CARMA Fiber Plan Ed Fields Dick Plambeck 09 Sep 2004.

Slides:



Advertisements
Similar presentations
Fiber Optic Construction & Termination Jeff Hite University of Oregon/NSRC This document is a result of work by the Network Startup Resource.
Advertisements

Structured Network Cabling CIS 399 Day 1, Morning Session 2 Dale Smith University of Oregon & NSRC
SWEDE – 2013 UNDERGROUND CONDUIT CenterPoint ® Energy.
7.1 Chapter 7 Transmission Media Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display.
Презентація за розділом “Гумористичні твори”
Центр атестації педагогічних працівників 2014
Галактики і квазари.
Характеристика ІНДІЇ.
Процюк Н.В. вчитель початкових класів Боярської ЗОШ І – ІІІ ст №4
EVLA Fiber Selection Critical Design Review December 5, 2001.
How to Build a CAN Last Update Copyright Kenneth M. Chipps PhD 1.
Fiber Infrastructure Revitalization SUNY Oswego’s case study for the future of your information infrastructure 6/15/05. Timothy J Kraft RCDD, CCNA,NNDE.
INSTALL THE TRANSMISSION LINE By Mohd Nasir bin Said.
SJD/JJAdvisory - Sept Fiber Phase Stability Status Steven Durand & Jim Jackson September 8, 2003 National Radio Astronomy Observatory a facility.
SJD/TAB1 EVLA Fiber Selection Critical Design Review December 5, 2001.
L BAND HELIX ANTENNA ARRAY
Chapter 7 Transmission Media Guided Media Unguided Media WCB/McGraw-Hill  The McGraw-Hill Companies, Inc., 1998.
Campus Network Best Practices: Structured Cabling Dale Smith University of Oregon/NSRC This document is a result of work by the Network.
Campus Network Best Practices: Structured Cabling Dale Smith Network Startup Resource Center This document is a result of work by the Network.
Campus Network Best Practices: Structured Cabling Dale Smith University of Oregon/NSRC This document is a result of work by the Network.
1 Direct burial cable, up to 24 individual fibers, reinforced.
Духовні символи Голосіївського району
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
Typical Micro-Hydro Schematic Three phase motor wired for /240. Actual voltage will depend on battery state of charge and transformer ratio, ~ 167.
Status of TRD Pre-trigger System K. Oyama, T. Krawutschke, A. Rausch, J. Stachel, P. von Walter, R. Schicker and M. Stockmeier for the T0, V0, and TRD.
Outside Plant Fiber Optics
Part II. Physical Layer and Media Chapter 7. Transmission Media COMP 3270 Computer Networks Computing Science Thompson Rivers University.
7.1 Chapter 7 Transmission Media Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display.
Optical performance measurements of various fibre connections
Fiber Overview CIBET, 2016 Mike Watson.
IDEAAIDEAA Integrated Distribution Enabling Access Apparatus.
Electricity is produced at the power station.
Visit for more Learning Resources
Preparatory Measurement
Chapter 7 Transmission Media
Optical Fiber Communication
Chapter 7 Transmission Media
Bluffdale City Emergency Communications
Chapter 7 Transmission Media
بسم الله الرحمن الرحيم الموضوع:الوضوء صفته وفرائضه وسننه
Chapter 7 Transmission Media
Round Trip Phase Measurement System
Chapter 7 Transmission Media
Chapter 7 Transmission Media
مديريت موثر جلسات Running a Meeting that Works
Проф. д-р Васил Цанов, Институт за икономически изследвания при БАН
ЗУТ ПРОЕКТ на Закон за изменение и допълнение на ЗУТ
О Б Щ И Н А С И Л И С Т Р А П р о е к т Б ю д ж е т г.
Електронни услуги на НАП
Боряна Георгиева – директор на
РАЙОНЕН СЪД - БУРГАС РАБОТНА СРЕЩА СЪС СЪДЕБНИТЕ ЗАСЕДАТЕЛИ ПРИ РАЙОНЕН СЪД – БУРГАС 21 ОКТОМВРИ 2016 г.
Сътрудничество между полицията и другите специалисти в България
Съобщение Ръководството на НУ “Христо Ботев“ – гр. Елин Пелин
НАЦИОНАЛНА АГЕНЦИЯ ЗА ПРИХОДИТЕ
ДОБРОВОЛЕН РЕЗЕРВ НА ВЪОРЪЖЕНИТЕ СИЛИ НА РЕПУБЛИКА БЪЛГАРИЯ
Съвременни софтуерни решения
ПО ПЧЕЛАРСТВО ЗА ТРИГОДИШНИЯ
от проучване на общественото мнение,
Васил Големански Ноември, 2006
Програма за развитие на селските райони
ОПЕРАТИВНА ПРОГРАМА “АДМИНИСТРАТИВЕН КАПАЦИТЕТ”
БАЛИСТИКА НА ТЯЛО ПРИ СВОБОДНО ПАДАНЕ В ЗЕМНАТА АТМОСФЕРА
МЕДИЦИНСКИ УНИВЕРСИТЕТ – ПЛЕВЕН
Стратегия за развитие на клъстера 2015
Моето наследствено призвание
Правна кантора “Джингов, Гугински, Кючуков & Величков”
Безопасност на движението
Chapter 7 Transmission Media
Permission to copy for class and home.
Transmission Media Located below the physical layer and are directly controlled by the physical layer Belong to layer zero Metallic Media i.e. Twisted.
Presentation transcript:

CARMA Fiber Plan Ed Fields Dick Plambeck 09 Sep 2004

basic specifications 12 connectorized fibers from control building to each antenna (8 used, 4 spare) for C,D,E arrays, each cable is ‘home run’ from antenna to control building fibers: Corning SMF-28 or equivalent –single mode –zero dispersion point at 1310 nm connectors: FC/APC (angle polished) cables: gel-filled, loose tube design

underground fiber: Corning Altos LST

antenna fiber this.... not this

trenching plan

MaxCell innerduct – 9 cables in one 4-inch conduit

antenna pad vault

fiber shoebox

large vault near control building

large vault locations

fiber management racks - schematic

fiber management racks – ADC proposal