Frankfurt (Germany), 6-9 June 2011 The Test and Installation of Medium Class(22.9kV) Hybrid type Fault Current Limiter in KEPCO Grid Wonjoon Choe Jungwook.

Slides:



Advertisements
Similar presentations
1.R&D for HTS cable and FCL 2.Grid application Program - Outline Hyun, Ok-Bae IEA THS ExCo Meeting/18 May 2009, Tampere.
Advertisements

Low and Medium Voltage Test Facilities in Varennes' Scientific Park Workshop: DER Laboratories of Excellence, Testing, and Standards Napa, December 4th.
Gdpack 40.5kV Technical Data Sheet MV-LV Prefabricated Substation
ADVANCED MANAGEMENT OF A CLOSED RING OPERATED MV NETWORK: ENEL DISTRIBUZIONE’S P4 PROJECT. Simone Botton, Roberto Calone, Luigi D’Orazio, Alessandro Fatica,
 UK Power Networks. All rights reserved Distribution Network Visibility Low Carbon Networks Fund Tier 1 project UK Power Networks & PPA Energy Omer.
Managing Director, HVPD Ltd
The Challenges of Converting Arrester Standards to Understandable Utility Standards Michael K. Champagne, P.E. Member, IEEE-SPDC.
Copyright © 2011 Rockwell Automation, Inc. All rights reserved. Insert Photo Here OneGear™ 7.2kV Motor Control Center.
Brief on HVDC 2015 Brief on HVDC 2015
AES Buffalo Gap Wind Farm Buffalo Gap MW 155 – GE 1.5 sle Presented August 22, 2008 By Robert Sims AES Wind Generation.
ABB - 1- ABB ABB Load Interrupter Switchgear. ABB - 2 ABB Contents Introduction to Load Interrupter Switchgear What, Where, Why ABB Technical Offering.
TRANSFORMERS. TRANSFORMER PARAMETERS Turns Ratio (n) It is defined as the ratio of the number of turns in the secondary winding (N sec ) to the number.
Problem #2-8 A 480 – 120 V, 60 Hz transformer has its high voltage winding connected to a 460 V system, and its low voltage winding connected to a 24/32.8°Ω.
Unit Transformer Unit transformer are step up transformer which is connected to generating house & step up voltage from 15kV voltage to 132 voltage level.
Chapter 8 Inverters AC Power • Inverters • Power Conditioning Units • Inverter Features and Specifications.
1111Challenges for reliable offshore transformersTRANSFORMING YOUR NEEDS INTO SOLUTIONS Challenges for Reliable Offshore Transformers Dr. Jan.
ESS | Power System | | Frithiof Jensen ESS Power System Ion Source, Front-end.
Chapter 2 Transformers.
2. Terms and definitions1 # Terms and Definitions # Voltage Sags and Interruptions.
Book Reference : Pages To understand how electricity is distributed in the UK via the National Grid 2.To understand how transformers are used.
2005/08/03 dc Superconducting Power Transmission Line in Chubu University Presented by S. Yamaguchi
Frankfurt (Germany), 6-9 June 2011 Achim Hobl – Germany – RIF Session 1 – 0352 – p 1 Nexans' Superconducting Fault Current Limiters for medium voltage.
Frankfurt (Germany), 6-9 June 2011 Luciano Martini – IT – RIF S1 – Paper 1162 The ECCOFLOW EU FP7 Project: Design and Simulations Results of a Superconducting.
Electric Industry Restructuring New Imperatives in a Competitive Environment Increase Efficiency Improve power reliability and quality Enhance Market Access.
Levels of high voltage: World over the levels are classified as: LOW MEDIUM HIGH EXTRA and ULTRA HIGH Voltages However, the exact magnitude of these levels.
Frankfurt (Germany), 6-9 June 2011 Hans-Erik Olovsson – Sweden – Session 1 Network Components – Paper 0453 Innovative Compact 145/12 kV Indoor Air Insulated.
All rights reserved Gas-insulated Switchgear (GIS)
Frankfurt (Germany), 6-9 June 2011 Luciano Martini – IT – RIF S1 – Paper 0339 Development and Testing of Innovative Fault Current Limiters for Distribution.
Electric network faults seen by a wind farm – analysis of measurement data Sanna Uski, Seppo Hänninen, Bettina Lemström.
Superconducting Fault Current Limiters
Frankfurt (Germany), 6-9 June 2011 Analysis of Protection Malfunctioning in Meshed Distribution Grids Evita PARABIRSING Dr. Edward COSTER Dr. Marjan POPOV.
AES Buffalo Gap Wind Farm Buffalo Gap MW 155 – GE 1.5 sle Presented August 22, 2008 By Robert Sims AES Wind Generation.
Bock_DE_Session1_Block1_Question3 Barcelona May 2003 Nexans SuperConductors Dr. Joachim Bock Nexans SuperConductors D Huerth
Frankfurt (Germany), 6-9 June 2011 Louise Jakobsen, Danish Energy Association – Denmark – Session 3 – Paper 0811 Louise Jakobsen, Danish Energy Association.
1 Progress of, and prospects for, commercial applications of UHV 1100kV Transmission System in TEPCO 2 nd International Symposium on International Standards.
Power Plant Construction and QA/QC Section 4.4 – In-Plant Electrical Distribution Engineering Technology Division.
What is POWERGRID??? The Power Grid Corporation of India Limited (POWERGRID), is an Indian state-owned electric utilities company headquartered in Gurgaon,
First Draft Language (B) Service Equipment. In addition to the requirements in (A), service equipment shall contain the following information: (1)
Submitted to: Submitted by:
Electrical Engineering
CONTENS 1. Production Capacity 2. Production Range
1 Pacini IT Barcelona May 2003 Improvement in the Distribution Assets Management by the Exploitation of the Innovative Component Technology.
S. MELQUIOND France Session 1 – Block 1 – Question 1- 5 Barcelona May Question 1-5 Is the transformer protection by mean of protection switch.
Disconnector Switches and Earth Switches
Frankfurt (Germany), 6-9 June 2011 Minimum short circuit power in the LV distribution network to meet EN standard requirements David MEZERA
Frankfurt (Germany), 6-9 June 2011 Romanens – CH – S3 – 0220 Impact of Distributed Generation on Grid Protection BKW FMB Energie AG Switzerland Florian.
Uninterruptible Power Supply Improves Reliability at The Australian Synchrotron Sean Murphy – ARW 2013 Melbourne.
1 Transmission of Electrical Energy Electrical energy is carries by conductors such as overhead transmission lines and underground cables. The conductors.
EE 207: Fundamentals of Electrical Power Systems
EE 2353 HIGH VOLTAGE ENGINEERING
STUDY OF ELEMENTS OF A 220/132/33KV SUBSTATION
ET 332b Ac Motors, Generators and Power Systems 1 Lesson 11_et332b.pptx.
Comparison of AIS and GIS Grid Station Muhammad Ali Ashraf Management Associate (Electrical) CPP Project.
POWER DISTRIBUTION & POWER LOSS REDUCTION METHODS
Sub Station.
SUB-STATIONS.
Electricity is produced at the power station.
SIGENTICS HV Series S-modyn
MEDIUM VOLTAGE APPLICATIONS.
Chapter # 25 Sub-Stations risemark.pbworks.com.
المحولات Transformers
Design of Electric Power Systems and Utilities
Distributed Generation (DG) Modeling Criteria
Lesson 11: Transformer Name Plate Data and Connections
Transformer Factory (Cast Resin)
LIGHTNING AND INSULATIONS COORDINATION
Ahmed Kulab Moh. Abed Foaad Al-Habeel
Biosco: MV/LV prefabricated substations IEC Presentation of the standard Safety is a choice.
Substation Equipment's
Presentation transcript:

Frankfurt (Germany), 6-9 June 2011 The Test and Installation of Medium Class(22.9kV) Hybrid type Fault Current Limiter in KEPCO Grid Wonjoon Choe Jungwook Sim Gyeong-ho Lee Seung-hyun Bang Kwon-Bae Park Young-keun Kim Ok-Bae Hyun LS Industrial Systems. Korea KEPCO/KEPRI. Korea

Frankfurt (Germany), 6-9 June 2011 SEOUL ICHEON HTS hybrid FCL Cooling System for HTS Cable Control and Monitoring System Intermediate connection of HTS Cable Offset Termination of HTS Cable 170kV GIS Main Transformer 25.8kV GIS Application Site : ICHEON 154kV Substation, KEPCO Installation Location: D/L of M.Tr(154kV/22.9kV) secondary Real Grid Project of FCL and SC Cable

Frankfurt (Germany), 6-9 June 2011 Configurations of FCL & SC Cable

Frankfurt (Germany), 6-9 June 2011 Circuit of Hybrid-type FCL HTS Switch Mech. Reactor VI Actuator HTS Backup Switch

Frankfurt (Germany), 6-9 June 2011 Configurations Cryocooling System Switch Current Limiting Reactor Cryocooling Monitoring & Control System

Frankfurt (Germany), 6-9 June 2011 Specification ParameterSpecification Rated Voltage (rms) 25.8 kV Rated Current (rms) 630 A Rated Power Frequency 60 Hz Rated Power Frequency withstand voltage (rms) 70 kV Rated Impulse withstand voltage 150 kV. BIL Rated short circuit current (rms) 12.5 kA/1.0 sec Insulation type Air Minimum Limiting Current (rms) 1.4 kA Current Limiting Reactor 0.4 [Ω] Recovery time < 0.5 sec Critical Current of HTS > 2,000 A Cooling Power 220W at 80K Operation temperature 75~77K

Frankfurt (Germany), 6-9 June 2011 HTS wire(CC) Winding Stacking Critical Current Assembly Fabrication of HTS trigger module

Frankfurt (Germany), 6-9 June 2011 Test of FCL Test voltage(rms): 22.9/13.2kV Test current(rms): 12.5kA Fault duration time: -3 phase: 1.0 sec

Frankfurt (Germany), 6-9 June 2011 Type1 Type2 Non-limited region Limiting types of fault current limiters

Frankfurt (Germany), 6-9 June 2011 Protective Coordination in DL OCR2OCR kV 22.9kV 154/22.9kV M.Tr FCL

Frankfurt (Germany), 6-9 June 2011 Future Plan Commercial operation of 25.8kV/630A HTS hybrid FCL ~ (Planned) Development of Fault Current Limiter for Biz. Model ~ (Planned) 1.Biz. Model 1: 25.8kV/600A FCL - Application site: KEPCO DL (Underground grid) 2.Biz. Model 2: 22kV/5,000A FCL - Application site : POSCO (Steel plant in Korea)