Timber Research Centre Michael Anderson– Mohamed Farid Pablo Prallong – Lewis Macleod Ross Turbet 16394 & 16469 Group A 26/04/20054 th Presentation.

Slides:



Advertisements
Similar presentations
Load Management System with Intermittent Power on the Grid Ruth Kemsley CEng MIMechE MIEE Econnect Ventures Ltd.
Advertisements

Demand Response: The Challenges of Integration in a Total Resource Plan Demand Response: The Challenges of Integration in a Total Resource Plan Howard.
Timber Research Centre Michael Anderson– Mohamed Farid Pablo Prallong – Lewis Macleod Ross Turbet & Group A.
Low Energy Building Design Group B Romain Jauffres, Karen Kennedy, Pedro Ros Zuazua, Ulrich Sanson Embedded Generation.
Low Energy Building Design Group B Romain Jauffres, Karen Kennedy, Pedro Ros Zuazua, Ulrich Sanson Embedded Generation.
Introduction Build and impact metric data provided by the SGIG recipients convey the type and extent of technology deployment, as well as its effect on.
Sustainable Construction
Sustainable Design within BSF: A Case Study of the City of Leicester College Liam Murray (Hulley & Kirkwood)
Building Energy Rating
RURAL ELECTRIFICATION BY SOLAR ENERGY SYSTEMS DR.S.M.ALI PUNYASHREE PATTANAYAK KIIT UNIVERSITY BHUBANESWAR.
NET ZERO HOUSE Etienne Hentzen Mark Horgan Mark Lewis Grant MacGregor Darren Tannock.
Sustainable Hotel Design Presentation 3 Supply Analysis Group 5.
Sustainable Architecture Presented by Caroline Batson Senior Architect and Sustainability Manager.
Sustainable Hotel Design Presentation 2 Passive Design Group 5.
Sustainable Hotel Design Group 5 Presentation 4 Demand/Supply Matching.
European Solutions Group Members: Iain Gauld Michael Allan Scott Mackay Elisa Massé Helena Cortina.
BRE Energy Efficient Office of the Future
Energy in Focus Energy Savings with Water Based Systems By Maija Virta Specialist of Indoor Environment Technology.
The Status of the Building Energy Sector in DPR Korea PIINTEC, DPR of Korea BEET Workshop, Beijing, China, 9 th, March, 2008.
26 th April 2007 Integrating Composting Toilets within the Concept of an Eco-Beach Richard Forbes - Physics Gemma Gotch - Chemistry Panagiotis Grigorakis.
Community Energy Opportunities Jon Bell Business Development Manager Mosscliff Environmental Ltd.
Zero-Carbon Rural Home Development.  Mark Horgan – SAE  Mark Lewis – SAE  Grant MacGregor – SAE  Darren Tannock - SAE  Etienne Hentzen - ME.
Low Energy Building Design Strategy. Low Carbon Design Aim “minimizing the impact on the wider environment through consuming the minimum resources possible.
Timber Research Centre Michael Anderson– Mohamed Farid Pablo Prallong – Lewis Macleod Ross Turbet & Group A 1/03/20052 nd Presentation.
SUSTAINABILITY ANALYSIS OF RESIDENTIAL BUILDINGS Ashok Kumar Abhilash Vijayan Department of Civil Engineering.
By Anuja Chockalingam Surabhi Satam. Eco-Friendly Homes Eco-Friendly: having little or no impact on the Native Eco System. The most extreme eco-friendly.
SUSTAINABLE ENERGY REGULATION AND POLICY-MAKING FOR AFRICA Module 14 Energy Efficiency Module 14: DEMAND-SIDE MANAGEMENT.
 Site  Requirements  Local Resources  Initial layout ideas  Brief material selection  Supply options.
Final Project Renewable Energy System : Biomass Iberian Partnership for Technician Excellence, Summer 2012.
Demand side management of a domestic dishwasher: Wind energy gains, financial savings and peak-time load reduction Authors: P.Finn, M.O’Connell, C.Fitzpatrick.
Passive Technologies and Other Demand-Side Measures.
Final Application Portfolio Community Level Solar Energy System Daniel Marticello ESD.71 Fall
Steve Craker K-12 Team Lead Geoff Overland IT and Data Center Focus on Energy Increase IT Budgets with Energy Efficiency.
Joint OSPE – PEO Chapter Energy Policy Presentation Prepared by OSPE’s Energy Task Force 1.
Concept of Energy Efficiency. Buildings, as they are designed and used, contribute to serious environmental problems because of excessive consumption.
Towards Net Zero Energy Buildings: Dynamic Simulation of office Building in Three Climate Zones of Europe Nusrat Jung 1,2, Jari Shemeikka 1, Risto Lahdelma.
BEM CLASS 5 Building Thermodynamics – 2 Air-conditioning Load Calculation – latent heat, solar and internal gains.
Presentation 2 TEAM ZERO Arnaud Gibert Bintou Ouedraogo Danny Tang Naeema Hafeez Paul Dupuy.
Green Building Residential Construction
The Future’s Bright, The Future’s Renewable! By: Aidan Johnson (s ); Cathal Treacy (s ); Hamish Connechen.
Curtain Walling System Cladding System Insulation Panels.
APEC Low Carbon Model Town Project Phase1 Tianjin Yujiapu Feasibility Study 1 APEC LCMT Project Feasibility Study Phase 1 Tianjin YUJIAPU Low-Carbon CBD.
Name of Building(s) or Project Speaker(s) Organization(s)
Techno-economic Analysis of an Off-grid Micro- Hydrokinetic River System for Remote Rural Electrification Central University of Technology Energy Postgraduate.
The EWZ building Presentation of the building Presentation of the building The design issue The design issue The building concept The building concept.
SPRING 2010 Spring 2010 CS Happy Healthy Home Zero Energy Homes By ANUJA CHOCKALINGAM SURABHI SATAMHappy Healthy Home.
Riga Technical University Institute of Heat, Gas and Water technology OFFICE BUILDING NIGHT COOLING POTENTIAL IN BALTIC REGION RENARS MILLERS, ALEKSANDRS.
Strategic Planning for DSM in a Community-owned Utility Presented by Shu-Sun Kwan & Ed Arguello Colorado Springs Utilities 2005 APPA Engineering & Operations.
Plug-in Vehicles and the Electric Grid Mark Kapner, PE Senior Strategy Planner Austin Energy
Energy conservation strategies Buildings energy consumption depends on building envelop, efficiency of HVAC and lighting systems, amount of required fresh.
Carbon Emissions and the Need for Improved Energy Efficiency.
Site Location: Site Location: Gap Site at Bath Street and Pitt Street Plot: Plot: 50m x 50m Building Area: Building Area: 4000m 2 maximum Building Height:
A Closer Look at Energy Demands: Quantification and Characterisation.
Steady State Analysis Of A Microgrid Connected To A Power System
RENEWABLE ENERGY STRATEGIES FOR MANUFACTURERS BEN D.S. COLLINS RENEWABLE ENERGY DEPARTMENT SUPERVISOR
Global construction consultants SPENDING WISELY Laurence Brett Partner Davis Langdon LLP.
Renewable Energy Innovation In Canberra Jon Sibley Director, Energy and Waste Policy Environment and Planning Directorate.
Renewable Energy Technologies and the Building Schools for the Future Programme Property Group - M&E Team Michael J Rigby M & E Team Manager Mechanical.
Overview and Update E7A Renewal Project. Exterior View E7A Renewal and Atrium Link to E7B.
Fort Stanwix National Monument Energy Audit Contract
Comparison of THREE ELECTRICAL SPACE HEATING SYSTEMS IN LOW ENERGY BUILDINGS FOR SMART LOAD MANAGEMENT V. Lemort, S. Gendebien, F. Ransy and E. Georges.
Feasibility Study Phase1 Tianjin YUJIAPU Low-Carbon CBD
bre Innovation Park Visitor Centre:
Timber Research Centre
Energy Saving Concepts and Opportunities in Foundry (A case Study)
Solar City: Effect of Solar Technologies on Network Performance
NET-ZERO-ENERGY (NZE) WASTEWATER TREATMENT PLANTS (WWTPs)
Concept of Energy Efficiency
Integration of EVs with Existing Distributed Energy Resources in Findhorn Ecovillage Craig mcarthur, Georgios PAPOUTSIS, KONSTANTINOS PISOKAS, MARINOS.
THE STUDY OF SOLAR-WIND HYBRID SYSTEM PH301 RENEWABLE ENERGY
Presentation transcript:

Timber Research Centre Michael Anderson– Mohamed Farid Pablo Prallong – Lewis Macleod Ross Turbet & Group A 26/04/20054 th Presentation

Presentation Agenda Introduction to Project Introduction to Project Building Description Building Description Demands Demands Demand Side Management Techniques Demand Side Management Techniques ESP-R – Design Changes ESP-R – Design Changes Homer Homer Control Control Supply Supply Conclusion Conclusion

Our Aim Use Demand Side Management to facilitate the embedding renewable energy to a Timber research centre Use Demand Side Management to facilitate the embedding renewable energy to a Timber research centre Apply design changes to match building energy demands with renewable supply. Apply design changes to match building energy demands with renewable supply. Show results through simulation and website. Show results through simulation and website.

Review of the building Timber Research Centre Timber Research Centre Up to 80 occupants Up to 80 occupants Situated in outskirts of Glasgow Situated in outskirts of Glasgow Typical of offices (loads) across Central Scotland (weather) Typical of offices (loads) across Central Scotland (weather)

Building Demands Heating Heating Space heating Space heating Hot water Hot water Electrical Electrical Lighting Lighting Ventilation Ventilation Machinery Machinery Other appliances Other appliances

Calculating Demands Heating DemandsElectrical Demands Esp-r Model

Seasonal Demands Heating demands Heating demands

Seasonal Demands Electrical Demands Electrical Demands

Demand Side Management. Strategies utilised throughout the project. Strategies utilised throughout the project. Peak clipping Peak clipping Valley filling Valley filling Load shifting Load shifting Design changes made in order to implement these strategies. Design changes made in order to implement these strategies. How these changes have affected the demands of our design. How these changes have affected the demands of our design.

Design changes 1. Peak clipping To help lower the demand, we looked to significantly reduce the loads in the building Natural lighting. Natural lighting. Natural heating. Natural heating. Energy reduction in cafeteria. Energy reduction in cafeteria.

Design changes 2. Valley filling The goal is to build up off-peak loads in order to smooth out the load and improve the economic efficiency of the building. Heating slowly turned on in the morning before occupancy Heating slowly turned on in the morning before occupancy Heating during the weekends. Heating during the weekends.

Design changes 3. Load shifting The idea behind load shifting is to move the times of peak energy usage to times where there is a excess of electricity. Stagger times at which occupants enter the building. Stagger times at which occupants enter the building. Change designated break times throughout the day. Change designated break times throughout the day.

Effects of changes. Lower demand peaks in spaces, both in terms of heating and lighting. Lower demand peaks in spaces, both in terms of heating and lighting. Smoothened demand curve Smoothened demand curve Better options and feasibility for supply matching. Better options and feasibility for supply matching.

Design changes

U-Value External wall properties External wall properties Weatherboard: 100mm Weatherboard: 100mm Glasswool: 75 Glasswool: 75 Air Gap: 50 Air Gap: 50 Breezeblock: 100 Breezeblock: 100 Overall U-Value = 0.39W/m 2 K Overall U-Value = 0.39W/m 2 K

External Wall Construction New Wall Properties New Wall Properties Weatherboard: 100mm Weatherboard: 100mm Glasswool: 200 Glasswool: 200 Air Gap: 50 Air Gap: 50 Breezeblock: 100 Breezeblock: 100 Overall U-Value = 0.16W/m 2 K Overall U-Value = 0.16W/m 2 K

Daylight Utilising as much daylight as possible Utilising as much daylight as possible

Daylight Careful to avoid Careful to avoid glare & unwanted heat gains

Heating control Continuous heating… Continuous heating… Pre-Heat 0000 – 0700 (12DegC) Pre-Heat 0000 – 0700 (12DegC) Basic Control (26DegC) Basic Control (26DegC) Pre-Heat 1600 – 0000 (12DegC) Pre-Heat 1600 – 0000 (12DegC)

Seasonal Demands Typical winter Typical winter

Seasonal Demands Typical spring Typical spring

Seasonal Demands Typical summer Typical summer

Automatic Control System Sensors Sensors Computer Network Computer Network Controlling each room separately Controlling each room separately

Flow charts

Lighting Control

Supply Wind Energy 30KW Wind Energy 30KW PV Solar 40KW PV Solar 40KW Generator 50 KW Generator 50 KW Battery x 10 Battery x 10 Nominal Voltage 4V Nominal Voltage 4V Nominal Capacity 7.6 KWh Nominal Capacity 7.6 KWh

Matching Methods

Component Production Fraction (kWh/yr) PV array 63,462 27% PV array 63,462 27% Wind turbine 57,946 25% Wind turbine 57,946 25% Generator 1112,359 48% Generator 1112,359 48% Total 233, % Total 233, %

Annual electric energy consumption Total Electrical Demand 173,310 kWh/yr Total Electrical Demand 173,310 kWh/yr Excess electricity:60,456kWh/yr Excess electricity:60,456kWh/yr

Emissions without Renewable (kg/yr) (kg/yr) Carbon dioxide 260,993 Carbon dioxide 260,993 Carbon monoxide 644 Carbon monoxide 644 Unburned hydrocarbons 71.4 Unburned hydrocarbons 71.4 Particulate matter 48.6 Particulate matter 48.6 Sulfur dioxide 524 Sulfur dioxide 524 Nitrogen oxides 5,748 Nitrogen oxides 5,748

Emissions after embedding Renewables Emissions down by approx 50% (kg/yr) (kg/yr) Carbon dioxide 136,379 Carbon dioxide 136,379 Carbon monoxide 337 Carbon monoxide 337 Unburned hydrocarbons 37.3 Unburned hydrocarbons 37.3 Particulate matter 25.4 Particulate matter 25.4 Sulfur dioxide 274 Sulfur dioxide 274 Nitrogen oxides 3,004 Nitrogen oxides 3,004

Assumptions Wind and Solar Data are estimated for urban areas (lack of information available) Wind and Solar Data are estimated for urban areas (lack of information available) Cost is not taken in consideration Cost is not taken in consideration Demands are assumed to be of a typical office Demands are assumed to be of a typical office

Conclusion Heating demands has been reduced by approx 20% Heating demands has been reduced by approx 20% Electrical demands has been reduced by 10% Electrical demands has been reduced by 10% Embedding Renewable generation reduced emissions by more than 50 % Embedding Renewable generation reduced emissions by more than 50 %

Thank you for your attention Any Questions?

Crit 4 (Final Presentation) Your team should be reporting the outcomes from the year's investigation. These should include a summary of how and where energy savings have been achieved, summary of how and where energy savings have been achieved, an assessment of the improvements to building performance, an assessment of the improvements to building performance, reduction in plant capacity and the reduced environmental impact achieved by adopting the plant and control procedures used. reduction in plant capacity and the reduced environmental impact achieved by adopting the plant and control procedures used.