Acquisition Alternatives An Overview of Texas John Zimmerman, Attorney Director, Acquisition Section Right of Way Division Texas Department of Transportation.

Slides:



Advertisements
Similar presentations
Handling The Eminent Domain Process Bergman Dacey Goldsmith, APLC Greg M. Bergman Brian J. Bergman Wilshire Boulevard, Suite 900 Los Angeles, California.
Advertisements

Right of Way Acquisition Process Jesse W. Smith Right of Way Manager.
1 FM 2499 From: Spinks Road To: FM 1171 PUBLIC HEARING November 16, 2004.
DESIGN BUILD NATIONAL PERSPECTIVE by Dwight Horne FHWA.
AASHTO 2005 Right of Way and Utilities Conference Austin, Texas Acquisition Alternatives and Eminent Domain.
Land Acquisition law Anisa Ahrar Director Commercial and Private Sector Laws Ministry of Justice.
Railway Grade Separations Issues. Railway Grade Separations 1.Introduction Qualifications/experience to undertake bridge planning for railway grade separations:
AASHTO/FHWA Right of Way and Utilities Subcommittee Conference Austin, Texas May 16, 2005 “Consultant Performance Oversight” Gus Cannon, SR/WA.
Missouri Department of Transportation Eminent Domain Overview Presented by – Nathan Briggs.
NEPA and Property Acquisition May 19, 2014 Elizabeth Patel Environmental Protection Specialist FTA Office of Planning and Environment.
GRANTS MANAGEMENT Edie Lowery Director of Grant Programs Metropolitan Transit Authority of Harris County, Texas August 20, 2002.
WHO’S IN CHARGE? 70,000 MILES OF PROPOSED PIPELINES IN OHIO? AN INFORMATION SESSION Pipeline Impact on Ohio Landowners Michael M. Hollingsworth, Attorney.
Real Property Disposition Dudley Whyte and Tiffany Gallegos Region IV and Region VIII May 19-21, 2014.
Central Texas Turnpike Project. Donald C. Toner Jr., SR/WA Right of Way Administrator Texas Department of Transportation Central Texas Turnpike Project.
Moving Ahead for Progress in the 21 st Century (MAP-21) – ROW Impacts Dianna Nausley, HQ RES Assistant Program Administrator Washington State Department.
ILLINOIS DOT SURPLUS / EXCESS PROPERTY OVERVIEW.
CONTROLLING ENVIRONMENTAL CONTAMIANTION REMEDIATION COSTS IN EMINENT DOMAIN ACQUISITIONS Paul M. Rickelman – September 23, 2011.
ELECTRONIC APPRAISAL SYSTEM DEVELOPMENT STUDY UPDATE Project Center for Transportation Research The University of Texas at Austin AASHTO/FHWA ROW.
STATE ROAD 100 CORRIDOR COMMUNITY REDEVELOPMENT AGENCY Bulldog Drive Improvements Right-of-Way and Design September 21, 2010 Presentation for SR 100 CRA.
Sandy Recovery Improvement Act (SRIA) of 2013 Sandy Recovery Improvement Act (SRIA) of 2013 Public Assistance Program Alternate Procedures Pilot Program.
Patty Bartlett Logan County Treasurer / Public Trustee.
2016 LEA INDIRECT COST APPLICATION AASBO Tuscaloosa, Alabama February 11, 2015.
Understanding Right of Way Process Dawn Haecker - Training & Technical Support Supervisor INDOT Trent Newport - VP, CrossRoad Engineers.
Work Plan Development Steve Robinson Highway Utility Engineer, INDOT June 11, 2015.
A Closer Look at Right of Way Appraisal Issues: Part III Appraisal of Negative Interests for Right of Way Acquisitions Conservation Easements Restrictive.
July 26, 2007 Arizona City/County Management Association Proposition 207 How Are You Handling It?
Appraisal and Acquisition: A Collaborative Partnership Speakers: Burl Wilson, MAI, SRPA Wilson Real Estate, Inc. D. Wade Brown, SR/WA, R/W-RAC, R/W-NAC.
Acquiring a “Sign Site” in Eminent Domain
1 Acquisition, Relocation and Displacement Requirements For Grant Administrators.
Federal Requirements for Right of Way. Training Objectives  Identify the constitutional basis for paying just compensation to property owners.  Define.
A SOUND INVESTMENT IN SUCCESSFUL VR OUTCOMES. Presenters: Mary Gougisha, Director of the Indirect Cost Group, Office of the Chief Financial Officer, U.S.
Right of Way Section Dee Jones State Right of Way Manager Richard Dunlap Operations Manager Joe Gray Region 5 Right of Way Manager
ELECTRONIC APPRAISAL Status of Pooled Fund, FHWA/Texas Project John Zimmerman, Director, Acquisition Section TxDOT Right of Way Division
1 of 14 Real Estate Law, 8th Ed. by Marianne M. Jennings Chapter 16 Closing the Deal.
1 Welcome to the International Right of Way Association’s Course 501 Residential Relocation Assistance 501.PPT.R
COMPLIANCE WITH GRANT IMPLEMENTATION PROCEDURES TxDot Grant Fund Project.
CEAL January 31, Existing Alternative (Preferred Align) Objectives SR-76 Corridor Expand Mobility Improve Safety Enhance natural resources Synergy.
Presented By: Derrick A. Brown, Deputy Director Right of Way Production.
1 Acquisition, Relocation and Displacement For Local Officials.
PLANNING, PRODUCTION & REAL ESTATE ACQUISITION. Acquiring Contaminated Properties In past, ODOT has acquired contaminated properties when the amount to.
GEORGIA DEPARTMENT OF TRANSPORTATION NEGOTIATION TOOLS TO SPEED UP PROJECT DELIVERY MAY, 2005.
Presented to: By: Date: Federal Aviation Administration Airports Division Eastern Region Grant Closeout Guidance 33 rd Annual Airports Conference Patricia.
Mitigation in the Section 106 Process Dave Berwick Army Program Manager Advisory Council on Historic Preservation.
HIGHWAY/UTILITY PROGRAM OVERVIEW ROADWAY CONFERENCE APRIL 20, 2009.
Understanding Right of Way Process Dawn Haecker, Training & Technical Support Supervisor, INDOT Trent Newport, VP, CrossRoad Engineers.
RIGHT OF WAY BEST PRACTICES FOR LOCAL PUBLIC AGENCIES.
STATE ROAD 100 CORRIDOR COMMUNITY REDEVELOPMENT AREA Bulldog Drive Right-of-Way Acquisition Status March 9, 2010 Presentation for City Council Workshop.
Nelson Castellanos Federal Highway Administration March 12, 2013.
Kentucky Transportation Cabinet
Certification Process Training for Local Agencies Name of LAC Name Region Local Agency Coordinator.
Tax Foreclosed Properties Housing Committee September 21, 2015.
Transportation Corridor Preservation and The Official Map Act.
Office of Affordable Housing ENVIRONMENTAL ASSESSMENT REVIEW PROCEDURES FOR THE HOME PROGRAM BY: GEORGIA DEPARTMENT OF COMMUNITY AFFAIRS OFFICE OF AFFORDABLE.
1. Land Conservation Act (LCA) * Public Agency Webinar Public Acquisition Notification Procedure – A Step by Step Guide * LCA, also known as the Williamson.
Ohio Department of Transportation John R. Kasich, Governor Jerry Wray, Director Real Estate Overview Matt Kouskouris, Division.
Coordination of Right of Way on Design-Build Contracts By- Richard Bennett State Right of Way Director Virginia DOT.
FTA Real Estate March 26, 2014 Christopher S. Van Wyk Director FTA Environmental Office.
Federal Aviation Administration 1 Georgia Airports Association 2016 Spring Workshop February 18, Federal Aviation Administration Office of Airports.
WELCOME! February 26, 2013 ODOT District 1. ion.ohio.gov 2 February 26, 2013 PURPOSE OF TONIGHT’S MEETING Provide a project overview Provide.
The Right Things to Know about Right- of-Way April 8, 2016 Tammy M. Keeley Realty Officer FHWA – AL Divisi on.
Western Area Power Administration Land Acquisition Discussion May 11, 2016.
Executive Order Environmental Stewardship and Transportation Infrastructure Project Reviews Priority Issues.
EPA P-1 The CERCLA Law and Policy of “Involuntary” and Eminent Domain Acquisitions Brownfields 2006 November 15, 2006.
IDEA Grants Application: Maintenance of Effort. 2 What is Maintenance of Effort? IDEA regulation (34 CFR § ) which directs districts, for each grant.
Hazel Avenue Widening Project Presentation To CGSA April 25, 2017
An overview of the eminent domain process
Right-of-Way the right way
Right of Way Certification
Diversity management system (DMS)
Early Mitigation Funding
Presentation transcript:

Acquisition Alternatives An Overview of Texas John Zimmerman, Attorney Director, Acquisition Section Right of Way Division Texas Department of Transportation AASHTO/FHWA Austin 2005

GENERAL OUTLINE Historically: Negotiations, and if Fail, Proceed with Eminent Domain. Innovative Ways to Obtain Earlier Possession: Possession & Use Agreements Options & Other Early Acquisition NEPA issues and early acquisition

Traditional Acquisition Track Routine negotiations Possibly attempt administrative settlement Start eminent domain proceedings after negotiations fail Possession is only obtained after completing first stage of eminent domain (award amount deposited).

Some Texas Statistics Total parcels acquired last year 2,428 Percent acquired by deed 86.1% Deed percent includes about 400 parcels where administrative settlements were used Eminent domain overall percent was 13.9% Note that eminent domain rates are much higher in urban & metro areas

Obtaining Possession Earlier Possession & Use Agreement for Transportation Purposes: Is a “paid for” right of entry Up to 100% of State’s approved value Because it is paid for, it is irrevocable Allows utility relocation & construction to take place while negotiation/ E.D. proceed. Amount paid is credited off of E.D. Award.

Even Earlier Acquisition! Advanced or Early Acquisition—originally has been only on a parcel by parcel basis Hardship or Protective Buy Acquisition before final environmental release May lose Federal reimbursement May end up with surplus property if ultimate alignment does not include the parcel

Texas Pilot of Project Wide Advanced Acquisition Texas is currently working on obtaining approval to acquire all parcels for an entire project, or a good part of a project on an advanced (early) acquisition basis. Justification is for protective purchases as subdivisions are springing up. Only land acquisition, no utility or construction activities.

Options (recent legislation in Texas) Early knowledge of right of way staff of several possible alignments being considered can also possibly allow some protective actions to be taken to preserve undeveloped land early on. Obtain an option to purchase in future (Texas law allows prior to alignment determination)

NEPA issues and early acquisition This “option” procedure appears to not be in conflict with the NEPA process, as no right of way is actually being purchased. Only an option to purchase in the future May end up with more land than is needed May end up with unused parcel May pay for, and not exercise option

CONCLUSIONS AND FOOD FOR THOUGHT: CONTINUE TO DEVELOP AND ADVOCATE PROCEDURES WHERE VOLUNTARY POSSESSION CAN BE OBTAINED THROUGH AGREEMENT WITH A LANDOWNER WHILE NEGOTIATIONS OR EMINENT DOMAIN ARE TAKING PLACE. USE INOVATIVE WAYS TO BEGIN THE ACQUISITION PROCESSES EARLIER ON IN PROJECT DEVELOPMENT.

Contact Information JOHN ZIMMERMAN, TXDOT AASHTO/FHWA Austin 2005