Wang Yi, Tsinghua University SoLID collaboration meeting, 2014.11.7-7 Status of MRPC-TOF 1 Wang Yi Department of Engineering Physics Tsinghua University,

Slides:



Advertisements
Similar presentations
1 Beam Test Results of USTC LMRPC modules (50cm) Yongjie Sun presnted by Hongfang Chen.
Advertisements

1 MRPC detector as polarimeter for dEDM Characteristic of detector Time Resolution Electronics Possible R&D Plans D. Babusci, A. Ferrari, P. Levi Sandri,
Status of MRPC-TOF Wang Yi Department of Engineering Physics Tsinghua University, Beijing, China 1.
ARNAB BANERJEE Variable Energy Cyclotron Centre, India.
Plan for MRPC Production Yongjie Sun Center of Particle Science and Technology University of Science and Technology of China.
DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 1 Report on FEE for PID o Reminder o TOF o EMCAL o Summary Jean-Sebastien Graulich, Geneva.
Preparation of MTD production Yongjie Sun Center of Particle Physics and Technology University of Science and Technology of China.
New MRPC prototypes developed in Tsinghua Unversity Huangshan Chen (Tsinghua Unversity)
Mauro Raggi Status report on the new charged hodoscope for P326 Mauro Raggi for the HODO working group Perugia – Firenze 07/09/2005.
Naba K Mondal, TIFR, Mumbai ICAL ( conceptual) INO Peak at Bodi West Hills Prototype ICAL at VECC 2mX2m RPC Test Stand at TIFR ASIC for RPC designed at.
Wang Yi, Tsinghua University Joint meeting of HALL A and HALL C, SoLID status and Chinese contribution 1 Wang Yi Department of Engineering.
15 th CBM collaboration meeting, GSI, Darmstadt, Germany, April 12-16, 2010Wang Yi, Tsinghua University R&D status of low resistive glass and high rate.
20/10/2008A. Alici - ALICE TOF Festival1 Electronics and data acquisition of the ALICE TOF detector A.Alici University and INFN, Bologna.
CBM-Meeting, Darmstadt A.Schüttauf for the FOPI- collaboration FOPIs new MMRPC-barrel.
PADI status Mircea Ciobanu 11 th CBM Collaboration Meeting February 26-29, 2007, GSI FEE1 PADI.
GEM/MRPC/Chinese Collaboration Haiyan Gao Duke University March 25, 2011.
V. Ammosov 13th CBM meeting,GSI,March 10 1 Beam test of pad tRPCs with ultra-thin glass Status of IHEP+INR activity for high rate RPCs.
Применение MAPD (Zecotek) в адронных калориметрах и многоканальных времяпролетных системах в экспериментах по релятивистской ядерной физике Ф.Ф.Губер,
RPC R&D status in Bucharest (JRA12-I3HP) Mihai Petrovici - CBM-Meeting, GSI, March 1,2006 Short history SMSMGRPC – Glaverbel Glass Prototype –Construction.
Third workshop on hadron physics in ChinaWang Yi, Tsinghua University A conceptional design of SOLID-TOF Outline: Development of low resistive glass and.
The Readout Electronics for Upgrading of BESIII End-capTOF Chunyan Yin University of Science and Technology of China University of Science and Technology.
Prototypes of high rate MRPC for CBM TOF Jingbo Wang Department of Engineering Physics, Tsinghua University, Beijing, China RPC-2010-Darmstadt, Germany.
TOP counter overview and issues K. Inami (Nagoya university) 2008/7/3-4 2 nd open meeting for proto-collaboration - Overview - Design - Performance - Prototype.
CMS-GRPC status Imad Laktineh for the GRPC-CMS groups.
STAR regional meeting, October UniversityWang Yi, Tsinghua University New MRPC R&D in Tsinghua University Outline: Introduction of MRPC.
Mariana Petris, CBM Collaboration Meeting, October 13-18, 2008, Dubna Mariana Petris, NIPNE - Bucharest C B M In-Beam Test Results of the Pestov Glass.
Proposal for large-area high- rate Time-of-Flight and Muon Telescope Detector with MRPC technology for EIC Zhangbu Xu (BNL) BNL, Rice, UCLA, Tsinghua,
Report on beam test results of high-rate MRPCs Jingbo Wang Department of Engineering Physics, Tsinghua University, Beijing, China.
18/03/2010 DPG Bonn – March Session: HK 48 A demonstrator for the CBM Time of Flight wall electronic readout chain Pierre-Alain Loizeau PI – Uni.
RPC upgrade for the HADES Tracking: MDC e -,e + identification with RICH- TOF/PreShower  0.4 GeV/c TOF is not sufficient- Pre-Shower p,  identification.
长读出条 MRPC 性能研究 孙勇杰 Key Laboratory of Technology of Particle Detection and Electronics, USTC-IHEP, CAS Center of Particle Physics and Technology, USTC.
MRPC Beam GSI Yongjie Sun University of Science and Technology of China.
R&D for single gap -Use the HARDROC ASICs, SiGe technology (well tested and available) HARDROC : 64-channel, 2-bin readout (3 comparators, 3 thresholds),
CBM Collaboration Meeting, GSI Experimental features of strip-RPCs Motivation FOPIs Multistrip-Multigap-RPCs Results Conclusions.
Progress on the beam tracking instrumentation Position measurement device Tests performed and their resolution Decision on electronics Summary.
STAR-MTD March 30 th -April 1 th, 2011 Wang Yi, Tsinghua University 1 Final design and plan for LMRPC production Outline: LMRPC structure.
ITEP participation to the CBM TOF project ITEP ALICE - TOF group CBM – Russia meeting at ITEP, Nov 5 th, 2004.
24/03/99Report to LHCC Referees Muon Group Status Report Outline: Muon Filter - New Geometry - Support System Optimisation Studies - Pad, Strip and Pad/Strip.
The Preliminary Test and Plans of GEM Detector in Tsinghua Rensheng Wang ( 王仁生 ) Tsinghua U. ( 清华大学 ) The Third Workshop on Haron Physics in China and.
XIII workshop on RPC and related detectors. GENT university, Belgium, Feb Wang Yi, Tsinghua University 1 Development and test of real-size.
CBM-TOF-FEE Jochen Frühauf, GSI Picosecond-TDC-Meeting.
SDHCAL. outline  SDHCAL concept, validation and construction  Test Beam and technological prototype performance  Perspectives and Conclusion  SDHCAL.
Ingo DeppnerDPG-Frühjahrstagung, Darmstadt, März Outline: CBM-ToF requirements What is an (M)RPC? Tof wall arrangements Ceramics RPC and.
Workshop on STAR upgrade. Sep th, 2015, USTC, Hefei Wang Yi, Tsinghua University 1 Status of high rate MRPC for CBM-TOF Outline: Introduction of.
7 th Workshop on Hadron Kunshan Univ Wang Yi, Tsinghua University 1 Conceptual design of SoLID-TOF and aging test Outline: Conceptual design.
Ingo DeppnerSTAR Regional Meeting at USTC Hefei Ingo Deppner Physikalisches Institut der Uni. Heidelberg CBM TOF prototypes STAR Regional.
Status of the Front-end-Electronics based on NINO ASIC for the Time-of-Flight measurements in the MPD V. A. Babkin, M.G. Buryakov, V. M. Golovatyuk, S.
NSS2006Shengli Huang1 The Time of Flight Detector Upgrade at PHENIX Shengli Huang PHENIX Collaboration Outlines: 1.Physics motivations 2.Multi-gap Resistive.
XI Workshop on Resistive Plate Chambers and Related Detectors, INFN, 5-10 February, Aging test of high rate MRPC Wang Yi Department of Engineering.
2013 核电子学 ASIC 技术研讨会, 2013/10/14 基于电流模的 MRPC 探测器读出 ASIC 研究 报告人:周新 指导老师:邓智.
Trigger & Tracking detector for CMS
1 The Scintillation Tile Hodoscope (SciTil) ● Motivation ● Event timing/ event building/ software trigger ● Conversion detection ● Charged particle TOF.
Construction of RHIC-STAR TOF and high rating MRPC Wang Yi Department of Engineering Physics, Tsinghua University Beijing,100084, China.
High rate time of flight system
eTOF MRPC Production Status at Tsinghua University
Performance studies of a single HV stack MRPC prototype for CBM
Department of Engineering Physics, Tsinghua University, Beijing, China
RPC with strip readout Last results from test of timing glass
Results achieved so far to improve the RPC rate capability
Performance of timing-RPC prototypes with relativistic heavy ions
Multigap Resistive Plate Chambers (MRPC)
A Low Power Readout ASIC for Time Projection Chambers in 65nm CMOS
Conceptual design of TOF and beam test results
Performance of a Multigap RPC prototype for the LHCb Muon System
Update on SoLID-TOF Wang Yi Outline: Conceptual design of SoLID-TOF
High time resolution TOF for SoLID
Alexandre Camsonne January 13th 2015
High time resolution TOF for SoLID
TOF read-out for high resolution timing
Aging test of glass and MRPC
Presentation transcript:

Wang Yi, Tsinghua University SoLID collaboration meeting, Status of MRPC-TOF 1 Wang Yi Department of Engineering Physics Tsinghua University, Beijing, China 1

Wang Yi, Tsinghua University SoLID collaboration meeting, Outline Requirement of TOF Conceptual design – Prototype design – Cosmic test – Beam test Progress on electronics – ASIC FEE – FPGA TDC Production workshop Conclusions MRPC-TOF 2

Wang Yi, Tsinghua University SoLID collaboration meeting, Backgrounds ( γ,e, e + and n) The rate in TOF area <100kHz/cm 2 Simulated by Zhihong Ye 3

Wang Yi, Tsinghua University SoLID collaboration meeting, Main requirements for TOF The MRPC is developed for the TOF of SoLID Main Requirements for TOF: –  /k separation up to 2.5GeV/c – Time resolution < 80ps – Rate capability > 10kHz/cm² 4 It can be seen from left panel that 180ps resolution is enough for the  /k separation. So 80ps is sufficient!

Wang Yi, Tsinghua University SoLID collaboration meeting, Conceptual design of SOLID-TOF MRPC TOF wall we designed contain 150 MRPC modules in total, with 50 gas boxes and 3 counters in each box, covering the area of 10m². MRPC1 MRPC2 MRPC3 100cm 16cm 28cm The MRPC module we tested is the prototype of smallest one. Total channel ~3600 5

Wang Yi, Tsinghua University SoLID collaboration meeting, Tsinghua’s activity in high rate TOF 32cm x 30cm Performance of low resistive glass 6

Wang Yi, Tsinghua University SoLID collaboration meeting, Tsinghua’s activity in high rate TOF Performance of high rate MRPC Layout of CBM-TOF wall Super module Prototype of high rate MRPC 7

Wang Yi, Tsinghua University SoLID collaboration meeting, Volume resistivity: ~10 10 .cm 363m m 219mm 171m m 25mm Length/mmWidth/mmThickness/mm Gas gap--0.25×10 Inner glass Outer glass Mylar Inner PCB Outer PCB Honeycomb Material dimensions A MRPC prototype for SoLID-TOF 8

Wang Yi, Tsinghua University SoLID collaboration meeting, Cosmic test Cosmic ray August, 2011 Efficiency > 96kV/cm (6.0kV) Time resolution: ~ 52ps PMT3PMT4PMT0PMT2PMT1 MRPC Cosmic Ray Muon 9

Wang Yi, Tsinghua University SoLID collaboration meeting, Beam Hall A 10 Shield High Energy e- Top View PMT 1 PMT 2 PMT 3 PMT 4 PMT 0 Target Test setup The diagram of DAQ system

Wang Yi, Tsinghua University SoLID collaboration meeting, Results : Calibration 11 Example: r175 Operated on May 13 th High Voltage: ±6800V Condition: 10m from target, shielded PMT before calibrationMRPC before calibration Calibration method Charge Cut : 2 σ Position Cut : 2 σ

Wang Yi, Tsinghua University SoLID collaboration meeting, Calibration of PMTCalibration of MRPC Results: Calibration Example: r175 Operated on May 13 th High Voltage: ±6800V Condition: 10m from target, shielded Time resolution: 76ps σ -PMT = 2.937(102.8ps) σ -MRPC = 3.646(127.6ps) σ -MRPC = 2.16(75.6ps) In this test, T 0 is about 100ps, the time resolution is deteriorated.

Wang Yi, Tsinghua University SoLID collaboration meeting, Results : HV Scan 13 Time Resolution: ~75ps Efficiency: >95%

Wang Yi, Tsinghua University SoLID collaboration meeting, Results: Rate Scan Voltage: 6800V Flux:11kHz/cm² Efficiency:~95% Time Resolution: 78ps Flux:16kHz/cm² Efficiency:~95% Time Resolution: 82ps

Wang Yi, Tsinghua University SoLID collaboration meeting, Results: Flux vs. Time 15 Run188, 6800V (5m to target, shielded) Run193, 6800V (5m to target, not shielded) 2.5kHz/cm² 6kHz/cm² 12kHz/cm² 14-15kHz/cm² 16-18kHz/cm² During a run, flux is not on a stable level, which from less than 3kHz/cm² to 16kHz/cm². We can observe the performance by selecting data from different flux.

Wang Yi, Tsinghua University SoLID collaboration meeting, Charge spectrum at different rate Results: Charge Distribution Base Line Signal 16 Significant reduction of charge distribution can be seen as the background rate increases. The reduction of electrical field is caused mainly by both background irradiation and electron beams. Rate capability of the counter is higher than 16kHz/cm².

Wang Yi, Tsinghua University SoLID collaboration meeting, TOF electronics Fast preamplifier : Maxim3760 (RICE Univ.) Ninos (TOT) (ALICE) Padi (TOT) (GSI) CAD (TOT)(Tsinghua) QDC (CAEN, 25fC/bin) TDC HPTDC (ALICE, 25ps/ch) GET4 (GSI, 25ps/ch) FPGA TDC (GSI and other) DAQ

Wang Yi, Tsinghua University SoLID collaboration meeting, CAD: Tsinghua amplifier Supply Voltage3.3 V Technology0.35μm CMOS Chip PackageBGA package Preamplifier Current Gain2 Preamplifier Bandwidth>100 MHz Power Consumption<10 mW/ch inputSingle-end input outputSingle-end CMOS logical output Specifications

Wang Yi, Tsinghua University SoLID collaboration meeting, Test with signal generator and MRPC

Wang Yi, Tsinghua University SoLID collaboration meeting, Tsinghua-FPGA TDC Cyclone-II FPGA EP2C35F484 C6 100M Ethernet Readout with TCP/IP support Socket for TCXO (opt.) 24 channels, Ethernet readout Resolution ~30ps 20

Wang Yi, Tsinghua University SoLID collaboration meeting, RPC workshop:

Wang Yi, Tsinghua University SoLID collaboration meeting, MRPC mass production

Wang Yi, Tsinghua University SoLID collaboration meeting, Summary 23 High rate MRPC will be used to construct TOF for SoLID. A prototype of high rate MRPC was developed. The test results show that the time resolution can reach 70-80ps and the flux is up to 16kHz/cm². During beam test, the MRPC module was placed at high radiation region for 2 months and no significant performance deterioration was observed. This means that the module can withstand long time irradiation. Research on ASIC FEE and FPGA TDC goes smoothly.

Wang Yi, Tsinghua University SoLID collaboration meeting,