LCLS-II Scientific Opportunities Workshops LCLS-II Status David Schultz 9-12 February 2015.

Slides:



Advertisements
Similar presentations
The New LCLS-II Project 4 November 2014 Meeting of the Superconducting Particle Accelerator Forum of America John N. Galayda.
Advertisements

Superconducting Undulator R&D Proposal for LCLS-II Paul Emma (SLAC) Superconducting Undulator R&D Review Jan. 31, 2014 please MUTE your microphones or.
Superconducting Particle Accelerator Forum of the Americas December 11, 2013 Dr. Patricia M. Dehmer Acting Director, Office of Science, U.S. Department.
James B. Murphy, Director BES Scientific User Facilities Division
DELTA Project Overview Heinz-Dieter Nuhn – LCLS Undulator Group Leader Presented at LCLS-II Physics Meeting Tuesday, October 11, 2011.
SCUs for the LCLS-II HXR FEL SCUs for the LCLS-II HXR FEL P. Emma, et. al. July 9, 2014 Hard X-Ray (HXR) FEL for LCLS-II must cover 1-5 keV (4-GeV) SASE.
XFEL Undulator Efforts at DESY and Thoughts on LCLS-II H.-D. Nuhn June 30, 2010.
1 Enhancements to the Linac Coherent Light Source.
Plan ahead for the GDE Barry Barish ILC Consultations URA, Washington DC 12-May-05.
Sept. 18, 2008SLUO 2008 Annual Meeting Vision for SLAC Science Persis S. Drell Director SLAC.
The BESSY Soft X-Ray SASE FEL (Free Electron Laser)
February 19, 2008 FACET Review 1 Lab Overview and Future Onsite Facilities Persis S. Drell DirectorSLAC.
FAC, 4/16/07 D. Schultz 1 e-Beams Systems Update People ARR Linac Installation Undulator Production MMF Operations David Schultz.
Opening Comments and Charge 19 January 2004 Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear.
LCLS Undulator Systems TDR Charge Linac Coherent Light Source Stanford Linear Accelerator Center Technical Review, March 3, 2004.
Superconducting Undulator R&D Review SLAC, LBNL, ANL Jan. 31, :00 AM (PST) Kings River Room (B ), SLAC or “Go-To-Meeting” teleconference.
Status of LCLS A. Brachmann, SLAC National Accelerator Laboratory.
Thomas Jefferson National Accelerator Facility Page 1 23 rd Annual HUGS Program June 2-20, 2008 CEBAF Overview HUGS08 June 3 CEBAF Overview HUGS08 June.
P. Emma, …for the SCU R&D collaboration: ANL, LBNL, SLAC August 28, 2014 P. Emma, N. Holtkamp, H.-D. Nuhn, SLAC C. Doose, J. Fuerst, Q. Hasse, Y. Ivanyushenkov,
SuperConducting Undulator (SCU) R&D Motivation and Status P. Emma For the SCU R&D collaboration: ANL, LBNL, SLAC June 27, 2014.
Low Emittance RF Gun Developments for PAL-XFEL
Keith O. Hodgson SSRL Director Brief Update on the Linac Coherent Light Source - LCLS February 26, 2002 Basic Energy Sciences Advisory Committee Undulator.
Cost Estimate Marion White (Argonne) SCU 3-Lab Review Meeting December 16, 2014.
LCLS-IISC Parameters Tor Raubenheimer. 2 Operating modes keV (120 Hz) keV (100 kHz) keV (100kHz) 4 GeV SC Linac Two sources:
ARD All-Hands Tor Raubenheimer November 22 nd, 2010.
Cryomodule Development at Fermilab Don Mitchell Representing the SRF engineering community at Fermilab April 20, 2009 Tsukuba, Japan TILC09.
1 SPAFOA Capitol Hill Briefing December 2013 Harry Weerts International Linear Collider - progress & status SPAFOA meeting, Dec 11, 2013, H.Weerts.
Workshop Overview & Charge, Science Examples, Instrumentation R&D Bill Schlotter Feb. 11, 2015.
Brief Introduction to (VUV/)Soft X-ray FELs R. P. Walker Diamond Light Source, UK ICFA Workshop on Future Light Sources March 5 th -9 th, 2012 Thomas Jefferson.
Global design effort DOE meeting 8/10/06 Global design effort Americas 1 FY07 DOE ILC Budget recommendations G. Dugan ILC-GDE/Cornell University GDE Americas.
LCLS-II Capabilities & Overview LCLS-II Science Opportunities Workshop Tor Raubenheimer February 10 th, 2015.
PIP-II: Why a new accelerator? Paul Derwent Fermilab Community Advisory Board 23 July 2015.
ILC Test Facility at New Muon Lab (NML) S. Nagaitsev Fermilab April 16, 2007.
Workshop Overview, Charge and Deliverables Joachim Stöhr.
LCLS Facility Planning for LCLS-II. 2 LCLS vs. LCLS-II NowHXU - CuSXU - CuHXU - SCSXU - SC Photon Energy Range (eV)
DESY Deutsches Electron Synchrotron Shima Bayesteh.
Progress and Plans for R&D and the Conceptual Design of the ILC Main Linacs H. Hayano, KEK PAC2005 5/18/2005.
LCLS-II Design and FEL R&D
SCU 3-Lab Review Meeting, Dec. 16, 2014 SCU Presentations Today Intro. & Performance Motivations (P. Emma, SLAC, 20+5) Conceptual Cryostat Design: Option-A.
LCLS-II Particle Tracking: Gun to Undulator P. Emma Jan. 12, 2011.
ERL Status and Plans at Jefferson Lab Stephen V. Benson, On behalf of the Jefferson Lab FEL team Current status Next Generation Soft X-ray Sources JLab.
Patrick’s Updates - 8/30/11 (one slide for each of the following) 1.XTCAV Project 2.ASTA Gun Test Facility Instrumentation & Controls 3.Fast wire scanner.
LCLS-II: Accelerator Systems LCLS SAC Meeting P. Emma et al. April 23, 2010.
김 귀년 CHEP, KNU Accelerator Activities in Korea for ILC.
Steering Group Meeting 10:30 – 12:30 am CDT Monday, July 23, 2007 Y2K.
J. Corlett. June 16, 2006 A Future Light Source for LBNL Facility Vision and R&D plan John Corlett ALS Scientific Advisory Committee Meeting June 16, 2006.
UK X-FEL National Laboratory Perspective Susan Smith STFC ASTeC IoP PAB/STFC Workshop Towards a UK XFEL 16 th February 2016.
QA/QC from the point-of-view of a "receiving" lab Marc Ross 15 October 2014 Customer’s Responsibilities Requirements for Conformance of SRF Cryomodules,
26 April, 2016 LCLS II Cryomodules and Cryoplant, Joe Preble LCLS-II Overview JLAB Organization for LCLS-II JLAB responsibilities & Schedule and Status.
, Summary of Working Group 1 Linear Colliders and Light Sources C. Christou, M. Dehler.
HISTORY OF SNS DESIGN AND TECHNOLOGY CHOICES PROJECT X WORKSHOP NOVEMBER 12-13, 2007 R. KUSTOM.
G. Penn SLAC 25 September 2013 Comments on LCLS-IISC Design.
LCLS-II Project Overview David Schultz LCLS-II Deputy Project Director March 19, 2012.
The LCLS-II project consists of a new gun, a new superconducting linac, and new variable gap undulators. Civil construction will be at a minimum, and existing.
1 0.1-nm Hard X-ray XFEL  Project Period: 2011 ~ 2015  Total Budget: 400 M$  10-GeV Electron Linac (Normal Conducting S-band, 60 Hz)  Total Length:
LCLS-II Introduction. LCLS-II Project Plan and Scope Overview 13 September 2013.
X-Ray Free-Electron Laser Amplifiers and Oscillators for Materials and Fundamental Research Kwang-Je Kim ANL and U. of Chicago ICABU Meeting November 12,
1 NGLS Outline and Needs in Superconducting RF Materials Development John Corlett SRFMW, July 16, 2012 Office of Science.
​The LCLS-II and SLAC Facilities for Dark Sector Searches
Uppsala Commitment to ESS and FREIA Planning
Paul Scherrer Institut
SCUs for the LCLS-II HXR FEL P. Emma July 8, 2014
ILC Global Design Effort
Accelerator Layout and Parameters
LCLS-II-HE FEL Facility Overview
SCRF for cw operating XFEL
LCLS-II-HE FEL Facility Overview
TW FEL “Death-Ray“ Studies
WBS 5.0 LCLS Strategic Projects Division
Brief Introduction to (VUV/)Soft X-ray FELs
Presentation transcript:

LCLS-II Scientific Opportunities Workshops LCLS-II Status David Schultz 9-12 February 2015

LCLS-II Concept Use 1 st km of SLAC linac tunnel for CW SCRF linac 2 LCLS-II Scientific Opportunities

LCLS-II Project Scope AcceleratorSuperconducting linac: 4 GeV Undulators in existing LCLS-I Tunnel New variable gap (north) New variable gap (south), replaces existing fixed-gap und. InstrumentsRe-purpose existing instruments (instrument and detector upgrades needed to fully exploit) South side source: keV (120 Hz, copper” linac ) keV ( ≥ 100 kHz, SC Linac) 4 GeV SC Linac In sectors 0-10 NEHFEH 14 GeV LCLS linac still used for x-rays up to 25 keV North side source: keV ( ≥ 100kHz) LCLS-II Scientific Opportunities 3

Project Collaboration LCLS-II Scientific Opportunities 4 Cryomodule engineering/design Cryomodules: ~1/2 of total Liquid helium distribution system Cryomodules: ~1/2 of total Cryoplant design and procurement Undulators e - gun & associated injector systems Undulator Vacuum Chamber Undulator design: vertical polarization Cryomodule R&D, prototype support e - gun option

LCLS-II Cryomodules 35 Cryomodules, 12.6 m long, 1 m diameter LCLS-II Cryomodule follows the ILC design (shown) 8 SC cavities and a SC quadrupole magnet LCLS-II Scientific Opportunities 5

Baseline Deliverables  Hard X-Ray Source:  1-5 keV w/ 4 GeV SC linac  Up to 25 keV with LCLS Cu Linac  Soft X-Ray Source:  250 eV-1.2 keV w/ 4 GeV linac  200 eV requires <4 GeV Cu Self Seeded High Rep Rate SASE Self Seeded (Grating) Cu SASE Photon Energy (keV) SC Linac High Rep Rate Cu Linac Legend 4.0 GeV LCLS-II Scientific Opportunities 6

Project Timeline BESAC subcommittee report July 2013 LCLS-II starts a response to the reportJuly 2013 Mission Need Statement signed Sep 2013 Approval, CD-1Jun 2014 Purchase niobium materials for cavitiesOct K refrigeration plant awardApr 2015 Prototype accelerating modules testDec 2015 Remove copper linac, first kmJun 2016 All cryomodules at SLACSep 2018 Cryoplant installedDec 2018 First LightJan 2020 DOE Critical Decision 4 (Level 1) Sep 2021 LCLS-II Scientific Opportunities 7

The LCLS-II Project: an extraordinary confluence of Institutional core competencies across the collaboration Talented, experienced scientists and engineers Strong management support at SLAC and the Partner Labs Outstanding support from DOE LCLS-II Scientific Opportunities 8

9 In Closing LCLS-II Scientific Opportunities LCLS-II goals have been changed radically by the reconfiguration of the project High average brightness The change had to come now- or else beyond 2030 DOE has made a commitment to the long-term future of SLAC as the home of the nation’s large-scale FEL research facility I believe that DOE understands The scope of LCLS-II and its performance capabilities What LCLS ought to be in the long term Your input will determine the future capabilities of LCLS-II