Selected Size Beta Model Mechanical Seal Plug is ready for insertion into tube with nut loose and jaws retracted (relaxed). Ensure internal tube surface.

Slides:



Advertisements
Similar presentations
RP-500 ½- 1. Modification Overview Production of the RP500 began in 2007 and is current. Production of the RP500 began in 2007 and is current.
Advertisements

RP4A 2½ – 6. Modification Overview Production of the RP4A series began in Production of the RP4A series began in A Lead free version (4ALF)
Instructions for making plunger fork tool. Drawing for the trigger assembly.
© 2012 Delmar, Cengage Learning Automotive Plumbing: Tubing and Pipe Chapter 24.
Compression Fittings Internal nut type. Compression fittings Rugged and durable. Firm joint using all brass construction For use with plastic and metal.
Servicing Welch DRYFAST ULTRA Pump Models 2032
Mechanical Integrity of Tubing
Waukesha Cherry-Burrell
Metering Pump Spare Parts Replacement. Pump Components (Metering Pump) Pumps are supplied with a 120VAC or 240VAC power cord. Use care to ensure pump.
ZIPP 404 BEARING REPLACMENT GUIDE Tools Needed:
ME 330 Manufacturing Processes MECHANICAL ASSEMBLY: Joining Methods using Fasteners.
¾”-2”. Modification Overview  Production of the series began in 1989 and is current.  Early models of ¾”-2” series did not always.
MyLock 644D Service Seminar.
RPDA 4A 2½” – 6”. Modification Overview  Production of the RPDA 4A series began in  The RPDA 4A can utilize either a Type I or Type II bypass.
860 (LF), 880 ½”- 2” 860 (LF), 880 ½”- 2”. Modification Overview  Production of the ½ - 2” 860 series began in 1997 and is current.  The 880 is an “N”
860 21/2”-10”. Modification Overview  Production of the 2½” – 10 sizes began in  Lead free version (LF860) was introduced in Parts do not.
MORSE TAPER DRILLS Morse taper drills are used when a hole larger than ½” is needed Morse taper drills are used when a hole larger than ½” is needed Morse.
Marine Oily Handling Devices and Pollution Prevention Chapter 5 Lesson 1 Alfa – Laval Separator (II)
External nut type series 43
March 19, ” Leg Valve Changeout. Required Tools and Materials 3” Wrench 9/16” Wrench 11/16 Wrench Seal Pick Clean hydraulic fluid.
825, 825Y, 825YD 21/2”-10”. Modification Overview  825- ( ) Cast iron body- Threaded in seats- Internal check parts are epoxy coated iron. Old.
Tempest Blower SECTION: Tools and Equipment ISSUED: REVISED: ##-####
Getting Ready Gather tools, oil and filter. If you plan to change your oil regularly, consider investing in jack stands, a socket set and an oil drain.
994 2½ ”- 10”. Modification Overview  Production for the 994 began in 1999 and is current.
Clearing Procedures. DISASSEMBLY Major Groups Barrel Group Turn the cover latch and raise the cover group Grasp the retracting slide handle with the.
200B ½”-2”. Modification Overview  Production of the 200B (Watts 719) began in 2003 and is current.
Experts in Chem-Feed and Water Treatment Old style ORP and pH sensors. The exposed red sensor is an ORP sensor. This connecter predates the connector to.
806, 806YD 3”-10”. Modification Overview  806- ( ) Cast Iron body- Threaded in seats- Internal check parts are epoxy coated iron.  806YD- (1988-present)
LF866 2½”-10”. Product Overview  Production of the 2½” – 10” sizes began in  The LF866 utilizes a Type 2 bypass (Model LF619 single check).
Trouble Shooting How to Recognize Improper Installations January 2013 The Ford Meter Box Company, Inc. Table of Contents Valves and Corp StopsPages 1 -
Grapple Housing Top Sub Grapple Collet Seal Housing Bottom Sub Seal Housing Metal Seal Ring.
Remove the three screws holding the helbow 1. Turn the highlighted part until you can see the set screw throught the hole in the yellow part 2 Note: there.
1 InnoSys Quick Connect End Effecter Service and Maintenance Procedures Shreveport Assembly 14 MAY, 2008.
5000CIV 21/2”-10” 5000CIV 21/2”-10”. Modification Overview  Production of the 5000CIV (Watts 909RPDA) began in 1998 and is current.  The 5000CIV utilizes.
450 4”-10”. Modification Overview  Production of the 4” - 10” sizes began in  The lead free version (XL) was introduced in 2011.
Opening Nephelometer to Remove Light Trap Column 1) Remove the 3 screws that attach the neph body to the flange 2) Loosen this nut 3) Slide flange away.
Rapid Change Technology The following is a presentation to aid Technicians in the replacement of the Rapid Change Technology Block.
EnviroSCAN Flat Cap Probe Assembly, Normalisation & Installation Version 1.3 (01/03/2012)
Sentek Technologies Joining EnviroSCAN Probes. Probe Components 20-way probe cable connector (special order) Cable spacer (Part No 80015) Probe rods Probe.
STEP 1: ASSEMBLE INSERT PLATES 1.Assemble insert plates by press fitting roller bearing and adapter plate into assembly 1.1 Prep all mating surfaces to.
774X DCDA 21/2”, 6”, 8” 774X DCDA 21/2”, 6”, 8”. Modification Overview  Production began in  The 2 ½” 774X DCDA was discontinued in  The.
Internal and External Screw Threads
Removing the VTPC from the VERTEX magnets
Assembly Instructions:
826YD 21/2”-10”.
774X 21/2”, 6”, 8”.
ADVANTAGE BRIDGE/FRAC PLUG S
2000SS 2½”-12”.
30E & 30G STATOR TUBE REPLACEMENT
DCDA4AN 2½” – 6”.
Cylinder Head: Parts and Service
805Y, 805YD 21/2”-10”.
Gaskets and Packing An introduction to Gaskets Packing
¾”-2”.
½”-10”.
806, 806YD 3”-10”.
¾”-2”.
450 2½”- 3”.
774 DCDA 21/2”-12”.
LF856 2½”-10”.
2000SS 2½”-12”.
DC4A 21/2” – 6”.
774 2½”-12”.
3000SE 21/2”, 6”, 8”.
950DA 21/2”-10”.
DC4AN 2½” – 6”.
Pipe fitting Threads on pipe fittings are tapered and rely on the stress generated by forcing the tapered threads of the male half of the fitting.
Replace Timing Belt 300 Hours.
How to Change Tires on a Rim?
Presentation transcript:

Selected Size Beta Model Mechanical Seal Plug is ready for insertion into tube with nut loose and jaws retracted (relaxed). Ensure internal tube surface is cleaned and inspected for defects and irregularities that would prevent proper sealing. Powerfect Plug Installation

Upon insertion into tube the jaws are ramped along the wedge ring taper via the tightening of the nut. The body can be restrained via body flats on the body end. Powerfect Plug Installation

Once the jaws are expanded, additional tightening of the nut compresses the O-ring seals, thereby sealing the tube. Do not over-tighten.

Powerfect Plug Removal In order to remove the plug, loosen the nut until it is near the end of the thread.

Powerfect Plug Removal In order to remove the plug, loosen the nut until it is near the end of the thread.

Powerfect Plug Removal Tap the plug forward in order to relax the jaws to their at rest position

Powerfect Plug Removal Slide the plug out of the tube