Workshop: Maintenance Work Requests May 3, 2006. Project Goals  Implement SAP Plant Maintenance system Provide integration with Finance, HR, and Materials.

Slides:



Advertisements
Similar presentations
Filing a Warranty Claim On-Line Claim Filing. 1.Upon successful login, the screen to the right appears. 2.To start a new warranty claim or check the status.
Advertisements

Total Productive Maintenance
Workshop: Preventive Maintenance
Inspection & Preventive maintenance of breakers
Quad Plus Shredder Drive Maintenance Joe Kowalkowski Engineering Manager – Recycling Industry
Steve Schwabe Woolpert Project Manager
DAILY APPARATUS CHECKS The goal of a daily inspection is to ensure all systems and equipment are in proper working order before apparatus leave the station.
Spillman Sentryx 6.0.
Benefits of the new EAM release QAD West Coast Users Group Presenter: Kate Fenello EAM 12.8.
Workshop: Maintenance Work Orders May 9, Project Goals  Implement SAP Plant Maintenance system Provide integration with Finance, HR, and Materials.
Workshop: PM Structure April 26, Agenda  Introductions  Project Overview  Plant Maintenance Project Timeline  Future Blueprinting Sessions 
Introduction to SAP R/3.
Introduction University of Mississippi at a glance University of Mississippi at a glance Admissions (Before and After ISR) Admissions (Before and After.
Summary Maximo is an Enterprise Asset Management System used by Cornell University Facilities Services. Many of Cornell's physical assets found across.
1Furmanite Confidential - 1/9/04 Motor and Pump Base Foundational Repair.
Things to note... The Simple Cart is designed to give users an experience similar to other online shopping sites by separating the cart from the checkout.
1 Inspection and Testing Approved for Public Release.
Module 11: Use and Care of Equipment At the HIV Rapid Testing Site.
Blueprint Training Presentation: Maintenance Work Orders October 3, 2006.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 15S Maintenance.
LMR Fall Release 11/2/2012. Notes: Placeholders and Accelerator Keys Users of the LMR have requested a way to define a placeholder within a Note or Custom.
EPTO Electronic Paid Time Off System Lora Headdy ePTO & HRMS eDoc System Manager.
Primavera Highlights During COLLABORATE  Primavera Key Note: Making the Most of Your Oracle Primavera Investment Dick Faris, Primavera Co-Founder & Oracle.
Workshop: Measurement Points and Permits
Screen Previews for Shopping Carts and Checkout Process 10.3 release October 05, 2010.
TSS First steps with Fwin - Maintenance TSS - Software.
| See the possibilities… Job Costing & Work In Process.
ILLINOIS COMMERCE COMMISSION Darin Burk Manager – Pipeline Safety 1.
Tier 2 Power Supply Planning Workshop Advanced AMI Benefits Overview.
Piping and Valves Unit 8. Today’s Agenda Purpose of piping and valves Material of construction and service Pipe fittings Piping and valve connections.
CFM S4 Cloud iQ Guide THE FUTURE OF CASH AUTOMATION.
Project management Topic 7 Controls. What is a control? Decision making activities – Planning – Monitor progress – Compare achievement with plan – Detect.
LEADS/EMS DATA VALIDATION IPS MeteoStar December 11, 2006 WHAT IS VALIDATION? From The Dictionary: 1a. To Make Legally Valid 1b. To Grant Official.
NERC Lessons Learned Summary LLs Published in September 2015.
Microsoft Dynamics ® NAV 2009 Service Management.
Unit 17: SDLC. Systems Development Life Cycle Five Major Phases Plus Documentation throughout Plus Evaluation…
Electronic Design Change Process Paul Tobin Jr.- PKMJ Technical Services.
Modern Maintenance. Management
1 Equipment Maintenance Service Maintenance Form.
Workshop: Timekeeping June 13, Project Goals  Implement SAP Plant Maintenance system Provide integration with Finance, HR, and Materials Allow.
Blueprint Training Presentation: Time Entry & Equipment October 31, 2006.
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
Priority PDA module overview Developed in conjunction with organisations who use field service engineers, carrying out on-site installs, repairs or maintenance.
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
Reactive to Proactive Maintenance through LEAN. What is Reactive, Proactive and Lean?
Anytime, Anywhere Access Benefits Functionality Work Order Administration Dispatch Work Order Work Order Details New Work Order Additional Functionality.
Workshop: Work Completion Process May 16, Project Goals  Implement SAP Plant Maintenance system Provide integration with Finance, HR, and Materials.
Order Types order category control indicators open item management CO partner update revenues classification retention periods retention period 1 retention.
Temperature Test Allows monitoring of temperature changes.
QuickServe Online Service Training
Project Management: Messages
Data-Basics Training & Support
RB Control Systems CUSTOMER pROFILEs
Small Sites Planning & Scheduling
SAP CS INTRODUCTION SAP Customer service is a highly integrated process module which involves a strong integration of SAP PM,SD,MM,FICO and PS. The scenarios.
Chapter 16 Supplement Maintenance.
15S Maintenance.
Workshop: Materials Use
Total Productive Maintenance and Quick Changeover
Off-Highway Diagnostic Improvement Project
Day Services: Changes to the Changes
Operations and Maintenance
Unit I Module 3 - RCM Terminology and Concepts
Assistive Technology Implementation
Fwin - Maintenance TSS - Software
Workshop: High Level Reporting
QuickServe Online Service Training
Workshop: Equipment June 29, 2006.
QuickServe Online Service Training
Fluid Power System Maintenance and Troubleshooting
Presentation transcript:

Workshop: Maintenance Work Requests May 3, 2006

Project Goals  Implement SAP Plant Maintenance system Provide integration with Finance, HR, and Materials Allow enhanced scheduling and planning for work assignments Provide work scheduling as well as management reporting tools Accommodate the use of mobile technology to reduce paperwork Improve automated updates to customers about the status of work Implement a Preventive Maintenance system for buildings, areas, and equipment Utilize standard SAP functionality to collect utility usage and cost information for recharge calculations

Agenda  Introduction  Discussion of Maintenance Work Requests  Preview of Next Blueprinting Session  Other Discussion

What is the SAP Work Request Process?  Notification This is a non-financial transaction which can be used to request work, report a problem, or record an activity It has no visibility outside of the plant maintenance area of SAP It may be processed via a work order, used to record non-costed activity, or closed without any work being done It will be automatically created by a work order, if desired It is frequently created by an end-user via a Web form

Why should a notification be used?  To document an event  To request work which may or may not be done  To record a breakdown for statistical purposed  To record the technical reasons for a failure for later analysis

What information does a notification capture?  Descriptive information. This includes “long text” which is of unlimited length  A priority for the work  A object to be maintained: A functional location (Building, Room) or piece of Equipment  Contact information for the person reporting the problem or requesting work  The ability to assign a responsible person to this notification  “Breakdown” information, if appropriate. This is the start and end time of the breakdown. (The system will calculate Mean Time Between Failures and Mean Time to Repair.)  Codes for the “Damage”, “Cause of Damage”, and “Activity”

What information is required?  SAP only requires a description

Notification Types Maintenance Request – Used to request work, not necessarily to report a problem Malfunction Report – Used to report a problem Activity Report – Used to record an activity performed, not necessarily to address a request or problem. This might be used to report findings from Preventive Maintenance or to record technical information regarding the repair of a critical machine The Maintenance Request and Malfunction Report are very similar in format and content The Activity Report provides for entry of more codes Recommendation: Implement all 3 and use them as required.

What does the “Priority” do?  It can determine the dates based upon predefined criteria for each priority The “Start Date” is calculated based on the current date. It may also include a “Start Time”. (Dates and times for this calculation may be in minutes, hours, or days.) The “End Date” is also calculated based on the current date. (Note: The Start Date and End Date may be in different units.)  Each Notification type may have its own set of priorities (A Work Request could have different priorities than a Malfunction Report.)  If required, different notifications types with their priorities may be established for each Plant (CPPD, MPPD, HOUS, UTIL)

What are the codes and groups?  Damage Codes  What’s wrong  Leaking, Squeaking, Stalling, Stopped, etc.  Cause of Damage Codes  Why is it not working  Loss of lubrication, low voltage, dirty, operator error, etc.  Activity Codes  What was done to correct the problem  Lubricated, Reset, Adjusted, Aligned, etc.

Who creates the codes? You do!  The list of codes can be short to start and can be expanded as new codes become required  The code groups can be specific to types of equipment (Different lists for pumps, motors, air handlers)  Some suggestions follow

Possible damage codes Arcing Bent Bowed Broken Weld Burnt Corroded Cracked Enlarged Eroded Frayed Loose Missing Noisy Pitted Plugged Powdery Sheared Shorted Smoking Split Stopped Stretched Surging Torqued Vibrating Worn

Possible cause codes Abrasion Amps Low/High Arcing Blowing By Bolts Missing/Loose Burnt Connection Loose Control Off Corrosion Emission High Erosion Flooding Flow Low/High Force High Grounded Leaking Lubrication Low Lubrication Wrong Plugged Power Off Pressure Low/High Surging Temperature Low/High Torque High Vibrating Weld Broken

Possible activity codes Adjusted Aligned By-Passed Calibrated Charged Cleaned Cleared Connected Coupled Dried-Out Fluid Added Fluid Replaced Grounded Inspected Insulated Jumpered Lubricated Measured Reconnected Reinforced Removed Replaced Shimmed Welded Uncoupled

Notification Fields Determine which fields should be eliminated because they will not be used Determine which fields should be required (if any)

Topics For Next Blueprinting Session  Determine Maintenance Work Order Processing Order Types Tabs and Fields on the Screen Settlement Rules (for Recharge) Sub-Orders Material Use and Availability Check Order Scheduling Releasing Orders Maintenance Activity Types