PLM The View From a Project House.

Slides:



Advertisements
Similar presentations
Introduction When it comes to export oriented buying houses that outsource their production works, they need to maintain transparency across their stake.
Advertisements

© 2012 Autodesk BOMs in the Cloud with Autodesk PLM 360 (PL2818)PL2818 Hagay Dvir Product Manager.
Engineering Data Management with SharePoint 07/16/2014 Edwin Elmendorp – Cadac Group.
IMPLEMENTATION KICK-OFF.  Perry’s Introduction  Project Director  Stacy Garton  Executive Team  Sandy  Jason  Bill  David.
2 SS 14SS 14 CONTENTS Introduction Product Data management CATIA team PDM CATIA Integration SmarTeam File Management Customization Tools Advantages and.
Unrestricted © Siemens AG All rights reserved. The Digital Factory – Enabling a Holistic Approach to Automation MIT Industrial IoT Workshop – October.
1 Management of Ideas Barbara Schütz Arbeitsmarktservice Österreich Organisational development and staff training.
T-FLEX DOCs PLM, Document and Workflow Management.
#4502 – Streamlining the Physical Inventory Process Using a Custom Solution.
Lesson 10 IT Project & Program Management.
1 Autodesk’s Manufacturing Solutions Kvalitetssikring i engineering processen Mads Storgaard.
What is a project? Project Management Institute definition
Product Lifecycle Management (PLM) Organisational Strategy –Need for structural change –IT tools –Increased integration (rather than “point solutions”)
Measuring Success ROI Tools. Everyone wants to be successful….. but measuring success can be challenging.
By Lewis Stalbird.  “The process of managing the entire lifecycle of a product from its conception, through design and manufacture, to service and disposal.”
Lean Manufacturing Case Study Prototype Design-Build.
© Siemens Product Lifecycle Management Software Inc. All rights reserved Siemens PLM Software Solid Edge ST4 Training Revising assemblies.
Product Life Cycle Management Innovation to Execution
SEM A - Operations PE - Utilize project-management skills to improve workflow and minimize costs. PI - Develop a Project Plan.
Charles Sterling Senior Program Manager Tools for integrating testers into a DevOps world.
AppVision © Integrated approach to system management Building automation Energy Management Security ManagementProcess Management (SCADA) AppVision.
© 2008 Eventure Events. All rights reserved. Risk Assessment and Management of MRO Inventory Shane McLellan Project Leader – Business Performance & Planning.
By A + B Solutions and LC Consulting Services ®. How to Integrate Production in to T EAMCENTER by LC Consulting Services 8 Denison Parkway East Corning,
CRM- The Systems House, Inc. 1 CRM Relationship Development MDS Sales Management Tools.
Workflow and SharePoint Presented by Ben Geers. Overview What is workflow? Windows Workflow Foundation How does workflow apply to SharePoint? WSS v3 vs.
Instructions 1. Pick and choose the parts of the presentation that seems relevant to you. 2. Fill in the missing pieces by adding your own logos, company.
More Successful eLearning Implementations. The eLearning Guild elearningguild.com The eLearning Guild is a Community of Practice for e-Learning design,
©2011 Quest Software, Inc. All rights reserved. Patrick Hunter EMEA IDAM Team Lead 7 th February 2012 Creating simple, effective and lasting IDAM solutions.
What every Change Analyst should know - our experience with Agile PLM.
1 Project Management Introduction. 2 Chap 1 What is the impact? 1994: 16% of IT projects completed “On-Time” 2004 : 29% of IT projects “On- Time” 53%
The career development of a Web officer Notes from the workshop at UKOLN on 11 October 2000 Peter Griffiths’ syndicate.
Virtual SharePoint Summit 2010 hosted by Rackspace Creating an HR Site In SharePoint Virtual SharePoint Summit 2010 hosted by Rackspace.
Starting Comparing different projects that need to be done in the company Make project selection: Coding Performance Improvement Project.
Bridging the Gap to Support Our Workforce Goals Tim Worley Executive Director, Cal-Nevada AWWA.
© 2012 Autodesk PL2731 Get the foundations right before you start building Adam Peter Customer Success Engineer - Autodesk.
SCAPE Rainer Schmidt SCAPE Training Event September 16 th – 17 th, 2013 The British Library Building Scalable Environments Technologies and SCAPE Platform.
Devon M. Simmonds SERP’08, July-14-17, Las Vegas 1 Aspect-oriented Approaches to Model Driven Engineering Devon M. Simmonds Computer Science Department.
Strictly Business Using “StrictlyFused” to Create an Extensible Knowledge Portal.
Purpose To develop and deploy a Metro Bus Tracking System (MBTS) Two main goals: – Provide the metro administration a tool to track and report on the status.
© 2012 Autodesk Rolling Your Own: Building Apps in Autodesk® PLM 360 Joseph Piggee Trung Nguyen.
Global E-Business: How Businesses Use Information Systems.
Erin Glenn, President Kevin Guyer, Vice President 
Click to edit Master title style Click to edit Master text styles –Second level Third level –Fourth level »Fifth level 1 CustomerSoft ESP Contact Operations.
Motivation Section 5 Why are people motivated to do those things? VIDEOVIDEO.
Mccs Applied Computing Project II WEBdesk Helpdesk System Project Team : D.I.K.
ArcGIS Workflow Manager: Integrating Geoprocessing into Your Business Processes Nishi Mishra.
Why BS 1192:2007? It’s the British Standard and code of practice for “Collaborative production of architectural, engineering and construction information”.
PLM-documentation management plans & status Henrik Lindblad Group Leader PLM & Process support Oct 16, 2014.
© Cloud Security Alliance, 2015 March 2, Agenda © Cloud Security Alliance, 2015 The SecaaS Working Group Recent Activity Charter Category outline/templates.
Design Studies Portfolio Royce Furgeson. Design 10 – Cabin Project.
INTEGRATED BUSINESS MANAGEMENT SYSTEMS AUTOMATING THE VALUE CHAIN FOR SMALL BUSINESSES.
The reading is 7.38 mm. The reading is 7.72 mm.
PLM, Document and Workflow Management
Copyright Scott Bloss, All rights reserved.
PL6164 Analyze That - Vault Reporting and Monitoring

Tips Need to Consider When Organizing a College Event
Using IT for Coordination and Control
PLM Workshop Facilitator: Dr. Peter A Storti
کـورس ارتـباط کارکـنان
إدارة المشروعات.
در تجزیه و تحلیل شغل باید به 3 سوال اساسی پاسخ دهیم Job analysis تعریف کارشکافی، مطالعه و ثبت جنبه های مشخص و اساسی هر یک از مشاغل عبارتست از مراحلی.
ماجستير إدارة المعارض من بريطانيا
Self Awareness: WHO AM I?
Unsystematic Risk It is unique and peculiar to a firm or industry.
Diversity What is it? Why does it matter? Managing diversity
Benchmarking Topic Best Practices Executive Roundtable Presentation
T-FLEX DOCs PLM, Document and Workflow Management.
2 Recordkeeping and Reporting
Presentation transcript:

PLM The View From a Project House

We are Unique (just like everyone else) Project Size - $1,000 to $4.9MM Project Duration – 2 days to 3.5 years Serial Number 2 is the rare event Lifecycle of Product – 3 years to 25 years 41 Employees executing 155 projects a year

Our Challenges Right Sizing the Tool to the Project Maintaining the Ability to Maintain Loss of Revision Control Through Customer Modifications Integrating PM with PLM (convergence of data) Accessing obsolete data with obsolete tools

Our Tools Intranet Integrated Job Costing System AutoCAD Electrical, Inventor and Vault Custom Workflows Virtualization

Job Progress BOM Material Status Time Charged