stages of maintenance.
Here is the broken line. Step 5: Break loose encasing seal. With bar in vice as show, hit with hammer to break loose. Usually 2 or 3 hits will break loose.
Clutch Fundamentals Chapter 69.
Volvo 270 Outdrive R&R (for bellows replacement)
LBT Q Eng/SW Review SHTRShutters/Seals/Mechanisms.
HTS5120 Rework Instruction for service centre Nov 18, 2010.
-From back of computer, remove screws holding right side of case -Keep track of the screws you remove! -Take off case wall by pulling back, then away from.
What is a fastener? A device to locate or hold parts.
Tool removed during cycle Fault #2 Conditions for setting Tool cocked prox switch goes open during cycle AND force on load cell drops below limit in fault.
Marubot Football League Service Manual.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
Mechanisms Paul Ventimiglia WPI Student, Team 190.
System for Engine Location of the WebTrain Adam Weintrop and Paul Wimmer Advisors Dr. Irwin and Dr. Schertz.
Step 1 Park vehicle on a level surface then engage the parking brake and turn off engine. If you cannot comfortably get under the car, raise the front.
Pat Willoughby MIT/ABB Monday, September 11, 2000 X Z Y First Attempt - 30 to 60 minutes Following Attempts - 20 minutes Possibility for Wrist Damage Possibility.
McPherson Strut Service and Diagnosis
LBT Q Eng/SW Review HBSC Hydrostatic Bearing System Sargent/Kern.
LBT Q Engineering Review DYB. 26-Oct-2007LBT Q Engineering Review Highlights (Q3/2007) Currently in Commissioning Phase Currently in Commissioning.
LBT Q Eng/SW Review ROT - Rotators. 4-Apr-2008LBT Q Eng/SW Review Highlights First BG rotator installed First BG rotator installed BG cable.
LBT Q Engineering Review MCSC Mount Control System.
LBT Q Engineering Review Primary Mirror Cells Biddick/Gusick/Kern.
Flat Saw Training. Flat Saw Sizes –Low Horsepower Blade diameters range from 8” (200mm) to 18” (450mm) Power ranges from 4 to 25 horsepower.
1 LBT Q Engineering Review PWR: Site electrical power, includes power install on levels 1, PEPSI bridge, and 4, and power monitoring.
1 LBT Q Eng/SW Review ECS: Enclosure Control System.
LBT Q Engineering Review Swing Arms (SWA) Apr-04LBT Q Engineering Review Highlights (Q4/2007) The PF SAs lost their cable trays The.
PRE s ENT TO TRANSFER CASE WORK…….. ALL TO THE GEAR BOX……. -MAINTAINANCE….. -CHANGING OIL GEAR BOX…. -CHECKING OIL GEAR BOX……
Framed Canopy Fitting Instructions Contents – 6- Angled frame fixing brackets 1 x handle pack 6 x self drilling tech screws 3 keys 1x door 6 x coach screws.
LBT Q Engineering and Software Review ENGG Engineering General.
1 LBT Q Engineering Review ICS – Instrument Cooling System.
Fischertechnik Mechanisms
1 LBT Q Eng/SW Review PVM: Preventive Maintenance.
LBT Q Eng/SW Review TERC Tertiary Mirror Units Commissioning.
1 LBT Q Eng/SW Review PLMG: Plumbing. 2 Highlights (Q2/2008) Have recently replaced worn contactors in the Primary Loop chillers Have recently replaced.
MuTr Shutdown Work Rusty Towell for And JUNE 22, 2004 at the Muon Physics and Forward Upgrades Workshop.
LBT Q Eng/SW Review SHTRShutters/Seals/Mechanisms.
LBT Q Eng/SW Review MCSC – Mount Control System.
LBT Q Engineering Review DYB. 21-Dec-2007LBT Q Engineering Review Highlights (Q4/2007) Currently in Commissioning Phase Currently in Commissioning.
LBT Q Engineering Review Instrument Cooling.
1 LBT Q Eng/SW Review ICS – Instrument Cooling System.
Shutter pushpull schematic2.ppt Present Manual Control System for Alcator C-Mod MSE Shutter (Schematic) We want to rotate the shutter into one of three.
LBT Q Engineering Review MCSC Mount Control System.
LBT Q Engineering Review MCSC Mount Control System.
LBT Q Eng/SW Review SHTRShutters/Seals/Mechanisms.
LBT Q Eng/SW Review MCSC – Mount Control System.
1 LBT Q Eng/SW Review PWR: Site electrical power.
1 LBT Q Eng/SW Review ECS: Enclosure Control System.
fischertechnik Mechanisms
IN 1900 ICT Project Final Presentation. Group name : Code Squad.
1 LBT Q Engineering Review ECS: Enclosure Control System, includes the dewpoint sensor, CA system upgrades, grounding, enclosure track performance.
LBT Q Engineering and Software Review ENGG Engineering General.
1 LBT Q Eng/SW Review PWR: Site electrical power.
LBT Q Eng/SW Review DIMM – Differential Image Motion Monitor.
LBT Q Engineering Review HBSC Hydrostatic Bearing System.
Sophisticated Design Automatic Tailgate Week Four Deliverables September 12, 2001 Ted Akiskalos June Doan Tarek Elshazly Maggie Kim David Nimitz Sharon.
1 LBT Q Eng/SW Review PLMG: Plumbing, Chiller Systems.
LBT Q Engineering Review Swing Arms (SWA). 10-Jul-2007LBT Q Engineering Review Highlights (Q2/2007) The right secondary arm is wired and the.
Work in the Tevatron A0 D0 B0 C0 E0 F0 Separators A49 Separator B48 TEL 2 installation A0 Xtal Collimator 1.5 m collimator A48 Shimming 6 magnets/day At.
1 LBT Q Eng/SW Review PSPI: PEPSI installation preparation.
DON’T GET CARRIED AWAY WORKING AROUND CONVEYOR BELTS
Robot Construction Repairing the Robot.
Clutch Fundamentals.
Most Trusted and Prominent Garage Door Company in Brooklyn
Reasons Behind Your Car Trunk Malfunctioning.
QPM delivers value over the life cycle of the product
Presentation transcript:

1 LBT Q Eng/SW Review SHTR: Shutters

2 Highlights (Q1/2009) Shutters have been working well, generally Shutters have been working well, generally Latch stations have been performing well, however, we have found that the bolts used as pivots loosen with time, added to PM schedule Latch stations have been performing well, however, we have found that the bolts used as pivots loosen with time, added to PM schedule Discovered bolts on the lower right shutter door drive sprocket were broken off and the door would not move. Lucky the door was closed when this happened. Discovered bolts on the lower right shutter door drive sprocket were broken off and the door would not move. Lucky the door was closed when this happened. All of the bolts on the other 3 couplings were also broken or just about to break. These were caught before any damage was done. All of the bolts were replaced with grade 8 bolts and torqued to 100 lb-ft. We continue to re-torque these bolts weekly. All of the bolts on the other 3 couplings were also broken or just about to break. These were caught before any damage was done. All of the bolts were replaced with grade 8 bolts and torqued to 100 lb-ft. We continue to re-torque these bolts weekly.

3 Open Issues Technical Technical Access for shutter door repair and installation of the donuts Access for shutter door repair and installation of the donuts Access for repair of the shutter door dampers Access for repair of the shutter door dampers Schedule Schedule SL1007 problems with cone and balls, ball motor gear broken SL1007 problems with cone and balls, ball motor gear broken Install new donuts Install new donuts Install new pin design and modify ECS PLC code Install new pin design and modify ECS PLC code Financial Financial Cost of spare parts. Cost of spare parts. Cost of new pins and receivers Cost of new pins and receivers Resource Resource Time to work on the shutter with the telescope in the right orientation and weather, limit access Time to work on the shutter with the telescope in the right orientation and weather, limit access

4 Planning (Q2/2009) Maintain shutters Maintain shutters Fix right shutter door upper drive Fix right shutter door upper drive Grease the shutter track Grease the shutter track Fix SL1007, pull pin and rework cone and balls Fix SL1007, pull pin and rework cone and balls  Finish repair of SL0716 Modify ECS PLC code for the new pin and socket design Modify ECS PLC code for the new pin and socket design Install new pin and socket design on one of the out board stations Install new pin and socket design on one of the out board stations Install the cable and pulleys to manually close the shutter doors, if necessary Install the cable and pulleys to manually close the shutter doors, if necessary Determine why the analog output module for commanding the shutter door motion changes output with time Determine why the analog output module for commanding the shutter door motion changes output with time