TPC Proposal for the 35 Ton Liquid Argon Test Abstract We propose to equip the 35 ton cryostat with one APA and two CPA’s, and all the necessary equipment.

Slides:



Advertisements
Similar presentations
Design of the T962 Cryostat L. Bartoszek BARTOSZEK ENGINEERING 5/10/07.
Advertisements

LBNE 35 ton prototype Phase 1 summary Terry Tope Fermi National Accelerator Laboratory All Experimenters’ Meeting – Fermilab – May 19, 2014.
Materials Qualification for long drift Liquid Argon TPC Effect of water on electron drift lifetime Plans Material Tests, purging and H20 studies, Purity.
Burglar Alarm Leaving Certificate Technology. Parts List.
LAr1-ND Conceptual Design Review of Status June 25 Craig Thorn.
D. Peterson, “Status of the Cornell/Purdue Program” TPC R&D Mini Workshop, Orsay 12-January Status of the Cornell/Purdue Program: first events with.
D. Peterson, “The Cornell/Purdue TPC”, ALCPG, Snowmass, 23-August The Cornell/Purdue TPC Information available at the web site:
FT Integration Raffaella De Vita INFN – Genova Jefferson Lab 10/15/2013.
7/28/03P. Kroon AEROGEL Assembly of Cells into 80-cell Array: –8 cells wide by 10 cells high mm high (Y) by 2077 mm wide (Z) by about 335 mm deep.
1 Telecom Cabling Ladder racks systems and relay racks Ladder racks systems and relay racks.
Designs of Large Liquid Argon TPCs — from MicroBooNE to LBNE LAr40 Bo Yu Brookhaven National Laboratory On behalf of MicroBooNE and the LBNE LAr Working.
Large Cell Scope Pictures HV Gnd 1nF Large Cell Tube Anode signal Cathode signal scope S1 S2 S1 S2 The following scope pictures were all taken with the.
Status of LBNE LAr and LAr1 at FNAL Bruce Baller - Fermilab.
Detector R & D in the 35 ton Membrane Cryostat 9/11/2015HV Feed for BNL Meeting1 Hans Jostlein This is a draft and a list of possible studies. The main.
CERN LBNE Test Experiment. Plan view of Bat
C. Bromberg 1 Michigan State University Feb. 8, 2004 RPC Monolithic Detector l Most absorber shipped direct to the site äShipping minimized äHeavy (~20.
LBNE Reconfiguration Workshop – April 2012 FD Assumptions and Cost Estimate 1 Bruce Baller.
Ron Madaras, LBL U.S. Pixel Meeting, SCIPP, July 9-10, 2003 Patch Panel 1 (PP1) Brief Review Cost and Effort Estimate.
Materials Qualification for long drift Liquid Argon TPC Effect of water on electron drift lifetime Plans S. Pordes Argon Purity1Integrated R & D Plan Review.
FLARE Constructing the detector First FLARE Workshop November 4-6, 2004 Rafael Silva Fermilab / PPD / MD Fermilab Liquid Argon Experiments.
TPC Design Concept: From MicroBooNE to LAr20
Poster Design & Printing by Genigraphics ® Neutrino Interactions Studying the properties of neutrinos will shed light on the origin of the.
1 Liquid Argon Dark Matter: Synergies with R&D for Neutrino Detectors: Chemically clean Argon for drifting electrons and light output (Oxygen and H20 relevant.
Materials Qualification for long drift Liquid Argon TPC Effect of water on electron drift lifetime Plans Material Tests, purging and H20 studies, Purity.
Forward Muon Installation and Commissioning Dmitri Denisov Fermilab Director’s review 7/12/1999 Plan Forward muon detectors Mini-drift tubes installation.
Long Bo for LAPD Hans Jostlein10/20/2011 December 15, 2015 Long Bo for LAPD 1.
Considerations for increasing the single-phase fiducial volume Jim Stewart July EFIG J stewart - EFIG July
Long Bo FT and Flanges April 12, 2012 talk Hans Jostlein 12/19/2015Long Bo FT and Flanges1.
1 Jim Thomas - LBL A proposal to close the Grid Leak “it will never die” Yuri Fysiak, Jim Thomas & Gene VanBuren Eric Anderssen, Howard Wieman & Jon Wirth.
LAr1 Plans at FNAL Bruce Baller - Fermilab. Outline LAGUNA Meeting - Mar  LBNE LAr detector overview  Prototyping plan  1 kton prototype.
February 2010Hans Jostlein1 Cellular Design for a Large Liquid Argon TPC Detector - Design goal -Cellular Design -Additional Possibility: -Light Detection.
DARK MATTER SEARCH Carter Hall, University of Maryland.
Considerations for increasing the single-phase fiducial volume Jim Stewart July EFIG.
Contents Jason Tarrant STFC Aim of Presentation to show: l Problem of compressors located at south shield wall l Description of compressor layout and services.
Concept Design for LBNF Far detector (LAr single phase)
1/26/2009 S. Pordes LAr R & D Briefing 1 Liquid Argon presents prospect of continuously live Imaging Calorimeter C. Rubbia.
Ions in LAPD Can we Observe Them in Long Bo ? 3/6/2016 Ions in LAPD Sarah Lockwitz and Hans Jostlein, Fermilab 1 Sarah Lockwitz and Hans Jostlein Fermilab.
Increase of the T600 maximum drift distance and preliminary considerations for larger aluminum vessels Claudio Montanari INFN-Pavia, Italy 1ICARUS Meeting.
Long-Baseline Neutrino Facility LBNF Cryostats Systems Requirements on FSCF Marzio Nessi LBNF/DUNE DOE/SC CD-3a Director’s Review October 27-29, 2015.
Dual-Phase ProtoDUNE Detector Installation : Plans & Constraints Adamo Gendotti.
Wire and Cathode Planes - Current Concept (work in progress) PPD Internal Review – 2 nd Part April 19 th, 2005 Rafael Silva FLARE Fermilab Liquid Argon.
Single phase ProtoDUNE detector installation Plans and Constraints Jack Fowler Duke University 23-Feb-2016.
David Finley / PPD Engineering Meeting / June 24, Fermilab Slide 1 R&D Toward Large Liquid Argon Time Projection Chambers “Large” means up to 100.
35ton and LAPD cryostats and future DUNE detector development.
Laser Calibration of a Liquid Argon TPC G. Sinnis J. Danielson W. Sondheim.
CPA: Decisions, Issues, Next steps Francesco PIETROPAOLO CERN / INFN-Padova Field Cage CPA and Integration/Installation week, BNL, March 11th, 2016.
Single-Phase ProtoDUNE Construction Planning Jim Stewart LBNC January 11, 2016.
Electrostatic FEA of the Ground Plane Features Bo Yu Sept. 14, 2015.
Single Phase ProtoDUNE TPC QA/QC Plans The SP TPC Team Jan. 13, 2016.
Value Engineering proposal: Putting APA’s on outside or put short drift cell on outside April 21, 2014, Post meeting rev. April 25, 2014 Russ Rucinski.
Overview of 35ton Phase 2 Detector Bo Yu 35t Installation Readiness Review August 25, 2014.
Cryogenic Test Stand Facilities at PAB: Stephen Pordes Neutrino R&D Workshop January 20 –
The DUNE 35ton Prototype at Fermilab. DUNE FD ND 1300 km We have learned much about neutrinos in the last 70 years, but there is still much we don’t understand.
Recent Changes to the FD TPC Design Bo Yu Oct. 20, 2015.
1 Cary Kendziora Fermi National Laboratory Cary Kendziora Fermi National Laboratory CEC-ICMC 2013 Anchorage Alaska – June, 2012.
Installation of the T600 at Fermilab Fermilab, February 15,
Single Phase ProtoDUNE TPC CERN The SP TPC Team Jan. 13, 2016.
35 Ton Membrane Cryostat Temperature Profiler Proposal Hans Jostlein Fermilab 7/13/ ton Temperature Profiler Hans Jostlein, Fermilab 1.
R&D activities on a double phase pure Argon THGEM-TPC A. Badertscher, A. Curioni, L. Knecht, D. Lussi, A. Marchionni, G. Natterer, P. Otiougova, F. Resnati,
TPC Support Installation 26 Apr 2016Dan Wenman Mechanical Engineer1 Overview Installation of the support rails Details of the rail from the SAS to the.
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
Grid Pix Field Simulations and precision needed for a module
A. Badertscher, L. Knecht, D. Lussi, A. Marchionni, G. Natterer, P
First tests on the roll-formed field cage.
Additional muon stations for the Upgrade of the Elevator Regions in the ATLAS Muon Spectrometer. Integration issues Denis Diyakov, Alexander Seletskiy,
Warm structure requirements :
NP04 CPA/FC/HV Interfaces
First of all we will remind some numbers:
Test box for ProtoDUNE SP – Integration Test
TPC Paul Colas Technical meeting, Lyon.
Presentation transcript:

TPC Proposal for the 35 Ton Liquid Argon Test Abstract We propose to equip the 35 ton cryostat with one APA and two CPA’s, and all the necessary equipment such as support structure, field cage, feedthroughs, electronics, and high voltage system. A light detection system can and should also be incorporated. TPC proposal for the 35 ton LAr Cryostat1/10/12

Purpose The 35 ton test will be the first membrane style cryostat for ultra high purity liquid Argon containment. Once purity has been achieved, the cryostat presents an ideal test bed for the development of anode panel assemblies (APA’s) and cathode panels (CPA’s), along with High voltage cage and HV system Signal preamps, feedthroughs, and DAQ system Light detection The aim would be to complete the developments for the detector for the next stage, e.g. a 1 kton prototype, or a very large deployed detector TPC proposal for the 35 ton LAr Cryostat1/10/12

The 35 ton Cryostat TPC proposal for the 35 ton LAr Cryostat1/10/12 The first membrane-style cryostat filled with Liquid Argon will be installed at PC4 next year. It has an Argon Volume of size 2.7m x 4 m x 2.7m deep. It has an access hatch of size 1 m x 2.7 m (with rounded corners)

Requirements TPC proposal for the 35 ton LAr Cryostat1/10/12 List of Devices One APA, with cold electronics Two CPA’s Mechanical support structure Field cage around both drift gaps HV feedthrough (maybe two FT’s) HV system low voltage and bias voltage supplies low voltage and bias voltage feedthroughs Signal feedthrough DAQ Trigger system for cosmic rays Light detection system (Bars and PMT’s or SiPM’s) Light detection feedthroughs and external electronics

Desirable Features TPC proposal for the 35 ton LAr Cryostat1/10/12 It is important to design the test TPC system to be as close to the final system as possible. Use electronics items (preamps, cards, feedthroughs) that could, in principle, be used in the final detector Design the wire holding method and the many small parts the same way Design the APA and CPA frames nearly identical to the final ones, by: Designing the APA and CPA’s for full width (2.5 m) Shortening them to fit the cryostat. This has minimal effect of the design and the parts. Make it easy to install / remove the detector to test new designs as the effort advances

Challenges TPC proposal for the 35 ton LAr Cryostat1/10/12 The limited space is the main challenge. Solutions must be found for support installation, plane installation, field cage installation, cabling, and access during installation. There will be no penetrations to support the TPC. There is very little space above the cryostat.

Proposed Parameters TPC proposal for the 35 ton LAr Cryostat1/10/12 APA and CPA size 2.5 m wide x 2 m high Drift distance 1 m We plan to hang the planes from rails a la lbne design.

TPC support structure TPC proposal for the 35 ton LAr Cryostat1/10/12 We plan to hang the planes from rails a la lbne design. There will be three rails, one above the APA, and one above each of the two CPA’s. The rails will hang either from existing ceiling penetrations, Possibly using intermediary trusses, Or from cross trusses, supported by four columns located I the corners of the cryostat (see next picture). Both arrangements can work, but more detail work is needed.

TPC support Details TPC proposal for the 35 ton LAr Cryostat1/10/12 The structure consists of a 4” diameter stainless tube in each corner. Four stainless trusses run along the inside edges and are bolted to the corner columns. Two additional trusses span across to support the three rails that hold the APA and CPA’s trolleys. The structure is easy to bring in through the hatch, and easy to assemble inside the cryostat. The elements will be light weight and can be assembled by a few workers using ladders or scaffolding.

TPC proposal for the 35 ton LAr Cryostat1/10/12 Here is the Proposal

TPC proposal for the 35 ton LAr Cryostat1/10/12 Side View

Access for Installation TPC proposal for the 35 ton LAr Cryostat1/10/12 Installation, cable connections, and Electronics installation on the APA are done by technicians working in the drift volumes. This requires to get the field cage panels out of the way, And an easy way to re-position them when installation is done (see next picture). Small ladders are sufficient to reach the top of the APA. The cryostat ceiling is at 3.5 m, just 11.5 ft from the floor.

TPC proposal for the 35 ton LAr Cryostat1/10/12 Panel Installation

TPC proposal for the 35 ton LAr Cryostat1/10/12 Field Cage flip panels, as shown by Bo Yu: Note: For the small drift length (1 m) the panels can be routed from 1/16” thick Cu clad FR4

TPC proposal for the 35 ton LAr Cryostat1/10/12 Top View Showing CPA Panel Installation

TPC proposal for the 35 ton LAr Cryostat1/10/12 Top View Showing APA Panel Installation

TPC proposal for the 35 ton LAr Cryostat1/10/12 Conclusion It is not too early to start deigning the detector panels and infrastructure for this test. I hope the effort will focus the R&D toward a final design. Once the TPC system works, one can design and build the Lar1 Detector with confidence.