Designing an Earthquake Resistant Structure

Slides:



Advertisements
Similar presentations
Composer TV Project UEQ: Why should we study music history? EQ: What was the use of music historically? EQ: How does one's environment affect artistic.
Advertisements

Philanthropy, Values and Citizenship
Pasta Towers. The Challenge Teams of up to 2 will design and build the lightest pasta tower with the highest structural efficiency, capable of supporting.
Spaghetti Earthquake Structure  Working as a team, your goal is to design and construct a structure made of spaghetti, marshmallows, and tape.  This.
The Toothpick Bridge Challenge
Spring 2009 Bedroom Project Welcome to the Workshop.
Resources in Construction / Materials. Materials for Construction No construction project can proceed satisfactorily without materials. In smaller companies.
Marketing commercial restoration Phillip Rosebrook CR Business mentors ELC Training
The Design Process - An Overview
Melanie Willis, Roth Elementary Celebration! End of Year Party Math WebQuest Adapted from Alex HeilAlex Heil.
DRAWING PLANS Lesson 1 Duration -10 days Mr. Jon Felix.
Skills & Ladders (with more variations) Welcome! 1.
2005 Consumer-Directed Supports: An Introduction.
Terra Vista 4 th /5 th Grade SCIENCE FAIR. Purpose of Meeting *To discuss importance of Science Fair/Science Fair Expo *To discuss upcoming dates/deadlines.
What is the Canterbury Science fair? It is a competition for all secondary students (Yrs 9 -13) throughout Canterbury to compete against each other for.
What kind of rock grows?. This delicious candy is actually crystalized sugar and you can grow it from your own sugar-water solution. As a kid I thought.
MANUFACTURING PROTOTYPE How do all the aspects of manufacturing come together to make a final product?
Inventors and their Inventions
Geometry Webquest Home Introduction Task Student’s Page: Process
Web Quest by Kamille Ball Revised by 6 th Grade Social Studies: World Geography Teachers at Corbin Intermediate School.
Webquest.  Introduction  Roles  Task  Process  Evaluation  Conclusion  credits.
World’s Tallest Tower Case Study #1 Northern Highlands Regional High School Applied Technology Department Real World Engineering List Design/Build Engineering.
Contest Orientation. This Year’s Challenge Play a Musical Instrument Contest Day Contest Day –Carnegie Science Center –Friday, December 9, 2011.
Presented by ESC 7 Advanced Academic Services. Click on Set up new account and follow the directions. Return to this page to log in and register for.
Communities By: Kristina Brennan and Jesi Bruchey.
2011 By Kristin Rowe. Introduction Introduction | Task | | Process | Evaluation | Conclusion | Credits | Teacher PageTask | Process Evaluation Conclusion.
Fall 2015ECEn 4901 Team work and Team Building. Fall 2015 ECEn Lecture 1 review Did you find the class website? Have you met with your team? Have.
Building Challenge Your task is to design and build structure that can withstand a simulated earthquake. You will be given glue and craft sticks after.
EGG DROP WORKSHEETS Updated 3/24/10 Individual Plan Group Plan Purchase Order.
Social Bookmarking with Diigo in the Classroom Kristen Henning Spring Grove Area School District.
Summer Reading Packet Look inside to find: Information on why summer reading is important Incentives to encourage summer reading No School No Schedules.
Welcome To MOODLE Getting Started. Introductions Christa McLaughlin – High School math teacher and high school lead teacher of technology Jason Grubbs.
WebQuest: Building A Home 8 th Grade Math & Art Application Corinne McKenna.
Design Process Overview. What is Design? The word “design” is often used as a generic term that refers to anything that was made by a conscious human.
Animal Shelter Activity 2.
ROBOTICS EDC Theme: RESCUE ROBOT Stay in contact with your partner! You should be meeting weekly at a minimum! Each partner is expected to give.
TOPIC.1: What Parties Do PARTIES AND PARTY SYSTEMS.
Life as a “Muckraker” during the Progressive Era. By John Webb.
Research Web quest Chinese Cinderella. Setting the Scene You are going to be reading Chinese Cinderella this term so lets find out what you know about.
Digital Technology E-Learning Folio 2015 Evidence of Learning in Design Technology : [name and class]
My ideal learning environment A Year 7 Project. GR Nov 2007 The Task Working as a member of an architectural team you are competing against other companies.
Natural Disasters at a Glance Introduction Humanity has been dealing with natural disasters since the beginning of time. A Natural Disaster is an event.
KRISTEN HENNING SPRING GROVE AREA SCHOOL DISTRICT Social Bookmarking with Diigo in the Classroom.
WOOD TOWER DESIGNS Objective: Students will be able to construct a tower out of wood in order to investigate the physics of structures.
The Steps for a Successful Science Fair Project  Ms. McGlauflin: 5th Grade Science Teacher  5 th Grade Website: Check here.
Greetings, my fellow researchers! I hope this message finds you well. I am writing to request your help in a great undertaking. I request you research.
Preproduction: Engineering Design
Training on Safe Hospitals in Disasters Module 3: Action Planning for “Safe Hospitals”
TERRA VISTA 4 th /5 th Grade SCIENCE FAIR
WebQuest by Kristin Weathers 5 th Grade Can YOU Save the World?
Egg-O-Naut. Purpose The purpose of this project is to practice the process of Engineering Design.
Contest Orientation. This Year’s Challenge Fill a Container and Close It Contest Day Contest Day –Carnegie Science Center –Friday, December 7,
Credit Friend or Foe? webquest. Introduction "College Students who run up credit card bills each semester...graduate with as much as $7,000 of credit.
Spaghetti Bridge You’ll have to use your noodle!.
Math Curriculum Elementary Grades
Welcome to Science 10/27 Have a seat and be prepared to be introduced to your creativity week project. Today’s Schedule 1. Introduce Spaghetti EQ Structure.
EARTHQUAKE RESISTANT SKYSCRAPER
Elementary Science Fair Projects
Recording Blackboard Collaborate Sessions
Suffolk Public Schools
Food Purchasing for Child Care
Wood Structures Topic 8 Quality Workmanship
Spaghetti Earthquake Structure
Louisiana: Our History.
WebQuest: EARTHQUAKE APPRENTICE PROJECT.
Helping Haiti: Earthquake Resistant Structures
WV NxGen Standards purpose Engineering Design Products
ENDANGERED ANIMALS A RESEARCH PROJECT
Isolation Procedure Topic 2, Unit 6.
Presentation transcript:

Designing an Earthquake Resistant Structure Earthquake Webquest Designing an Earthquake Resistant Structure

Strengthening Buildings Earthquake Resistant Structure Research Directions: Use this non-linear PowerPoint to complete your research on Earthquake Resistant structures. Each of the four topics are hyperlinked to the material that you will need to study and understand!! REMEMBER….. You will be working as a team to construct a structure that can withstand a simulated 7.5 earthquake, so your independent research is critical for your team’s structure! Vibrating Buildings Strengthening Buildings Adding Dampers Earthquake Resistant Structure Research Isolating Building

Overview Click on overview to view sample projects Introduction Task Project Process Project Materials Rules for Materials Resources Special Information Champion Rubrics

Back to Overview

Introduction Earthquakes and other natural disasters can damage or destroy man-made structures. Imagine that you work for a company that specializes in building disaster-proof structures. For this project you have been asked to design a skyscraper that will be built in a city where earthquakes sometimes occur. The city planners would like to see your design along with the designs of other companies. They will select the best design for the construction of the skyscraper. Back to Overview

Task Every team will design, build, and test a model structure made out of balsa wood, cardboard, string, and pieces of material of your choice (must be teacher approved). Your model will be tested on a specially built earthquake machine. This machine simulates the stresses that occur during earthquakes. Your model should be able to withstand a 10 second earthquake without collapsing. You will be competing against other companies by attempting to build the best structure. You will give a brief presentation prior to the final test. In this report you will discuss your internet research and how it helped you design your structure. Each team is required to keep a monetary log, for your team’s budget proposal is factored into the selection process Back to Overview

Project Process Your team will need to fulfill each of the following roles: Architect -- Treasurer Technology Director -- Project Manager Special Note: taking on any of the roles above does not mean that you do all of the work. It means that you are in charge of that responsibility. Other members of the team can help you with your responsibilities and do part of the work. Back to Overview

Back to Project Process Architect Using “Google: Sketch-up” to create an architectural drawing of your structure. (BONUS PTS. ARE EARNED FOR ANY TEAM THAT CHOOSES TO USE THIS PROGRAM) Design carefully! Your structure must withstand a 7.5 magnitude earthquake. Your actual structure must closely match your drawing. Only minor changes will be allowed. Use your Internet research in your design. Use must cite “3” sources Back to Project Process

Back to Project Process Treasurer Purchase materials needed for your structure. You may purchase the materials from the Construction Supply Company (teacher). You must complete a purchase order and record all of your expenditures ….this is all part of the final contract You will have to type up a final expenditures report for contract/lab report….forms will handout out Back to Project Process

Back to Project Process Technology Director Search the Internet for information that could assist you in your project. You may use the websites listed in the Resources section of this webquest or you can conduct your own search. You should try to find websites that provide information on building structures that are able to withstand earthquakes or other natural disasters. Search for ideas that will help engineer and design your structure. Special Note: You must provide the name(s) or URL’s of the websites that you visited in your final presentation (2 to 3 minutes). During your presentation you must explain how the information provided helped you throughout your project and to design your structure. You should explain why you think your design will out perform all the other competitors!!!!!! Back to Project Process

Back to Project Process Project Manager All team members will participate in the construction process. You are responsible for storage of your structure and materials. Be careful not to waste or unnecessarily damage your materials. Clean up your area when finished. Back to Project Process

Project Materials Insurance Restrictions Product Cost (per item) Item Number Balsa Wood (measure in cm) $10.00 per cm SPA-1234 String $50.00 per cm MAR-5678 Item of Your choice $100.00 per item -------- Cardboard $100.00 per square cm SST-1972 Special Note: The materials you will be using are delicate and can be easily damaged during construction or while being stored. You may purchase an insurance policy to protect you from this loss. This policy will allow you to purchase an additional $1,500.00 of materials buy you have to abide by the restrictions. The cost of the policy is $500.00. This initial cost will be taken out of your budget. You may purchase a policy from the Insurance Agent (teacher). Insurance Restrictions Back to Overview

Insurance Restrictions Insurance must be purchased prior to beginning of the construction of your structure. Insurance purchases will not be allowed after construction begins. You may use the policy only in the event of a catastrophic loss (major damage). You may not use the policy for minor breaks or loss of material. The Insurance Agent will make the determination regarding the severity of the damage. Decisions made by the Agent are final! Back to Project Materials

Rules for Use of Materials How you decide to construct your building is very critical You must use only the materials your team purchases in class. You may bring in one item to add to structure; however, it must be approved the teacher. Your structure must be able to be strapped to the “Earthquake Board” Your structure must be 45 cm tall….15 cm per floor. All floors must be 22 cm x 22 cm tall!!! No pyramids!!!! -Load requirements…. Every floor of your model must be able to carry 10 grams for each square centimeter of its area. -Your model must be able to carry the required load on all floors at the same time. -On the day of the challenge, you can use the weights provided to check that your model can carry the vertical load. To purchase materials, your treasurer must complete the purchase order form. The treasurer is responsible for keeping track of how much money is spent. Purchase order forms will be provided by the teacher Back to Overview

Resources Below you will find a few websites that you may wish to visit. These sites may provide information that is useful to you in your structure design. You may also wish to conduct your own Internet search. If you use the information in a website be sure to include it in your final report by giving the name, URL (address). Also write a short description of what you learned in the website and how you used it in your project. - My Big Campus: I have provided many helpful videos Building Safer Structures Quake: Hazards and Preparedness Building Earthquake Safe Structures The Right Technology for Retrofit and Construction Exploratorium: Life Along the Faultline: Building for the Big One Back to Overview

Special Information Individuals may lose points on their score for the following: Horseplay (-3) Not staying in area with team/running around (-3) Too loud (-3) Not participating appropriately (-5) Disturbing other groups (-5) After 2 incidents an individual will be removed from the activity and given a zero (0) on the project. The Building Inspector (teacher) will conduct final testing. Each structure will be measured and inspected for project requirement violations. Violations will disqualify a structure from competition. The Building Inspector’s decisions are final. Back to Overview

Champion The winning structure from each block will be determined by the top overall score in the class. Score sheet will be provided Back to Overview

Rubrics Your final grade for the project will be recorded on the Earthquake Team Score sheet. (Attached to the back of this packet) Be sure to look at both the rubric and the team score sheet carefully. (Attached to the back of this packet) This will help you to understand the scoring process. Back to Overview