Synchrophasors: Improving Reliability & Situational Awareness

Slides:



Advertisements
Similar presentations
Advanced Energy Conference New York, NY October 31, 2012
Advertisements

Using Synchrophasors for Preventing Cascading Outages
OC Chair Items Don Watkins June 18-19, 2009 Operating Committee.
ISO New England Smart Grid Investment Grant Update David Bertagnolli – NASPI Working Group Meeting October 12-13,
Marianna Vaiman, V&R Energy
Idaho Power Update JSIS Meeting March 3, Infrastructure PMU installations: 24 PMU sites: 15 WISP PMU Installations: 5 WISP PMU sites: 3 WISP installations.
New Energy Horizons Opportunities and Challenges Update on IEEE PC Guide for Synchronization, Calibration, Testing, and Installation of Phasor Measurement.
Reliable Power Reliable Markets Reliable People Challenges and Opportunities in the Power Industry in Alberta CERI Conference October 22 & 23, 2007 Warren.
Washington DC October 2012 A Vision for an Advanced Supervision and Control System for the Electric Grid Ramón A. León XM S.A. E.S.P Colombia.
and Trend for Smart Grid
August 14, 2003 Blackout Final Report
1 1 Office of Science Lawrence Berkeley National Laboratory Distribution µ PMU Applications Joe Eto Emma Stewart
Introduction to Phasor Measurements Units (PMUs)
North American Synchrophasor Project Initiative NASPI Work Group Meeting Oct , 2011 Joseph H. Schaefer Florida Power & Light.
Duke Energy Carolinas Smart Grid Investment Grant Tim Bradberry Tim. NASPI Work Group Meeting October 12-13,
Smart Grid Projects Andrew Bui.
CAISO Update JSIS Meeting March, Infrastructure 92 Connected PMUs 64 Substations 7 PDCs reporting (BPA, PG&E, SCE, SDG&E, APS, SRP and NVP) Redundant.
American Transmission Company Smart Grid Investment Grant Update Jim Kleitsch NASPI Work Group Meeting October 12-13,
GridWise ® Architecture Council Cyber-Physical System Requirements for Transactive Energy Systems Shawn A. Chandler Maseeh College of Electrical and Computer.
Review of BPA Voltage Control Conference
ACTION PROPOSAL FOR FLYWHEEL ENERGY TECHNOLOGY Enhance future grid reliability, interoperability, & extreme event protection In 20 years, the flywheel.
I NTEGRATION OF S YNCHRO -P HASOR M EASUREMENTS IN P OWER S YSTEMS S TATE E STIMATION FOR E NHANCED P OWER S YSTEM R ELIABILITY Hassan Ghoudjehbaklou,
Texas Phasor Project ERCOT Reliability and Operations Subcommittee (ROS) February 12, 2009 Milt Holloway, Center for the Commercialization of Electric.
Academic Experience with Wide Area Sensors by Virgilio Centeno Virginia Tech PSC, Distributed Generation, Advanced Metering and Communications March 9,
1 Some Issues about Big Data in Power Grid Gary Quan.
PHAAUG – Peak Reliability
Synchrophasor Measurement Implementation in ERCOT
© 2011 New York Independent System Operator, Inc. All Rights Reserved. Smart Grid Investment Grant Project Update Jim McNierney Enterprise Architect New.
© New York Independent System Operator, Inc. All Rights Reserved. Michael Swider Manager – Research & Development New York Independent System.
Synchrophasor: Implementation,Testing & Operational Experience
Integrated Security Analysis Pete Sauer, PSERC – Illinois Kevin Tomsovic, PSERC – WSU Steve Widergren, PNNL January 27-29, 2004 Washington, D.C. Transmission.
University of Illinois Urbana-Champaign Information Trust Institute Presented by: Himanshu Khurana, University of Illinois ACM CCS 2009 Tutorial on Cyber.
VISUALIZATION WHY WE NEED SYNCHROPHASOR TECHNOLOGY IN OPERATIONS John Ballance – EPG Presented to ERCOT Phasor Technology Workshop – November 16, 2012.
11 PMU simulation and application for power system stability monitoring Harmeet Kang Areva Technology Centre – Stafford, UK Sept MOSCOW.
Page 0 Eastern Interconnection Phasor Demonstration Enhanced Wide-Area Visibility In the Eastern Interconnection for Reliability Management Transmission.
Wide area SPS for Integrating SR with national grid Approach Document prepared by.
V&R Energy’s Project under PRSP: Grid Operator’s Monitoring & Control Assistant (GOMCA) Marianna Vaiman, V&R Energy JSIS Meeting.
Phasor Measurement Units
1 Application of Synchrophasor Technology To CREZ System CREZ Technical Conference January 26, 2010 Navin Bhatt American Electric Power.
Frankfurt (Germany), 6-9 June 2011 Smart Grid Protection in China Wu Guopei Guangzhou Power Supply Bureau Guangdong Power Grid, China.
Eastern Interconnection Phasor Project Modernizing North America’s Electric Grid Enhanced Wide-Area Visibility In the Eastern Interconnection for Reliability.
SMS Update NERC Synchronized Measurement Subcommittee (SMS) Ryan D. Quint, Ph.D., P.E. Staff Coordinator, NERC SMS, SAMS WECC JSIS Meeting September 22,
CASE STUDY Disturbance event comparing PMU and SE voltage angle difference in ERCOT Prakash Shrestha Operations Engineer Advanced Network Application.
Application and Implementation of State Estimator at Idaho Power Company S. Kincic and M. Papic.
Overview of Real Time Grid Reliability Management Carl Imhoff Pacific Northwest National Laboratory January 27-29, 2004 Washington, D.C. Transmission Reliability.
Doc.: IEEE /0121r1 Submission January 2010 Craig Rodine, Electric Power Research InstituteSlide 1 Some High-Level Smart Grid Requirements Date:
Real Time Tools Outreach Carlos Martinez January 27-29, 2004 Washington, D.C. Transmission Reliability Research Review.
Power Association of Northern California Maintaining Grid Reliability In An Uncertain Era May 16, 2011 PG&E Conference Center Jim Mcintosh Director, Executive.
Congestion FTR’s ISO Charges Congestion FTR’s ISO Charges Performance Monitoring is Essential for Harmonizing Reliability and Markets Distributed Generation.
Grid Reliability Metrics by Jim Dyer Electric Power Group, LLC January 29, 2004 Washington, DC Transmission Reliability Research Review.
PJM Interconnection Smart Grid Investment Grant Update
ROSE Updates Marianna Vaiman, V&R Energy WECC JSIS Meeting Salt Lake City, UT September 9 – 10, 2014 Copyright © V&R Energy.
Oncor Transmission Service Provider Kenneth A. Donohoo Director – System Planning, Distribution and Transmission Oncor Electric Delivery Co LLC
Imagination at work. Paddy McNabb Senior Engineer January 2016 Grid Stability Applications Wide Area Monitoring System.
Smart Grid Vision: Vision for a Holistic Power Supply and Delivery Chain Stephen Lee Senior Technical Executive Power Delivery & Utilization November 2008.
Synchrophasor Network & Renewable Integration Developments STEVE WIDERGREN Energy & Environment Directorate Richland, WA.
SEMINAR PRESENATATION ON WIDEAREA BLACKOUT (AN ELECTRICAL DISASTER) BY:Madhusmita Mohanty Electrical Engineering 7TH Semester Regd No
Sensing and Measurements Tom King Oak Ridge National Laboratory April 2016.
PS ERC EC Meeting Systems Stem New Research Initiatives.
Discovery Across Texas: Technology Solutions for Wind Integration in ERCOT Using Synchrophasor Technology for Wind Integration and Event Monitoring in.
MISO – Synchrophasor GPA Users Forum Sept 7th, 2011.
2017 WECC JSIS Report March 21, 2017.
ISO-NE Synchrophasor Related Projects
Authors : P. Mukhopadhyay, Abhimanyu Gartia, Samit Kumar Saha,
ISO New England System R&D Needs
Peak’s Synchronized Measurements and Advanced Real-time Tools (SMART) Working Group (initiated in Oct-2017) Focus on operationalizing Synchrophasor tools.
NASPI PMU Data Application Classification
2017 WECC JSIS Report March 21, 2017.
WISP Follow on Reporting.
NASPI PMU Data Application Classification
Presentation transcript:

Synchrophasors: Improving Reliability & Situational Awareness October 12, 2011 Research & Technology Management Clifton Black

Outline What are PMUs? PMUs - Concept & Operation The Need for PMUs Synchrophasor Applications Southern Company PMU Activities PMUs Activities in North America

What are PMUs? PMUs provide high resolution synchronized measurements of phasor voltages and currents They are placed at key locations like power plants and major substations

Concept & Operation Phasors Phase Angles have a reference

Concept & Operation contd. ATTRIBUTE SCADA PHASOR Measurement Analog Digital Resolution 2-4 sam./sec. 60 sam./sec. Observability Steady State Transient Phase angle No Yes Measured |V|, MW, MVAR |V|,δ, MW, MVAR, |δ2 – δ1| Synchronized

Concept & Operation contd. Time Synchronization Time-skewed measurements introduce errors Average Angle Difference ~ 10º Average Angle Difference ~ 5º

The Need for PMUs Investigation of August 14, 2003 Blackout revealed Lack of Wide Area Visibility Lack of Time Synchronized Data Inability to Monitor System Dynamic Behavior in Real-time

The Need for PMUs Contd. Wide-Area and Sub-SCADA Visibility Time Synchronization allows Dynamics not visible in SCADA Angular or Dynamic warning signs are usually present before major events Recent Major Blackouts August 14th Angular Separation 12 Degrees 25 Degrees 45 Degrees 115 Degrees

The Need for PMUs Contd. Post Disturbance Analysis of August 10, 1996 Blackout PMUs allow us to‘see’ the dynamic behavior of the grid which models sometimes incorrectly predict.

Synchrophasor Applications Synchrophasors facilitates improvement in Situational Awareness, Modeling Accuracy & System Reliability Real-time Applications Off-line Applications Wide-Area Visualization & Monitoring Frequency Stability Monitoring & Trending Voltage Monitoring & Trending State Estimation Oscillation Monitoring Resource Integration Equipment Failure Detection Power System Model Verification Event Analysis & Reconstruction Equipment Failure Detection Fault Location Baselining Power System Performance Load Characterization

Synchrophasor Applications contd. A Few of the Current Implementations CAISO, BPA, AEP incorporating phasor data into State Estimation tools Entergy used phasor data to manage system separation, islanding and restoration during Gustav (2008) CAISO & ERCOT will be using phasor data to monitor and integrate intermittent generation SCE using phasor data for automated control of SVC for reactive power support Phasor systems being used for WAMS in North America, Quebec, Brazil, China and Europe

Southern Company PMU Locations South Hall Plant Bowen Plant Miller Norcross West McIntosh Plant Farley Plant Hatch Thallman Plant Barry Plant Daniel

Southern Company’s PMU Architecture Local PDC and Historian facilitates flexibility, security and data accessibility HATCH Vgθg Veθe Vdθd Vbθb Viθi DANIEL SOUTH HALL BOWEN MILLER Phasor Data Concentrator (PDC) - Local Regional PDC Vfθf NORCROSS Vcθc BARRY Vaθa FARLEY THALMANN Vjθj WEST MCINTOSH Vhθh Local Historian Local Applications

Current Use of PMU data Post Event Analysis & Model Validation – Transmission Planning Wide Area Monitoring and Situational Awareness – Research

Example of Wide-area Monitoring Tool Real-time Dynamics Monitoring System (RTDMS) GAUGES: Quantify the worst performing metric LOCATION INDICATORS: Provide information about specific locations w.r.t. the metric TRAFFIC LIGHTS: Provide status of specific metrics across all locations

Synchrophasor Research Project with PNNL: Multi-Variable Statistical Analysis – Identifying atypical events and precursors to proactively manage the grid AREVA PMU Project: Impact of PMU data on State Estimation & State Estimation Metrics NEETRAC Project: Next Generation PMUs/Evaluation CEATI: Prediction of Power System Instability based on PMU data: Utilizing the Region of Stability Existence (ROSE) Approach. Provide Operators with fast and accurate solutions in order to predict system instability and prevent wide-spread blackouts using PMU data.

Demonstration Project w/ GaTech Distributed State Estimator, Generator Parameter Estimation and Stability Monitoring Distributed State Estimator for two substation subsystem Develop Generator parameter Estimator for a generating unit Develop transient stability monitoring system for generating plant

PMUs in North America

PMU Activities in North America North American Synchrophasor Initiative (NASPI) www.naspi.org SPDC evolving to regional PDCs PhasorGateway – Communications & Traffic Management Infrastructure Tremendous boost from ARRA funding NASPI Structure

Recommended Industry Deployment Roadmap Where Are We Going? 1. Angle/Freq. Monitoring 12. Post-mortem Analysis 2. Voltage Stability Monitoring 5. State Estimation (Improv.) 13. Model Benchmarking; Parameter Estimation 16. DG/IPP Applications 11. Power system restoration 10. Congestion management 14. Model Benchmarking; Parameter Estimation 15. Planned Power System Separation 6. State Estimation (Boundary Conditions) 7. State Measurement (linear) 4. Real-Time Control 9. Adaptive Protection 8. WA Stabilization (WA-PSS) Necessary Additional Benefits More Investigation Role of PMUs 1-3 Years 3-5 Years > 5 Years Recommended Industry Deployment Roadmap 3. Thermal Overload Monitoring CIEE Report

SGIG PMU Projects Project Lead # of PMU (Stations) Key Applications ISO New England 30 Real-time situational awareness, Congestion management New York ISO 39 Real-time situational awareness, Voltage monitoring and control Communications system PJM Interconnection 80+ Real-time situational awareness including trending, Oscillation detection, Islanding detection Midwest ISO 150+ Real-time situational awareness, Voltage monitoring Renewable integration, Congestion management, State estimation, Oscillation monitoring, EMS alarms Western Electric Coordinating Council 250+ Wide-area real-time situational awareness and visualization, Alarming, Oscillation monitoring, Voltage monitoring, Renewable integration, Congestion management, Automatic controls, Power system performance analysis, System-wide model validation, Post-event analysis Entergy Services 18 Increase grid monitoring, train and educate grid operators and engineers on phasor technology Duke Energy 102 Wide-area real-time situational awareness, enhanced state estimator and Renewables integration

What Do We Need Now? Demarcation where currents tools end and PMU tools begin Development and Deployment of Applications Practical tools for Operators Actionable Information ‘Killer Apps’ Knowledge/Experience from SGIG implementations More Research

Questions