© 2010 AT&T Intellectual Property. All rights reserved. AT&T, the AT&T logo and all other AT&T marks contained herein are trademarks of AT&T Intellectual.

Slides:



Advertisements
Similar presentations
Trystar Generator Docking Stations & Portable Power Cable
Advertisements

Contract clauses The Central Point of Expertise on Timber Procurement.
© 2010 AT&T Intellectual Property. All rights reserved. AT&T, the AT&T logo and all other AT&T marks contained herein are trademarks of AT&T Intellectual.
Presentation : IMS – Tech Managers ConferenceAuthor : IMS StaffCreation date : 08 March 2012Classification : D3Conservation :Page : # 05 - Wiring Methods.
© 2010 AT&T Intellectual Property. All rights reserved. AT&T, the AT&T logo and all other AT&T marks contained herein are trademarks of AT&T Intellectual.
© 2010 AT&T Intellectual Property. All rights reserved. AT&T, the AT&T logo and all other AT&T marks contained herein are trademarks of AT&T Intellectual.
AC-SSC-1 Installation and operation manual
Honeywell Guidelines for PowerPoint®
2014 NEC Code Changes Ted “Smitty” Smith E Light Electric.
© 2010 AT&T Intellectual Property. All rights reserved. AT&T, the AT&T logo and all other AT&T marks contained herein are trademarks of AT&T Intellectual.
© 2010 AT&T Intellectual Property. All rights reserved. AT&T, the AT&T logo and all other AT&T marks contained herein are trademarks of AT&T Intellectual.
Wiring Color Codes for McLean County 4-H Projects.
© 2011 AT&T Intellectual Property. All rights reserved. AT&T and the AT&T logo are trademarks of AT&T Intellectual Property. AT&T Proprietary (Internal.
© 2010 AT&T Intellectual Property. All rights reserved. AT&T, the AT&T logo and all other AT&T marks contained herein are trademarks of AT&T Intellectual.
© 2010 AT&T Intellectual Property. All rights reserved. AT&T, the AT&T logo and all other AT&T marks contained herein are trademarks of AT&T Intellectual.
Express Rail Link The First Operational TETRA System for Rail in the World Dr. Aminuddin Adnan CEO Express Rail Link Sdn Bhd 18 May st Malaysian.
© 2014 AT&T Intellectual Property. All rights reserved. AT&T, the AT&T logo and all other AT&T marks contained herein are trademarks of AT&T Intellectual.
Electrical Power Systems
During a mains supply interruption the entire protected network is dependent on the integrity of the UPS battery as a secondary source of energy. A potential.
Battery Principles.
© 2010 AT&T Intellectual Property. All rights reserved. AT&T, the AT&T logo and all other AT&T marks contained herein are trademarks of AT&T Intellectual.
Inverters November 2007, Alex Righolt. Overview A&A Computers sell and install inverter systems as an alternative to UPS-es. Inverters are easily scaleable;
Student Handout Packet Go to page A4. Please answer the following questions using page A4.
© 2010 AT&T Intellectual Property. All rights reserved. AT&T and the AT&T logo are trademarks of AT&T Intellectual Property. Deeper Dive Into: User Stories.
CSA Release 2 CYBER Training. Training Purpose Review the new functionality in CYBER that will assist in the submission and review of Treatment Plans.
Long Term Leave Management Program County of Los Angeles Department of Human Resources October 28, 2010.
© 2010 AT&T Intellectual Property. All rights reserved. AT&T, the AT&T logo and all other AT&T marks contained herein are trademarks of AT&T Intellectual.
Electrical Installation 2
© 2010 AT&T Intellectual Property. All rights reserved. AT&T, the AT&T logo and all other AT&T marks contained herein are trademarks of AT&T Intellectual.
242/102/49 0/51/59 181/172/166 Primary colors 248/152/29 PMS 172 PMS 137 PMS 546 PMS /206/ /227/ /129/123 Secondary colors 114/181/204.
AT&T Enhanced WebRTC API Beta © 2015 AT&T Intellectual Property. All rights reserved. AT&T, the AT&T logo and all other AT&T marks contained herein are.
Purchasing Policy and Procedures Chapter 3. The Term “Policy”  Refers to set of purposes, principles, and rules of action that guide an organization.
Methods of Specifying ACT Objective Recognize the language, proper preparation, and appropriate situation for the four methods of specifying. 2.
Measurement and Payment. Construction Progress Payments –Contractor gives a bill for progress to RPR Outlines what bill is for Give details as needed.
Committee on Refinery Equipment November 2010 Update to the Refining Subcommittee Michael Lubcyik, Chevron Energy & Technology Company, Chair, CRE.
© 2013 AT&T Intellectual Property. All rights reserved. AT&T, the AT&T logo and all other AT&T marks contained herein are trademarks of AT&T Intellectual.
© 2010 AT&T Intellectual Property. All rights reserved. AT&T, the AT&T logo and all other AT&T marks contained herein are trademarks of AT&T Intellectual.
Cabling Project. Your first responsibility, as the network designer, will be to have your client specify, in writing, the desired outcome of the project.
© 2010 AT&T Intellectual Property. All rights reserved. AT&T, the AT&T logo and all other AT&T marks contained herein are trademarks of AT&T Intellectual.
PROP Leif Sawyer. Draft Policy ARIN Eliminating Needs-based Evaluation for Section 8.2, 8.3, and 8.4 transfers of IPv4 Netblocks Author:
Spectrometer Solenoid: Plans to Fix Magnet 2 Steve Virostek Lawrence Berkeley National Lab Spectrometer Solenoid Review November 18, 2009.
Honeywell Guidelines for PowerPoint ® Honeywell PowerPoint ® Template October 2014.
Doc.: IEEE /0617r0 Submission May 2008 Tony Braskich, MotorolaSlide 1 Refining the Security Architecture Date: Authors:
© 2010 AT&T Intellectual Property. All rights reserved. AT&T, the AT&T logo and all other AT&T marks contained herein are trademarks of AT&T Intellectual.
Electrical Installation AMI- 17.0
Update: AUL Guidance Revisions Summary of Comments June 23, 2011 Peggy Shaw Workgroup Chair.
Long Term Leave Management Program Eliza Carrillo County of Los Angeles Department of Human Resources March 24, 2011.
Activity # 1 Problem Solving/ Engineering Design Process IET 120-Technology Systems Team Harris & Jent.
McDonough Bolyard Peck Educational Series HVAC Commissioning Presented by: Doug Wren Steve Baxter September 30, 2003.
Starting Residential Wiring.  The most important element in wiring. Safety is proper grounding.  Grounding is the connection of all parts of a wiring.
HOUSE WIRING Final Review. The Atom Atoms are the basic building blocks of matter that make up everyday objects. A desk, the air, even you are made up.
HOUSE WIRING Final Review. Electricity Electricity = flow of electrons Conductor= electricity passes thru easily - Metal, water, person Insulator = restricts.
HOUSE WIRING NOTES. Electricity  Proton – positive charge  Electron – Negative charge  Electricity = flow of electrons Conductor= electricity passes.
© 2012 AT&T Intellectual Property. All rights reserved. AT&T, the AT&T logo and all other AT&T marks contained herein are trademarks of AT&T Intellectual.
Residential Wiring Unit 3 – Installation and Planning.
ELECTRICAL WIRING WIRING BASICS Written by Bobby Joslin
60 Draft Policy ARIN NRPM 4 (IPv4) Policy Cleanup.
Technical Panel Session. Sunday January 11, DC System Failure Modes IEEE PES SBC Winter Meeting. January 11 – 15, New Orleans, LA Part 3.
Residential Wiring Unit 3 – Installation and Planning Chaps 9-12.
Planning Electrical Circuits Original by Ryan Talton Modified by Georgia Agriculture Education Curriculum Office –June 2004.
Domestic Wiring Instructions
Planning Electrical Circuits
Planning Electrical Circuits
Supplier Publicity Guidelines for SCQI, PQS and Achievement Winners
Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Add name of submission] Date Submitted:
AFCI Protection: AFCI Receptacles and the NEC
September 2010 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG6 Proposed MAC comment resolution]
Matías Heinrich VP Operations Latam October 2011
Door Heat Exchanger: Specification
Presentation transcript:

© 2010 AT&T Intellectual Property. All rights reserved. AT&T, the AT&T logo and all other AT&T marks contained herein are trademarks of AT&T Intellectual Property and/or AT&T affiliated companies. All other marks contained herein are the property of their respective owners AT&T Vendor Communication Conference – Power Topics Steve Martin, P.E. Jeff Stroman

© 2010 AT&T Intellectual Property. All rights reserved. AT&T, the AT&T logo and all other AT&T marks contained herein are trademarks of AT&T Intellectual Property and/or AT&T affiliated companies. All other marks contained herein are the property of their respective owners. Steve Martin, P.E. Waivers, ERCNs, and IRCNs 2

© 2010 AT&T Intellectual Property. All rights reserved. AT&T, the AT&T logo and all other AT&T marks contained herein are trademarks of AT&T Intellectual Property and/or AT&T affiliated companies. All other marks contained herein are the property of their respective owners. Power Waivers – Exponential Growth 3 Reduction Strategies 20% are dismissed If the TP lists an exception, and your situation meets that exception, no waiver is required. Description is inadequate. 10% for issues that will always be denied < 3” bus bar clearance, < 30” battery aisle space, mixing fused and unfused cable, etc. Target top 25% for IRCN / ERCN 7% for AC outlets; 1 since IRCNs / ERCNs were published. Primary and secondary shared cable rack (9%) and cable passing thru the rungs (5%) are in process of being updated.

© 2010 AT&T Intellectual Property. All rights reserved. AT&T, the AT&T logo and all other AT&T marks contained herein are trademarks of AT&T Intellectual Property and/or AT&T affiliated companies. All other marks contained herein are the property of their respective owners. Recent Power ERCNs and IRCNs AC Test Receptacles – 12’ Rule “Every 3rd bay” rule has lost meaning with the implementation of large spacers and skipped bay spaces. Mobility had no specific requirement for test outlets. Some alternate methods of providing AC outlets (under raised floor, mounted on aux framing overhead) were causing safety concerns. Smaller sites with alternate outlets in walls or sites where AT&T is a tenant / guest and has no control over the location of AC outlets were not addressed with the existing language. 4

© 2010 AT&T Intellectual Property. All rights reserved. AT&T, the AT&T logo and all other AT&T marks contained herein are trademarks of AT&T Intellectual Property and/or AT&T affiliated companies. All other marks contained herein are the property of their respective owners. Recent Power ERCNs and IRCNs SPDU Modification Matrix 5 Type of Modification Tier 1 Supplier Authorized to Perform Work Plug-in Circuit BreakerTransport or Power Plug-in Fuse BlockTransport or Power Plug-in (Bullet) Disconnect SwitchTransport or Power Bolted Fused Disconnect Switch (e.g. replace two single space TPS with one dual space TPL) Power Panel, Bus Bar, ShuntPower Adding / Splitting Primary LoadsPower Transition secondary loads to a different SPDU Power

© 2010 AT&T Intellectual Property. All rights reserved. AT&T, the AT&T logo and all other AT&T marks contained herein are trademarks of AT&T Intellectual Property and/or AT&T affiliated companies. All other marks contained herein are the property of their respective owners. Recent Power ERCNs and IRCNs Power Cable Color 6 BDFB Designation PBD to BDFB BAT & RTN BDFB to FAP BAT & RTN PBD or BDFB to Equipment (Direct) BAT & RTN FAP to Equipment BATRTN Gray RedBlack Red Black Blue RedBlack

© 2010 AT&T Intellectual Property. All rights reserved. AT&T, the AT&T logo and all other AT&T marks contained herein are trademarks of AT&T Intellectual Property and/or AT&T affiliated companies. All other marks contained herein are the property of their respective owners. Recent Power ERCNs and IRCNs Why stagger transition devices? 7 Too Much Heat! Too Little Heat! Section K ¶ was a duplicate of section J ¶ nd IRCN was simply eliminating the redundancy.

© 2010 AT&T Intellectual Property. All rights reserved. AT&T, the AT&T logo and all other AT&T marks contained herein are trademarks of AT&T Intellectual Property and/or AT&T affiliated companies. All other marks contained herein are the property of their respective owners. Jeff Stroman Standard Build Program 8

© 2010 AT&T Intellectual Property. All rights reserved. AT&T, the AT&T logo and all other AT&T marks contained herein are trademarks of AT&T Intellectual Property and/or AT&T affiliated companies. All other marks contained herein are the property of their respective owners. Test & Acceptance AT&T Power Engineers have been receiving requests to add FPQ for “test and acceptance”. Power Building Blocks that install equipment requiring test and acceptance contain an included work note: –“Testing, validation, verification, and acceptance activities in support of ATS pre-acceptance or acceptance of the work.” Power OTVs should not add FPQ for “test and acceptance” or any other synonymous activity. The compensation for these activities is already included in the Building Block Price Caps where appropriate. 9

© 2010 AT&T Intellectual Property. All rights reserved. AT&T, the AT&T logo and all other AT&T marks contained herein are trademarks of AT&T Intellectual Property and/or AT&T affiliated companies. All other marks contained herein are the property of their respective owners. Minor Material Pricing Discrepancies AT&T Power Engineers have been receiving requests to add FPQ for “minor material pricing discrepancies”. Standard procedure when a Power OTV notices a discrepancy in pricing of minor material or any component of a Building Block Price Cap is to complete a Building Block Price Cap Dispute Form and submit it to AT&T GBOS (Procurement, Supply Chain, etc.) for review. Power OTVs should not attempt to add FPQ to quotes for perceived discrepancies on pricing of minor material. 10

© 2010 AT&T Intellectual Property. All rights reserved. AT&T, the AT&T logo and all other AT&T marks contained herein are trademarks of AT&T Intellectual Property and/or AT&T affiliated companies. All other marks contained herein are the property of their respective owners. Minor Material Pricing Examples On a recent vendor quote review the following text was included as justification for adding Driver DC-FPQ003 in the amount of $53,326: –“Material not covered by Building Blocks. Additional cost associated with cable, lugs, and in-line reducers” Building Blocks for DC power cabling such as BC-CAP0xx and their associated DC-CAP0xx and DC-CAP0xxX Drivers contain the following included work note: –Cabling of one DC power circuit or paired run, both discharge & return, up to 10 ft. each, including terminations (i.e. flexible wire drops, lugs, inline splices, fuses, etc.). The requested FPQ was rejected. Do not add FPQ. 11

© 2010 AT&T Intellectual Property. All rights reserved. AT&T, the AT&T logo and all other AT&T marks contained herein are trademarks of AT&T Intellectual Property and/or AT&T affiliated companies. All other marks contained herein are the property of their respective owners. Labor Effort Pricing Discrepancies AT&T Power Engineers have been receiving requests to add FPQ for “extra labor or effort due to difficult cable runs”. Standard procedure when a Power OTV notices a discrepancy in pricing of installation labor or any component of a Building Block Price Cap is to complete a Building Block Price Cap Dispute Form and submit it to AT&T GBOS (Procurement, Supply Chain, etc.) for review. Power OTVs should not attempt to add FPQ to quotes for perceived discrepancies on pricing of labor or perceived differences in labor effort. 12

© 2010 AT&T Intellectual Property. All rights reserved. AT&T, the AT&T logo and all other AT&T marks contained herein are trademarks of AT&T Intellectual Property and/or AT&T affiliated companies. All other marks contained herein are the property of their respective owners. Labor Effort Pricing Examples On a recent vendor quote review the following text was included as justification for adding Driver DC-FPQ002 in the amount of $20,696: –“Additional labor not covered by Building Blocks due to difficulty of cable route” The Standard Build Program Guidelines contain the following admonition under the section detailing use of FPQ Drivers: –There should never be any inappropriate use of a FPQ BB/DR to pay for anything that is already included in other BBs/DRs. That includes the use of FPQ Drivers for what the OTV might generally describe as “extra effort”. The requested FPQ was rejected. Do not add FPQ. 13

© 2010 AT&T Intellectual Property. All rights reserved. AT&T, the AT&T logo and all other AT&T marks contained herein are trademarks of AT&T Intellectual Property and/or AT&T affiliated companies. All other marks contained herein are the property of their respective owners. Timing of Building Block Releases The fluctuating cost of some commodities, especially copper, causes pricing discrepancies in the Standard Build Program’s Building Block and Driver Price Caps from time to time. In order to address this AT&T has worked with several suppliers of AIW Southwire to ensure that pricing information is provided about the first week of odd numbered months to coincide with pricing adjustments effective from AIW Southwire on the 15 th of odd numbered months. AT&T is timing Building Block releases as soon as possible after these adjustments. Are Power OTV contract managers interested in reducing the contractual 30 day announcement cycle to better accommodate these adjustments? 14