Loudoun Water’s Potomac Water Supply Program RWT - Pre-Bid Meeting December 18, 2013.

Slides:



Advertisements
Similar presentations
Construction Contracting
Advertisements

GEORGETOWN COUNTY STORMWATER DIVISION Breakfast Series #3 How to Prepare a Stormwater Pollution Prevention Plan January 14, 2009.
Field Orders on Construction Contracts Guidance Document CLC-8 May 13, 2013.
Presentation by: Tshewang Gyeltshen. The SBD is prepared in line with the PRR 2009 & SBD Large Works General principals of procurement to be applied prescribed.
11 Grant Park Sewer Rehabilitation Project BES Project #E10346 Bid # SCOPE: Rehabilitation, Replacement, or Relocation of Sanitary & Combined Sewers,
GPA Renewable Energy Resource for Guam Power Authority
Bidding Requirements ACT 380. Objective Provide an overview of the bidding process, including documents included in the bidding requirements.
Public Information Meeting #6 City of Fargo Flood Risk Reduction Projects Rose Creek Coulee October 9, 2012.
Loudoun Water’s Potomac Water Supply Program RWI/PRWPS- Request for Qualifications Pre-submittal Conference– July 9, 2013.
Community Facility Loans/Grants Architect Flow Chart Owner has need for project. RD Area Office is contacted. RD visits project site and discusses project.
Sterling Blvd Water Main Phase 2 IFB# WTR Pre-Bid Conference May 12, 2015.
ESTIMATING By Laith Jacob.
PROCEDURES FOR SELECTING THE CONTRACTOR
1 Purchasing and Procurement Processes Module Four Revision Date: 2/06/2015.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Route 110 over Route 27 Design-Build Project (PIN , D900027) Town of Babylon, Suffolk County Request.
Work Plan Development Steve Robinson Highway Utility Engineer, INDOT June 11, 2015.
LPA – Utility Coordination Natalie Parks StructurePoint November 20, 2013.
Construction Contract Documents
What Are Construction Documents Construction documents serve as a means of obtaining bids from contractors and are used by contractors to obtain price.
Acquisition of Flood Control Easements Triangle High-Ground Area City of West Sacramento, Yolo Co. Meeting of the Central Valley Flood Protection Board.
Construction: Legal Issues. Legal Issues In the Bidding Process Timing of various activities has legal implications. During the bidding process: –A bid.
Module 7: Construction Phase
Cargo Dock 16: Pre-Bid Meeting Presentation June 13, 2013.
YUSUF OZ FATIH BOLUKBAS HUSEYIN ANIL KARABULUT. A contract is a legally binding agreement between two or more parties.
LCWDBoardMtg_ pptx/1 LCWD Board Meeting January 14, Carneros Avenue, Napa Los Carneros Water District.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Regions 2 & 9 Design-Build Project (PIN , D900022) Herkimer,
5.1.9 Student Book © 2005 Propane Education & Research CouncilPage Installing Propane Dispensers Successful propane dispenser installations are.
10/22/20151 NCTCOG Sustainable Development Call for Projects Interlocal Cooperative Agreement Reporting Form Reimbursement Phase 1: PS&E and.
Chapter 2 Introduction to Construction Procedures
CONSTRUCTION CONTRACTS DOCUEMENTS
Construction Materials and Workmanship. All workmanship, materials, equipment, and articles incorporated into the work are to be of the best available.
1 BROOKHAVEN SCIENCE ASSOCIATES CHILLED WATER & COMPR. AIR PIPING Thomas F. Joos, P.E. Lead Civil/Structural Engineer CFAC Review November 9-10, 2009.
IDM Chapter 104 Utility Coordination Gail Lee Utility and Railroad Engineer, INDOT June 10, 2015.
VI. Developing a VSMP Program General Stormwater Training Workshop.
Chapter 37 Pipeline Construction. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Explain the.
Conditions of the Contract ACT Objective To provide an overview of the Conditions of the Contract, their purpose, content, and relationship to.
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
Highway Utility Engineer, INDOT
Park Lane ZOM Location Map. Park Lane ZOM Aerial.
Washington Metropolitan Area Transit Authority (WMATA) FQ15237 SIX (6) TIE BREAKER STATIONS UPGRADE ORANGE AND BLUE LINES VA, DC AND MD Pre-Bid Conference.
General Tab Project, Cost Schedule, and Work Limits Roadway Character
Former DuPont Barksdale Works Project Update July 14, 2004 DuPont Corporate Remediation Group Great Lakes Visitors Center.
MIDDLE PLANTATION KEY WASTEWATER COLLECTION AND TRANSMISSION SYSTEM Village of Islands, Islamorada Residential Grinder Pump Program Pre-Construction Meeting.
Richland Creek Water Supply Program Contract for WTP and Pump Stations CMAR Services and Program Update Paulding County, Georgia Board of Commission Work.
Richland Creek Water Supply Program Contract for Reservoir, Pump Stations, and WTP Final Design Services Paulding County, Georgia Water and Sewer Advisory.
Civil Engineering Surveying Roy Frank. Basic Route Survey and Design 1.Concept for Route 2.Reconnaissance Study 1.Small scale mapping of region (1”-500’
Governor’s Office of Emergency Services 1 The Governor’s Office of Emergency Services Application and Benefit Cost Analysis (BCA) Training.
Dallas Area Rapid Transit Pre-Bid Conference Solicitation No. B Bus stop Amenity Cleaning April 13, 2016.
San Francisco Public Utilities Commission Water System Improvement Program Bay Division Pipeline Project July 14, 2009.
Richland Creek Water Supply Program Update Paulding County, Georgia Board of Commissioners Work Session March 08, 2016.
USAID Afghanistan Engineering Support Program (ESP) Pre-Bid Meeting July 14, 2015.
Dallas Area Rapid Transit Pre-Bid Conference Solicitation No. B Inspection, Testing, and Maintenance of Fire Protection and Life Safety Systems.
Gloucester Parkway Entrance Enhancements IFB# RAR Pre-Bid Conference & Site Visit August 16, 2016.
CONGAMOND ROAD ROADWAY IMPROVEMENT INFORMATIONAL MEETING
Commercial Contracts: An In-Depth Look
Traffic Control Plan Development Course
Washington Metropolitan Area Transit Authority (WMATA)
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
Designers’ Manual Overview and Chapter Contents
Designers’ Manual Appendix Contents
Pinole-Hercules Water Pollution Control Plant Upgrade Project
City of New Bedford HOUSING REHABILITATION DEPARTMENT OF PLANNING,
Georgetown county water and sewer district
AX7665D82 Areawide Total Maximum Daily Load (TMDL) Design-Build
Washington Metropolitan Area Transit Authority (WMATA)
Site Plan Requirements
General Tab Project, Cost Schedule, and Work Limits Roadway Character
URBAN TRAIL PROJECT UPDATES
Village of Naples New Sanitary Sewer System Final System Layout
Richland Creek Water Supply Program Program Update
Presentation transcript:

Loudoun Water’s Potomac Water Supply Program RWT - Pre-Bid Meeting December 18, 2013

 Introduction  Bidding Overview  Bid Documents, Supplementary Conditions, Permits, Bid Form  Overview- RWT Design  RWT Main, North and South Alignments, Site Conditions & Geotechnical, Quarry Bypass Vault, DVP Easements, Cathodic Protection  Questions/Answer Period  Close AGENDA Statements made or material presented at Pre-Bid Conference shall not modify or amend the Contract Documents. Any amendments shall only be by written Addenda.

DATES SIGN IN SHEET QUESTIONS DURING BID PROCESS ADDENDUM INTRODUCTORY REMARKS

The Potomac Water Supply Map

January /February 2014 RWI/RWPS NTP Anticipated Program Construction Schedule Mid-year 2016 RWI/RWPS Substantial Completion March/April 2014 WTP NTP December 2015 RWT Substantial Completion Phase 1 April 2017 Final Completion All Program Elements, Including Phase 1/2 of RWT May 2014 RWT NTP

Bidding Overview

Bidding Overview - Highlights Bidding Documents Supplementary Conditions Working Hours – Articles 6.02.B and A Exhibits A, B, C, and F Securing final easements – reference paragraph 4.05 of Instructions to Bidders for information on Site Inspections ESA Phase 1 pertains to removal of shed on Starland, parcel , Drawing sheet T-I-C43

Bidding Overview – Highlights Permits/Approvals Obtained Permits/Approvals in Agency Review  Columbia Gas – final approval will be secured prior to NTP  DTI – by addendum will add DTI Encroachment and Construction Guidelines that are referenced in approval letter within Exhibit C – final approval will be secured prior to NTP  JPA Minor Modification – related specification will be provided with first addendum  VDH – permit will be combined into one for all three Program Elements  DVP  NVRPA  DEQ/VSMP – VAR 10 & SWPPP  JPA – Major Modification Executed Agreements and associated exhibits will be provided by addenda. SWPPP will be available at Pre-Construction Meeting *Contractor to obtain VDOT and Grading Permit and all other required construction permits per Article 6.08.A of the Supplementary Conditions

Bid Form Encourage development of Bid for Welded Steel and DIP Submit only lowest Bid Complete all blanks, including Contingent Contract Items Contingent Contract Items Reduction in Estimated Quantities Phase 1 and Phase 2 Work Or Equal and Substitutions, Article 11, Section 00200, Instructions to Bidders Bid = Sum of Items Submit Bid Form, Bid Bond, Proof of Pre-Qualification Bidding Overview - Highlights

RWT Design Overview

Raw Water Transmission (RWT) Main Overview  Slide shows overview  Detailed description is provided within the Project Manual and the Contract Drawings  Overall Work includes a North and South Alignment  Staging Areas provided throughout and shown on Contract Drawings Potomac River QBV PRWPS (By Others) WTP Quarry ‘A’ QARWPS (By Others) RWT ContractInterfacePoint ContractInterfacePoint

 Mostly Residential  All Trenchless Crossings Occur in This Section  DVP Easement / High- Tension Lines  DVP Tower Foundation Protection  Town of Leesburg Force Main Protection  VDOT Coordination at Riverside Pkwy & River Creek Pkwy  No Blasting from Route 7 and North to Potomac River North Alignment Potomac River NorthAlignment SouthAlignment QBV PRWPS WTP Quarry ‘A’ QARWPS(Future)

Construction in and around DVP Easements

North Alignment Potomac River NorthAlignment SouthAlignment QBV PRWPS WTP Quarry ‘A’ QARWPS(Future)  Groundwater at Tuscarora Creek and Sycolin Creek Trenchless Crossings  Transitions from 42” to 48” Diameter Pipe  Two Tees for Future Quarry Connection  W&OD Trail and Luck Stone Berm  Construction Limits: 40 to 50 Feet (Most Areas)  Multiple Staging Areas

 Approximately 32’ x 18’ x 11’ (Deep) inside (See T-1-M1 & M2)  Top of Structure Buried  Valves  5 Butterfly Valves  1 Check Valve  Pre-Blasting of Future Vault Quarry By-Pass Vault Potomac River NorthAlignment SouthAlignment QBV PRWPS WTP Quarry ‘A’ QARWPS(Future)

Quarry Bypass Vault

 Extensive Clearing Required  Rock Blasting Expected (Submit Blasting Plan Prior to Blasting)  Parallel Trench Throughout  Provide Pre-Blasting for Future Pipeline  Submit Blasting Plan  Access Road Re-Grading for Cross-Slope  Multiple Double-Barrel Culverts  Temporary Access Roads  Quarry ‘A’ Tunnel Construction may be ongoing by Luck Stone South Alignment Potomac River NorthAlignment SouthAlignment QBV PRWPS WTP Quarry ‘A’ QARWPS(Future)

South Alignment Potomac River NorthAlignment SouthAlignment QBV PRWPS WTP Quarry ‘A’ QARWPS(Future)  Goose Creek Conservation Easement  50-Foot Set-back Requirement (Zoning)  Limits of Construction: 50 Feet Wide Throughout  Multiple Pipe Staging Areas  MSHA and DMM certification for all staff working on Luck Stone Property

Geotechnical Baseline Report – Provides further details on 12 Trenchless Crossings Geotechnical Data Report – not part of Contract Documents but available for review Phase 1 ESA for Starland LLC pole-barn to be demolished (see Supplementary Conditions, Attachment F and Specification Section 02110) Site Conditions and Geotechnical

 All Piping (DIP or WSP)  Exterior Bonded Coating Required  Magnesium and Zinc Ribbon Anodes  Thermite Welds  Isolation Flanges  Test Stations  AC Isolation Mats  Insulated Casing Spacers  Casing End Seals  Isolation Flanges  Special Requirements for Colonial Gas Mains (see Detail CC-7, Drawing T-1-E11)  NACE Certified Cathodic Protection and Corrosion Specialists Required of Contractor (See Specification Section 16640) Cathodic Protection System

 See Drawing Sheets T-1-C40 thru T-1-C44  Multiple Access Points shown  South end Access shown here (from Drawing T-1-C44) Construction Access Routes

 See Specification Section for 70’x145’ Area Contractor’s Trailer / Parking Area

Partnering Sessions per Section to promote an open, communicative relationship. Coordination with other Contractors on other Program Elements (RWI, PRWPS, WTP, SCADA) as well as at Luck Stone Other Limitations and Constraints per Specification Section and as elsewhere indicated Training provided on Owner’s Construction Management Software System (CMSS, e-Builder)--See Specification Section Functional and Performance Testing per Specification Section (2 Phases) Other Noteworthy Items

Presentation of the latest renderings Questions?