Industrial Power Systems Division Confidential ‘Green’ Emissions Compliance Flexibility Schemes.

Slides:



Advertisements
Similar presentations
Fixed price contract: A contract that provides a price for each procurement item obtained under the contract.
Advertisements

Informal document No.GRB-47-4 (47th GRB, February 2008 Agenda item 3 (a) CLEPA presentations supporting justifications of informal documents GRB-47-2.
Directive 97/68/EC on the approximation of the laws of the Member States relating to measures against the emission of gaseous and particulate pollutants.
New 2014 CCC Regulation China Compulsory Certification G&M Compliance, Inc. November 25, 2014.
Small Engine Workshop Exhaust Emission Program Mobile Source Control Division November 13, 2002.
Section 18 Final Rule Overview Presentation originally given by EPA at Emergency Exemption Process Revisions Workshop, revised by Laura Quakenbush.
1 Streamlined Sales Tax Governing Board. The Marketplace Fairness Act of 2015(MFA) Grants state and local jurisdictions the right to require the collection.
Spark-Ignition Marine Engine and Boat Regulations Staff Presentation Air Resources Board July 24, Air Resources Board California Environmental Protection.
Japan Off-Road Emissions Control: Comparative Scheme 1 25 th JOINT TECHNICAL LIAISON MEETING Apr 16-17, 2015 Tokyo, Japan Japan: KOBELCO Yoichi.
The New EMC Directive 2004/108/EC and the DTI transposition Brian Jones and Peter Howick.
Fond du Lac Diesel Retrofit Project Summer How Project Came About Region 5 informed us about some extra funds ($25,000) that were available for.
Scottish Teachers’ Superannuation Scheme Reforms to STSS Sheila Armstrong Pensions Change Manager.
Korea Construction Equipment Manufacturers Association South Korean Engine Emissions 25 th JTLM 16~17 th. April, 2015.
The Energy Labelling of Household Appliances: the EU policy framework Conference-roundtable: Towards the Introduction of the EU Energy Label for Household.
ENGINEERING ECONOMICS ISE460 SESSION 16 June 23, 2015 Geza P. Bottlik Page 1 OUTLINE Questions? News? New homework – Random Variable IRR –Review –Multiple.
NEW SOURCE REVIEW REFORM/SIMPLIFICATION JOHN A. PAUL STAPPA/ALAPCO MAY, 2002.
Trailblazer Camp 2007 They All Asked For You Loan Repayment and Responsibilities.
Energy Ecodesign and Energy Labelling of Heaters.
Georgia Environmental Protection Division Stage II Gasoline Vapor Recovery Decommissioning Workshop June 11, 2014 EPD Tradeport Training Room.
1 EPA’s Proposal for Nonroad Diesel Engines & Fuel May 2003 U.S. Environmental Protection Agency Office of Transportation and Air Quality Informal document.
Valuation of Library Collections Lynne Benton Executive Director Education Services & University Librarian.
EPA Overreach WATERS OF THE U S METHANE REDUCTION PLAN LEGISLATIVE /REGULATORY FORUM SEPTEMBER 16, 2015.
CONSTRUCTING OF TOMORROW THE EUROPE Turkey engine emission status 25th JTLM - Tokyo – April 2015 Paul Williams 8/10/
Monitoring and Laboratory Division April 25, 2002 Planning and Technical Support Division Mobile Source Control Division California Air Resources Board.
Copyright 2010, The World Bank Group. All Rights Reserved. Business tendency surveys, part 1 1 Business statistics and registers.
Data Warehouse. Design DataWarehouse Key Design Considerations it is important to consider the intended purpose of the data warehouse or business intelligence.
Business Cycles and Unemployment. Business Cycle Alternating periods of economic growth and contraction, which can be measured by changes in real GDP.
Demonstration Testing l Purpose: Assurance that major monitors are able to detect a malfunction and illuminate the MIL with emissions below the malfunction.
Break-Even Analysis Break-even Analysis – performed to determine the value of a variable that makes two elements equal. In economic terms: determining.
1 Small Off-Road Engines and Large Spark-Ignition Engines with Displacement Less Than or Equal to One Liter Workshop April 21, 2008.
4-1 McGraw-Hill/Irwin Operations Strategy Copyright © 2008 The McGraw-Hill Companies, Inc. All rights reserved. Capacity Strategy Chapter 4.
Prof R T KennedyEMC & COMPLIANCE ENGINEERING 1 EET 422 EMC & COMPLIANCE ENGINEERING.
Tier 4 Engines Are Here. Now What? Originally Presented at the 32 nd Annual Conference and Annual Meeting March 2-3, 2014 Tuscany Suites and Casino Las.
Switching from NEST to PFG Retirement Plan David Berry Group Pensions Manager.
Communication Temporary framework for State aid measures European Commission DG Competition 21 January 2009.
Mobile Source Control Division September 25, 2003 Monitoring and Laboratory Division Board Hearing California Air Resources Board Control Measure to Reduce.
1 Evaporative Emission Standards for Boats Office of Transportation and Air Quality IBEX Meeting October 2011.
New Large Single Loads and Economic Development Considerations Draft Assessment.
CARB Rule Changes Mark Riechers EMD Meeting 04/28/08.
30th Space Wing Team Vandenberg - HAWKS 1 California Airborne Toxic Control Measures for Particulate Matter Emissions from Diesel-Fueled Engines John Gilliland.
ECB INFODAYS, Zagreb, Croatia, December 2006 EU Notification Scheme (New Substances) and New Chemicals Database ECB INFODAYS, Zagreb, December.
Aggregate Planning. Session Break Up Aggregate Planning Master Production Schedule.
Introduction to CE marking for construction products and how this relates to national construction regulations Dr. Adam Pinney, CPR expert Adam Pinney.
EQUIPMENT CONTRACT RUS FORM 395
The California Off-Road Diesel Rule
854 Series Sales Presentation
International Bureau of Fiscal Documentation (IBFD)
Complying with Periodic Emissions Monitoring Requirements
BAT - BREF Their scope Rob Kramers Senior advisor InfoMil.
Process Economics Factors that affect profitability
UNC Modification Proposal 0202 National Grid Distribution
Section 18 Emergency Exemption
400 Series Sales Presentation
Off-cycle Emissions GTR – Status Report for GRPE
Temperature correction supplemental test: Update
Regulation series WLTP-24-03e_Appendix 4
ACEA Comments to Commission’s note of April Editing Board
Considerations on the NRMM Technical Review
Management of product authorizations for in situ cases
IVECO Proposal for Revised CoP Procedure
Mounting Zone Edge and Profile Tolerance Change on EPA2017 Inlets
Sticker Label Location Change on UL2 Supply Module
Business Cycles and Unemployment
Replacement Engines for Rail Vehicles
Status of RMRR or learning the definition of “routine”…
UN QRTV GTR Informal Working Group 6th session – Baltimore, USA, May 2018 Regulation (EU) No 540/2014: commonalities and differences with UN R
NYS Department of Public Service
The smart choice for demanding motor switching
Presentation transcript:

Industrial Power Systems Division Confidential ‘Green’ Emissions Compliance Flexibility Schemes

Industrial Power Systems Division Confidential ‘Green’ Flexibility Options for EPA Tier III

Industrial Power Systems Division Confidential ‘Green’ Transition Program for Equipment Manufacturers (TPEM) Provides industrial OEMs flexibility in the transition to Tier III emissions Allows OEM to install non-certified engines during transition Applies only to production for US markets Program is voluntary

Industrial Power Systems Division Confidential ‘Green’ TPEM Provisions Percent-of-Production Allowance Small Volume Allowance Existing Inventory and Replacement Engines Hardship Relief Provision

Industrial Power Systems Division Confidential ‘Green’ Percent of Production Allowance Based on cumulative percentage of total machines built for US market Maximum cumulative percentage is 80% of 1 year’s volume over 7 year period within each power range. Any combination of percentages per year can be used up to the maximum of 80% OEM can utilize multiple engine specifications to cover different machines in each power range

Industrial Power Systems Division Confidential ‘Green’ e.g. for hp Range Example A 40% of machines in % of machines in % of machines in 2007 Example B 80% of machines in 2005 Percent of Production Allowance

Industrial Power Systems Division Confidential ‘Green’ Small Volume Allowance A second option that may benefit smaller OEMs OEM can exempt up to 700 engines over 7 years within each power range 200 engine limit per year Only one engine family may be used in each power range

Industrial Power Systems Division Confidential ‘Green’ Engine Family Definition Based on guidelines issued by the EPA Similar emission characteristics Bore X stroke (displacement) Configuration (T, TA, ATAAC, Electronic) Engine manufacturer determines the engine family Engine family certified with EPA

Industrial Power Systems Division Confidential ‘Green’ e.g. for HP Example OEM uses engine ‘A’ at 300 hp OEM uses engine ‘B’ at 390 hp Options OEM could only use one of the above engines Small Volume Allowance

Industrial Power Systems Division Confidential ‘Green’ Existing Inventory Prohibits stockpiling of non-certified engines for use in OEM equipment Allows OEM to use normal inventories of non- certified engines until they are depleted

Industrial Power Systems Division Confidential ‘Green’ Hardship Relief Only to be used if other programs are fully exhausted Evidence of serious economic hardship (i.e. bankruptcy!) to the OEM EPA expects provision to be rarely used

Industrial Power Systems Division Confidential ‘Green’ Proposed EU Flexibility Provisions

Industrial Power Systems Division Confidential ‘Green’ General Provisions Allows OEM to flex up to 20% of one year’s average annual volume Annual volume calculated as average annual volume of previous five years’ production If OEM has not marketed equipment in the EU for five years, then average is for the years that it has marketed equipment Flexibility period is until introduction of next Stage of emissions limits

Industrial Power Systems Division Confidential ‘Green’ Small Volume Provision Engine CategoryNumber of Engines 19-37kW kW kW kW50 As an alternative option, an OEM may place a fixed number of flex engines on the market, to the maximum number shown below

Industrial Power Systems Division Confidential ‘Green’ OEM Responsibilities Must notify the approval authorities of each Member State of their intention to use the flex scheme Must supply approval authorities with all requested information Must report to approval authorities every six months on number of flex engines placed on market (including serial numbers), and location. Must label machine to indicate use of flex engine

Industrial Power Systems Division Confidential ‘Green’ Engine Manufacturer Responsibilities Engine manufacturer must label engines as flex engines