03 Dec 2002CMS Week - Bonding WGSalvatore Costa - Catania Status Report on Bonding at Catania Salvatore Costa University and INFN – Catania.

Slides:



Advertisements
Similar presentations
CMS Week, CERN, Sep Sep 2003Tracker Week - Bonding WGSalvatore Costa - Catania Working Group Business.
Advertisements

CMS Week, CERN, June Jun 2004CMS Week - Bonding WGSalvatore Costa - Catania Documentation of the loop of the to-be-pull-tested bonds placed.
CMS Tracker Week, CERN, July July 2003Tracker Week - Bonding WGSalvatore Costa - Catania Bonding-DB Usage or lack thereof.
16 Jul 2002Tracker Week - Bonding WGSalvatore Costa - Catania Status Report on Bonding at Catania Salvatore Costa University and INFN – Catania.
T1 status and plans INFN Genova November 2014 Collaboration Meeting.
1/8/04Lance Simms Thermal Testing of TOB/TEC Hybrids at UCSB.
Tracker Week – UCSB Gantry Status – July 20, 2004 – Dean White 1 Gantry Report University of California Santa Barbara UCSB Gantry Team: Andrea Allen Dave.
Uli Schäfer 1 JEM: Status and plans Pre-Production modules Status Plans.
Slide 1CMS Database Issues-Derek BargeDOE review, January 20, 2004 CMS Database Issues Derek Barge.
US Tracker Group Status Sep. 1, 2005 J. Incandela For the US CMS Tracker Group.
1 US Testing Status-Anthony AffolderModule Testing Meeting, Dec. 11, 2003 Update of US Testing Status Anthony Affolder On behalf of the US testing group.
Status of the Tracker DB System Tk week april 03 D. Contardo Developments Applications.
1 US Testing Update-Anthony AffolderTracker Meeting, Feb 10, 2004 US Module Testing Update Anthony Affolder (On behalf of the US testing group) Update.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
04 Dec 2001CMS Week - Bonding WGSalvatore Costa - Catania Writing Bonding Data into the CMS Tracker Construction Database Salvatore Costa University and.
LHCb MUON MPWC STATUS OF TOOLING, SITES, PRODUCTION AND MATERIAL PROCUREMENT.
CMS Tracker Week, CERN, July July 2003Tracker Week - Module ProductionSalvatore Costa - Catania Executive summary from Bonding WG Meeting.
CMS Tracker Week, CERN, Apr Apr 2004CMS Tracker Week - Module ProductionSalvatore Costa - Catania Module Production ___________ Report on.
1 TEC pilot run status Goal : test TEC module production rate capabilities - 15 R6 modules assembled on Brussels Gantry and bonded in Aachen I - 15 R7.
CMS Week, CERN, December Dec 2004CMS Week - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working Group Meeting Salvatore.
CMS Tracker Week, CERN, April Apr 2005CMS TrackerWeek - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working Group.
System Test Status Report R. D’Alessandro 1 TIB System Test Report Where were we ….., Mechanics (layer 3 prototype) Mother Cable & Interconnect Board System.
CMS Tracker Week, CERN, October Oct 2004CMS Tracker Week - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working.
CMS Week, CERN, September Sep 2003CMS Week - Module ProductionSalvatore Costa - Catania Executive summary from Bonding WG Meeting 16 Sep.
CMS Week, CERN, Mar Mar 2004CMS Week - Module ProductionSalvatore Costa - Catania Report on Module Bonding Salvatore Costa Università di.
Pixel Upgrade Status and Plan G.M. Bilei Firenze Mar. 6 th 2013.
22 Oct 2002Tracker Week - Bonding WGSalvatore Costa - Catania Status of Database Interface for Bonding Data Salvatore Costa University and INFN – Catania.
Tracker Week, CERN, Oct Oct 2003Tracker Week - Module ProductionSalvatore Costa - Catania Executive summary from Bonding WG Meeting 21 Oct.
Anna Macchiolo, Status of Process Qualification Centers, Sensor Meeting, 31st Oct 2001 Status of Process Qualification Centers Florence, Strasbourg, Vienna.
Construction and Installation Readiness of TOTEM Roman Pots Detectors Federico Ravotti (PH/TOT) Gennaro Ruggiero (PH/TOT) LHCC minireview – 06 May 2009.
CMS Tracker Week, CERN, Oct Oct 2005CMS Tracker Week - Bonding WGSalvatore Costa - Catania Salvatore Costa Bonding in CATANIA Università.
10 April 2003Salvatore Costa, INFN Catania1 CMS Tracker Week CERN, 10 Apr 2003 Entering Bonding Data in TrackerDB.
Guido_Tonelli / CMS_TSC / 5 February Time stability of ST sensors The problem The sensors re-measuring campaign Failure analysis Conclusions.
12/Dec/2012SBS-Meeting1 of 24 Status of the Front Tracker GEM and INFN Electronics 2012 – Dec – 12 SBS Weekly Meeting GEM Assembling SRS – INFN Electronics.
CMS Tracker MPR, CERN, 22 November Nov 2004CMS Tracker MPRSalvatore Costa - Catania Module Bonding Working Group Salvatore Costa Università di.
CMS Week, CERN, June June 2004CMS Week - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working Group Meeting Salvatore.
22 Jan 2002Tracker Week - Bonding WGSalvatore Costa - Catania Writing Bonding Data into the CMS Tracker Construction Database Salvatore Costa University.
Fermilab PMG - Results from module testing - April 9, 2004 – E.Chabalina (UIC) 1 Results from module testing E.Chabalina University of Illinois (Chicago)
CMS Tracker Week, CERN, February Feb 2005CMS TrackerWeek - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working.
CMS Week, CERN, June June 2004CMS Week - TPOSalvatore Costa - Catania Repair Centers, from a Bonder’s point of view Reported by: Salvatore.
Status report of test procedures for the readout pixel chips in Catania F.Riggi ITS Meeting, June 2002.
Sight Words.
CMS Tracker Week, CERN, Oct Oct 2005CMS Tracker Week - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working Group.
Report from Florence Bonding of Modules L12p Mirko Brianzi 20 April 2004.
Strasbourg status Ring 7 pilot run François Didierjean.
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
CMS Tracker Week, CERN, February Feb 2005CMS Tracker Week - Bonding WGSalvatore Costa - Catania Salvatore Costa Bonding in CATANIA Università.
Tracker Week, CERN, Feb Feb 2004Tracker Week - Module ProductionSalvatore Costa - Catania Report on Module Bonding Salvatore Costa Università.
D0 PMG, May 04, 2000 Slide 1 Schedule DØ SMT Status Report.
GuidoTonelli /TK_GM/CERN/07_12_05 1 TIB/TID Status Report (on behalf of the INFN consortium) STATUS OF THE INTEGRATION ACTIVITY OF THE TIB/TID_FWD TIB-MTCC.
T2 Status Report IP5 Installation Future plans. IP5 installation The mechanical structure has shown problems on installation and should be changed slightly.
Preparation for silicon sensor arrival sensor delivery schedule aggressive expect 130 L2-L5 sensors each in July and August sensor lot/batch will likely.
CMS Tracker Week, CERN, April Apr 2005CMS Tracker Week - Bonding WGSalvatore Costa - Catania Salvatore Costa Bonding in CATANIA Università.
Sumary of the LKr WG R. Fantechi 31/8/2012. SLM readout restart First goal – Test the same configuration as in 2010 (rack TS) – All old power supplies.
Electrical Tests of Modules and Ladders Markus Friedl (HEPHY Vienna) 2 October 2014.
Tracker Week, CERN, Oct Oct 2003Tracker Week - Bonding WGSalvatore Costa - Catania Which strips should the Bonders skip because of known.
Status Report on Bonding at Catania
Operating systems and Internet services
Bonding web site, renovated
Update of US Testing Status
UCSB Testing Status Anthony Affolder
Executive summary from Bonding WG Meeting 21 Oct 2003
Hamburg Bonding Report
Module Production Status in Florence
Module production in Italy
Bari production centre resp. M. de Palma
Module Testing in Florence Carlo Civinini INFN-Florence
Hybrid & Module Testing Status
Università di Catania and INFN – Sezione di Catania
Università di Catania and INFN – Sezione di Catania
Presentation transcript:

03 Dec 2002CMS Week - Bonding WGSalvatore Costa - Catania Status Report on Bonding at Catania Salvatore Costa University and INFN – Catania

03 Dec 2002CMS Week - Bonding WG2 Salvatore Costa - Catania Real Module Bonding  The first real module bonded in Catania was bonded early August 2002, just before our clean room was shut down for transfer to new Department Building.  It is a TIB module with two 512-strip old CSEM sensors.  Loop height of 150 (  m or.1 mil ?) was used (too low for current thinking).

03 Dec 2002CMS Week - Bonding WG3 Salvatore Costa - Catania Test of Real Module Bonded  Could not read module in Catania. Being the CMS-like system setup in Catania also relatively recent, we weren’t sure whether problem had been introduced by Bonding or was in Test system. Brought Module to Florence were a test setup was in operation.  Enrico Scarlini (who our technician Nunzio Giudice learns from, besides learning from Paolo Tempesta) judged all readout bonds good and correctly done (although with insufficient loop height for the current prescription), and all bias bonds also correct except for one from the bias ring to a HV capacitor pad.  The bad bias bond had to be redone and after redoing the Module was successfully read in Florence.

03 Dec 2002CMS Week - Bonding WG4 Salvatore Costa - Catania The Bad Bias Bonds

03 Dec 2002CMS Week - Bonding WG5 Salvatore Costa - Catania Explanation from our Florence colleagues…  Due to insufficient loop height, a likely flexing of the Module may have caused the bond wire to touch the p + -implanted line, which thus went to same voltage as the back of the Si, i.e. HV. This effectively shorted ground and back together.  So, as soon as powered, Module drew maximum current.  High current burnt tiny contact surface between wire and silicon and spawned oxide formation on the bond foot.  This prevented further correct biasing of the Module even though after moving the Module around, wire would no longer touch p + -implanted line.

03 Dec 2002CMS Week - Bonding WG6 Salvatore Costa - Catania Test Results before Bonding Noise (by ARC)Calibration (by ARC)

03 Dec 2002CMS Week - Bonding WG7 Salvatore Costa - Catania Test Results after Bonding (by CMS-like)

03 Dec 2002CMS Week - Bonding WG8 Salvatore Costa - Catania Cold Boxes Catania is in fact producing Cold Boxes for all INFN bonding Centers  Boxes produced and distributed: 4 (at Catania, Bari, Firenze, Pisa)  Boxes under construction: 2 (for Padova and Torino)

03 Dec 2002CMS Week - Bonding WG9 Salvatore Costa - Catania Test Systems  CMS-like is fully operational, as has been for a while already  ARC installed but  Struggled for some time to make it work until a hardware problem was found in a card  Problem repaired, ARC has been tested to the extent that this is possible without connecting it to anything internally working  Next week I will organize a real Module readout with ARC

03 Dec 2002CMS Week - Bonding WGSalvatore Costa - Catania …break…

03 Dec 2002CMS Week - Bonding WGSalvatore Costa - Catania DataBase Interface Update Salvatore Costa University and INFN – Catania

03 Dec 2002CMS Week - Bonding WG12 Salvatore Costa - Catania Interface Dev Status  Little progress since last Mtg, Oct 22, due to teaching duties  Will resume working on it from Dec 10 and still hope to deliver full, talking to TrackerDB, v. 1.0 around Christmas  A.Profeti has started inserting from Pisa Pull Test data even as v.0.2 does not yet transmit such data to TrackerDB. I’ve begun saving and regualarly backing up evry night inserted data for later shipping to TrackerDB  Played with Relay Appl to query TrackerDB from within my Perl scripts and it woks indeed  Got some suggestions on rearrangement of present variables among Tables  Still waiting for written description of some more useful variables to add

03 Dec 2002CMS Week - Bonding WG13 Salvatore Costa - Catania Center “DB Readiness” CenterDB ResponsibleForm Defaults AachenWolfgang BraunschweigMISSING BariValeria RadicciOK CataniaSalvatore CostaOK CERNAlan HonmaOK FNALBill KahlOK FirenzeSimone PaolettiOK KarlsruheHans-Jürgen SimonisOK PadovaMaurizio LoretiIN PROGRESS PisaAndrey StarodoumovIN PROGRESS Santa BarbaraBill KahlOK StrasbourgPierre JuillotOK TorinoErnesto MiglioreOK ViennaThomas BergauerOK ZurigoKlaus FreudenreichOK