10-11-12-13 September 2002-MoroccoARAB INSTRUMENT PROCEDURE DESIGN SEMINAR 1 STAND-ALONE APPROACH OPERATIONS FOR CLASS A GPS.

Slides:



Advertisements
Similar presentations
B-RNAV OPERATIONS IN EUROPEAN AIRSPACE
Advertisements

Flight Validation Process of RNP APCH Procedures: Thailand Case Study ICAO Asia-Pacific GNSS Seminar Bangkok, Thailand 26 March 2012 Flight Validation.
Regional RAIM Prediction System – Progress Report
Agenda Item 6 GNSS Development Status and Future Work Eric Chatre, EC/ESA Rapporteur Technical WG, GNSS Panel Thank you… Good morning… I am ... and.
Introduction to Navigation Specifications
Navigation Applications perspective on ADQ
Stabilized Constant Descent Angle NPA’s
Identifying the Achilles Heels of Instrument Flight Procedures International Flight Inspection Symposium Oklahoma City, OK USA June 2008 Ivan Ferencz CAA.
JAA TGL 10 Explained D J Hawkes UK CAA
P. GAYRAUD /B. RABILLER Cologne the 21st of June 2007
1 PP 48 Use of GNSS distance instead of DME B. Rabiller CNS-ATM steering group meeting Gatwick February 2008.
Procedure Design Considerations
GNSS IFR Installations & Approvals Ron Doggett Aircraft Certification Unit 1.
PROCEDURE DESIGN CRITERIA
Performance based navigation: The ICAO PBN programme
Instrument Ground Training Module 3 Randy Schoephoerster
Breaking the Accident Chain IHST Safety Workshop March 4, 2013.
1 HELIOS HE licopter L ow (Altitude) I FR O peration S witzerland HERZLICH WILLKOMMEN.
© QuickDraw, Inc. GPS Functions OPERATING AREA GPS FLIGHT PLANS FP 1: South Mustang FP 2: BI South FP 3: Central FP 4: North Mustang FP 5: BI North FP.
Federal Aviation Administration The Benefits and Challenges of Implementing Performance Based Navigation (PBN) Instrument Flight Procedures By: Presented.
Sixth Hour Lecture 10:30 – 11:20 am, September 9 Framework for a Software Management Process – Artifacts of the Process (Part II, Chapter 6 of Royce’ book)
Approach Charts and Procedures
September 2002-MoroccoARAB INSTRUMENT PROCEDURE DESIGN SEMINAR 1 RNAV AIRBORNE SYSTEM AIRWORTHINESS REGULATION AND CERTIFICATION ISSUES B.
KAP 140 Autopilot A self-study tool for pilots who fly with the Bendix/King KAP 140 Autopilot System This presentation is provided free of charge to everyone.
The Design Process. Analysis Think – what should the final design do? List customer requirements Consider constraints – balance tradeoffs Define specifications.
CAR/SAM ATN GNSS SEMINAR VARADERO, CUBA 8 MAY 2002 PROCEDURES FOR AIR NAVIGATION SERVICES- OPERATIONS (PANS OPS ICAO DOC. 8168) Barry Billmann Federal.
September 2002-MoroccoARAB INSTRUMENT PROCEDURE DESIGN SEMINAR Instrument Procedure Designer Training and continuous training How to get, improve.
Instrument Procedure Design and Operational Differences
CHARTING Regulation and issues
Stabilized Constant Descent Angle NPA’s
This presentation contains notes in the notes sections for use by instructors when presenting to students.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-65/PIA-1 Optimization of Approach Procedures Including Vertical Guidance.
F E D E R A L A V I A T I O N A D M I N I S T R A T I O N A I R T R A F F I C O R G A N I Z A T I O N 1 Aviation System Standards Flight Inspection Flight.
NATOPS IC Mandatory Callouts Current as of February 2010.
International Training: Area Navigation Pre-flight
Air Berlin discovers GLS Marc Altenscheidt
CS 360 Lecture 3.  The software process is a structured set of activities required to develop a software system.  Fundamental Assumption:  Good software.
C182T Nav III GFC 700 Automatic Flight Control System Module I
Direction générale de l’Aviation civile centre d’Études de la navigation aérienne First ASAS thematic network workshop The user’s expectations and concerns.
1 1 Aeronautical Information Services Brief to AIXM User Group 27 February 2007.
182a_N00FEB23_DG 1 Local Area Augmentation System CONCEPT OF OPERATIONS Alaska Regional Briefing Anchorage October 1, 2002.
LECTURE 4: ICAO CHART requirements
Lecture 7: INSTRUMENT LANDING SYSTEM (ILS)
INSTRUMENT INSTRUMENT FLIGHT APPROACH RULES CHART APPROACH PROCEDURE
Satellite Navigation Program
B FMC.
Arrival Charts and Procedures
Note: This Performance Based Navigation (PBN) Operational Approval Handbook has been developed by CASA Australia in coordination with ICAO and.
GPS & FMS Basics Created:14 Mar 2016 Updated:26 Mar 2016 T6BDriver.com.
Approval Guidance for RNP Procedures with AR February 10, 2015 Federal Aviation Administration Approval Guidance for RNP Procedures with AR C-384 Presentation.
DCIT Document Hierarchy End-to-End Procedures and operational system features effecting multiple organizations Systems Integration Document Detailed system.
PlaneWrong AGM Thursday 13th October
Introduction to Navigation Specifications
2018/6/11 Hong Kong PBN implmentation ICAO GNSS Implementation Seminar/Workshop 26 March 2012 ICAO FPP fdsagsdfgsdgsdgasdfsadf 1.
Association of California Airports Instrument Flight Procedures
Performance Based Navigation: Navigation Specifications
Agenda Item 6 GNSS Development Status and Future Work Eric Chatre, EC/ESA Rapporteur Technical WG, GNSS Panel Thank you… Good morning… I am ... and.
Regional RAIM Prediction System – Progress Report
CAR/SAM ATN GNSS SEMINAR VARADERO, CUBA 8 MAY 2002
Mr. Kevin Lam Director of Airport Infrastructure & Air Navigation
Welcome to the IMC Club Meeting
IAOPA 29th IAOPA World Assembly Queenstown, NZ March 2018 PBN and the Benefits for GA.
FAA SATNAV APPROVALS ICAO CAR/SAM ATN/GNSS SEMINAR Hank Cabler
The Design Process.
PBN and the benefits for GA
Workshop on preparations for ANConf/12 − ASBU methodology
  (1.5 hours) (2.0 hours) Monday (14/07) Registration Welcome ( M/FPP)
RNAV-RNP CERTIFICATION SUMMARY RNAV-RNP EVOLUTION RNAV-RNP CERTIFICATION SUMMARY2 On-Board Navigation Monitoring 2016.
Instrument PDR Summary of Objectives
International Civil Aviation Organization
Presentation transcript:

September 2002-MoroccoARAB INSTRUMENT PROCEDURE DESIGN SEMINAR 1 STAND-ALONE APPROACH OPERATIONS FOR CLASS A GPS

Approbation GPS classe A sur approche2 DOCUMENTATION  Basic documents  TSO C129()  TGL( Temporary guidance Leaflet 3 rev 1  French technic note SFACT/N.ST/AVI N°1  Future  TGL on Approach operations in progress

Approbation GPS classe A sur approche3 INSTALLATION GPS CLASSE A TYPE HSI 1 Interface aéronef (altitude,cap,..). Antenne GPS 1 NAV MSG GPS WPTAPPR FAF 23 IAF 23IF 23 MAP ° BRL LFYY Annonciateurs extérieurs OBS 2 Antenne GPS 2 XTLK 2.6 Nm NAV MSG GPS WPTAPPR GPS 1 GPS 2 Installation à titre d ’information

Approbation GPS classe A sur approche4 TROUBLES  Ergonomy Ergonomy  adequate integration in the aircraft  Data base contents  No mandate to be in compliance with ARINC code 424  Troubles with CF path terminatorCF path terminator  Direction of turn Direction of turn  Bad turn inititation

Approbation GPS classe A sur approche5 PATH TERMINATOR  Class A can interpretate very few Path terminator  eg: TF  Solution : use only TF as in Y and T concept

Approbation GPS classe A sur approche6 EUROPE AIRWORTHINESS POINT OF WIEW  Equipment requirement: TSO C 129a Class A1 Improvement of integrity requirement. Improvement of Mode Activation TSO C129 is acceptable if previous criteria are achieved.  Validation of turn initiation criteria Compliant with ED 75 (RNP MASP) or equivalent.  Lot of gaps in TSO C129

Approbation GPS classe A sur approche7  Validation and checking of the on board material based on specific flight trials To carry out at least 3 approach procedure. Evaluation of the turn initiation fonction Evaluation of Missed approach phase with autopilot. Evaluation of FTE (manual, flight director and autopilot) TGL devoted to approach ( RNP 0.3) Solution can be « T » or « Y » approach. Recommeded function :Display system as electornic map WHAT PROPOSALS?

Approbation GPS classe A sur approche8 IAF Y BAR DESIGN CONCEPT IF FAF MAPt Turn initiation 70° INITIAL SEGMENT INTERMEDIATE SEGMENT FINAL SEGMENT TF coding

Approbation GPS classe A sur approche9 T BAR DESIGN CONCEPT IF FAF MAPt Turn initiation IAF 90° INITIAL SEGMENT INTERMEDIATE SEGMENT FINAL SEGMENT

Approbation GPS classe A sur approche10 APPROACH CONSTRAINT  Length  minimum = stabilization distance (MSD)  Initial : Optimal 5 Nm  Intermediate : min 2 Nm + MSD  Final : Optimal 5 Nm  AREA  IAWP, MATWP,MAHWP : 1/2 AW = 5Nm XTT = 1.5 Nm ATT = 1 Nm  FAWP : 1/2 AW = 2Nm XTT =0.6 Nm ATT = 0.3 Nm  MAWP : 1/2 AW = 1Nm XTT =0.5 Nm ATT = 0.3 Nm  Descent Gradient  Initial max: 8% optimal :4 %  Final [ 6.5 cat A/B / 6.1 CAT C/D, 4.3 %] optimal : 5 %

Approbation GPS classe A sur approche11 DESCENT GRADIENT CALCULATION A IAWP IWP FAWP A/2 B B/2 D TRD = D -(r* tanB/2) - ( r *tanA/2 ) + (r*  /180*B/2) + (r*  /180* A/2) Gradient =  h / TRD

GNSS Protection area for initial segment IAWP IWP FAWP A D D = R.Tan(A/2)+ATT

Approbation GPS classe A sur approche13 NOW IT IS TIME FOR TRIALS !

Approbation GPS classe A sur approche14 034° Solution : USE TF path terminator PAMIERS DEPARURE

Approbation GPS classe A sur approche15Montpellier Solution : USE another WP to impose the turn direction

Approbation GPS classe A sur approche16 Information of GPS Activation Visual Primary field