USRV Incentives Review Chris Warner. USRV Resolution Responsibility and Occurrence  E8.1.1  “…the User shall investigate Reconciliation Values that.

Slides:



Advertisements
Similar presentations
NTS Exit (Flat) Capacity Charges – Credit Arrangements (UNC TPD V3.3.4) Simon Trivella – 14 th January 2009 Distribution Workstream.
Advertisements

Mod 232 Anna Taylor Pricing Manager. 1 Mod 232 An alternative methodology for allocating unidentified energy Currently allocated by RbD entirely in SSP.
144A – Calculation of Value at Risk (VAR) Simon Trivella – 24 th May 2007 Distribution Workstream.
AQ Appeals and the BTU form Chris Warner. 2 AQ Appeals and the BTU form  Presentation reflects NGD’s view of UNC regime as drafted and is intended to.
UNC Modification Proposal Revised Timescales for LDZ Shrinkage Arrangements Simon Trivella – 25 th September 2008 Distribution Workstream.
21 May 2015 GAZ DE FRANCE ESS Mod 115 An alternative view Phil Broom Gaz de France ESS.
Project Nexus Workgroup 9 th September Background During detailed design a number of areas have been identified that require clarification with.
Mod 0445 – Amendment to the Arrangements for Daily Metered Supply Point Capacity Ofgem Direction to Provide Further Evidence National Grid Distribution.
Xoserve Services Workgroup. xoserve Funding Arrangements - Model Comparison ModelKey Benefits User Pays Model AUser Pays Model B Baseline Services (Core)
“Introduction of a New Shipper Obligation in Relation to the Procurement of Gas Below the Gas Safety Monitors” Transmission Workstream 4 th Jan 2007 Chris.
Review Group 0221: User Commitment Best Practise guidelines for Gas and Electricity Network Operators Credit Cover (2005)
Review of the UNC Post-emergency Arrangements Workshop 1 March 2009.
1 Mod Review Group 126 Feb 07 slides 126 Review Group – Restriction of Invoice Billing Period  The review proposal is primarily concerned with restricting.
UNC G7.3.7 Invoicing Read Estimation Proposal Requirement for Read Estimation & Proposed Methodology Dean Johnson Distribution Workstream – 25 th August.
Proposed Agreement For Identification And Administration Of Unregistered Sites Chris Warner Network Code Manager.
Revision of the UNC Post-Emergency Arrangements draft proposal July 2009.
UNC (Urgent) Modification Proposal 0044: “Revised Emergency Cash-out & Curtailment Arrangements” UNC Transmission Workstream 11 th August 2005.
DN Interruption Reform Distribution Workstream 23 rd July 2009.
Shrinkage Forum Tuesday 8 March 2011, 31 Homer Road.
Mod 270 Potential Options Rob Hill 15/02/2009. Six potential options following discussion at last months Development Workgroup OptionNameDescription 1Elective.
1 UNC Modification 429 Customer Settlement Error Claims Process – Guidance Document.
Total xoserve income £(a)m (ASA services – includes element for transporter funded changet) Transporter funded change budget built into service charge.
Modification proposal 0073 ‘Revision to the Notice Period regarding the implementation of changes to Transportation charges’ Transmission Workstream, 2.
1 To re-define the Aggregate Reconciliation Period to reflect the period to which the charge relates.
Billing Operations Forum 24 July 2007 RbD Overview Billing Operations Forum 24 July 2007 RbD Overview Fiona Cottam.
Modification Proposal 0395 & 0398 – Limitation on Retrospective Invoicing and Invoice Correction 1 st December 2011.
1 v1 iGT CSEP Billing Solution ScottishPower Proposals April 08.
Customer Charge On behalf of all DNs 25 October 2010.
Gas Distribution Transportation Charging What are the Risks to Pricing predictability? Stephen Marland Pricing Manager
1 Mod Review Group 126 Mar 2007 slides 126 Review Group – Restriction of Invoice Billing Period  The review proposal is primarily concerned with restricting.
11 User Pays User Committee 16th February Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
Emergency Cashout Prices and Emergency Curtailment Quantity (ECQ) Adjustment Ritchard Hewitt Gas Code Development Manager.
Project Nexus Workgroup Extension of Modification 0434 to permit retrospective updates pre-dating Project Nexus Go Live Date 9 th September 2014.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th March 2009.
PN UNC 4 th September 2012 Reconciliation Issues (Action: NEX06/02)
ALLOCATION OF RbD ACROSS RELEVANT PERIOD DNOs’ comments on previous Workstream discussion ALLOCATION OF RbD ACROSS RELEVANT PERIOD DNOs’ comments on previous.
Performance Assurance 21st May Incentives. USRV’s – Incentive Regime Charges are based on a range of standards USRV Period runs from 21 st of one month.
1 UNC Review Group 175 – Encouraging Participation in the Elective Daily Metered Regime 26 th June 2008.
UNC Modification Proposal 0380 Periodic Annual Quantity Calculation Calculation of Daily Supply Point Capacity Alan Raper – DNCMF 26 th September 2011.
MOD Proposal 0224 Facilitating the use of AMR in the Daily Metered Elective Regime 28 May 2009 Code User Pays Services.
UNC Modification Proposal 0192 National Grid Distribution Proposal 0182: “ Introduction of DNO obligations to facilitate resolution of unresolved USRVs”
PN UNC Workgroup Invoicing 10 th January Objectives of the Workgroups To determine business principles for future Invoicing processes –Consider/review.
Restricted Invoice Period Criteria Rochelle Hudson.
DN Interruption Reform Transmission Workstream Mark Freeman 5 th April 2007.
1 Modification 0152V Implementation Matters 25 October 2007.
SoS Report PAC – 13th December 2016.
UNC Modification Proposal 0202 National Grid Distribution
NG Strawman – Ofgem Response
Capacity/Commodity Split Impact on Suppressed reconciliations
UNC Trader User – Licence obligations
Modification Proposal 0192 – Draft Business Rules.
Incentives 26 September 2018.
Large Supply Point Reconciliation which spans Pre & Post Go Live
NG Strawman – Ofgem Response
NG Strawman – Ofgem response
Connected System Exit Points Administration Options
CSEPs Reconciliation Proposals
Modification 0117 – Additional Considerations
Connected System Exit Points Administration Options
Credit Modification Proposals Update
Modification Proposal 115 – ‘Correct Apportionment of NDM Error’
AUG Query Responses 21st November 2013.
Connected System Exit Points - Update
UK Link Replacement Programme additional supporting UNC modifications
DNO Obligations to Facilitate Resolution of Unresolved USRVs
Modification Proposal 136
UIG Task Force Progress Report
Erika Melén, Senior Settlements Analyst Modification Proposal 141a
Xoserve Draft UIG Incentives Modifications 20 May 2019
Presentation transcript:

USRV Incentives Review Chris Warner

USRV Resolution Responsibility and Occurrence  E8.1.1  “…the User shall investigate Reconciliation Values that have been Suppressed following Individual NDM Reconciliation…”  E8.1.2  Suppression occurs in accordance with the Network Code Reconciliation Suppression Guidelines  Financial tolerances per AQ banding  Underlying negative consumption  Guidelines reviewed from time to time

Why Suppress?  Network Code Reconciliation Suppression Guidelines para 2.6  “The tolerances are set with a view to maximising the suppression of values generated from erroneous data and minimising the suppression of valid values”  Intended to protect Users from large erroneous invoice values  energy invoice must be paid first and subsequently queried  potential to cause severe financial hardship

Issues Identified pre 0637 Implementation  Uncertainty created for RbD Users by unresolved items  Considerable USRV backlog (38,000 items plus).  Lack of incentive for non-RbD Users to resolve  Lack of incentive for compliance with existing Network Code resolution requirements  Selective resolution?  More economic to leave unresolved  Approval of credits only  Lack of priority

Mod 0637 – Network Code Process  Various options discussed at Network Code Reconciliation Suppression Guidelines Sub-Group in 2003  Initial proposal for incentives raised by a Shipper  Following discussions at Suppression Guidelines Sub- Group, Modification Proposal submitted by Transco  Final Modification Report issued to Ofgem on 15 Sep 2003  Direction to Implement issued by Ofgem on 19 Nov 2004  Following consultation with the Supply Point & Billing Workstream, Modification implemented on 21 Feb 2005

Mod 0637 Regime – Resolution Incentives (E8.3)  Backlog (pre 21 Feb 2005)  Unresolved after 4 months (or older) incurs £30/month until resolved  Ongoing Performance  50% resolution required by 20th of following month (no incentive charge applied)  95% resolution required by 20th of second month. Any unresolved below the 95% standard incur £20  Any unresolved after 4 months (or older) incurs £30/month until resolved  Additional features  Allowance for significant volume increases  >20 USRV item increase, and  => 50% increase (in comparison to previous 6 months average) additional 1 month on 2 and 4 month standard

Mod 0637 Regime – Re-distribution of Revenue  Overall monthly cap £100,000.  If exceeded all charges scaled down to in aggregate equal £100,000.  2% allowance for Transporters for administration of scheme  Remaining revenue allocated to RbD community  Based on market share for relevant LDZ for relevant period

Post 0637 Performance – Liable USRVs by Month

Post 0637 Performance – Liable USRVs by Achievement Targets

Post 0637 Performance – Generated USRVs

Post 0637 Performance – Trends of Liable USRVs

Mod 0637 Regime – Effectiveness?  Is the current level of USRVs a concern for Users?  Why is the regime arguably not working?  What changes could be made to improve performance  Changes to the existing regime?  Additional measures?