Issues and Experiences with Infrastructure Grants from Multiple Perspectives – Panel Discussion OPUS D AYTON K NIGHT John W.C. Boyle, M.I.C.E., P.Eng.

Slides:



Advertisements
Similar presentations
ABC Change Orders College of Environmental Design
Advertisements

J. Matos e Silva Lecturer at ISEL (Lisbon Technical University), Portugal.
Output & Performance based Road Contracts (OPRC)
Fixed price contract: A contract that provides a price for each procurement item obtained under the contract.
Presentationby Construction Association of Bhutan.
2013 BUDGET General Fund Revenues$84,870,998 Expenditures Divisional 69,635,424 Non-Divisional 5,695,509 Transfers 9,540,065 84,870,998 $ Nil * Capital$14,788,522.
Housing & Homeless Council began with action in Conference Committee on Church and Society presented a resolution to the Annual Conference asking.
Business Park Partnership Program. Prosperity 2021  Part of Strategy to  Encourage Job Creation  Encourage Development of Business Districts (Hargrove,
Presentation to Barclay Owners November 21, 2013 Window Replacement Project Information Session.
On-Call Signal Contract Options for Discussion March 13, 2015 Cape Cod Joint Transportation Committee.
Determination of Construction Contract Duration for Public Projects in Saudi Arabia By: Ahmed Saleh Al-Sultan, June 1989 Presented by Sameh Elish January.
Above and Beyond... The Essential Role of Capture Managers in The New Normal Environment 2014 Mid-Atlantic Conference & Expo Sheraton Premiere.
COMMERCIAL “SOLE SOURCE” PROPOSAL ANALYSIS ROADMAP 1. Is information available within the Government? Step 1 – Information within the Government If Yes.
Lecture(3) Instructor : Dr. Abed Al-Majed Nassar
LOGO October The Employer FIDIC 1999 dasdas Supervisor: Dr.Kamalain shaath Done by: Mahmoud Abu Kmail Construction Contract Administration ENGC.
Chapter 2 A Strategy for the Appraisal of Public Sector Investments.
DESIGNER’S EXPERIENCE OF FINNISH RAILWAY PROJECTS RAILWAY PROJECTS FINLAND- SEMINAR Kari Fagerholm.
Construction Engineering 221 Cost Estimating and Bidding.
Monitoring Public Procurement Seminar on anti-fraud and anti-corruption in Slovakia Jan Ondrus, Bratislava,
Joint Business Plan Madhurjya K. Dutta 1mk_dutta Sept 2010.
Helping the Good Get Better, but Leaving the Rest Behind: How Decentralization Affects School Performance Very Preliminary Sebastian Galiani Paul Gertler.
Financing Urban Public Infrastructure
Copyright © 2009 T.L. Martin & Associates Inc. Chapter 3 Requirements of a realistic CPM schedule.
Building a Better Bid The Nuts & Bolts Dave Leonard The World Bank.
Constructing West Midlands Martin Merrix Divisional Manager, Urban Design.
PEIP National workshop in Montenegro: developing environmental infrastructure projects in the water sector Feasibility Study Preparation Venelina Varbova.
Click to edit Master title style Click to edit Master subtitle style PBC Lessons Learned A Contractor’s Perspective June 29, 2005 Tushar Talele ARCADIS.
Best Value for Clients Presented to the Canadian Public Procurement Forum by Glenn Martin, Executive Director Consulting Engineers of BC November 4, 2009.
Module 10 Session 10.4 Visual 1 Module 10 Organizing Procurement Session 10.4 Procurement of Services: Use of Consultants and Developing Terms of Reference.
Completing the State Aid Payment Request (SAPR). Tips Each spring check on the State Aid Finance web page for the current version of the State Aid Pay.
Education, Training and Establishment Survival William Collier, Francis Green & Young-Bae Kim.
Sunshine Coast Regional District Development Cost Charges July 3, 2014 Infrastructure Services Committee Bob Twerdoff.
ARI Supervisor’s workshop Consultancy and Commercial Research: Costing and pricing Responsibilities Steven Chambers Business Development Manager (Environment)
Procurement Finished Equals Job Done? Alison Brown Strategic Housing Director.
The State Procurement Agency of the Republic of Azerbaijan Welcomes the participants of the 9 th Public Procurement Exchange Platform “Efficient Implementation.
Report on the Challenges in the Planning and Procurement of Services for the Ceres and van Rhynsdorp Correctional Facilities Portfolio Committee on Correctional.
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
1 11/8/ Waste Pro of South Carolina and Greenspace Louis J. Diaz Region Vice President South Carolina and Coastal Georgia.
A Logistical Analysis. The recent acquisition of Freddie Mac and Fannie Mae, in the way in which it was done, has left very little room for productive.
Unit 5 Operations Management Location. Learning Objectives To be able to explain the causes and consequences of location and relocation – domestically.
Johnson Street Bridge Replacement Project Update Governance & Priorities Committee Engineering Department July 9, 2009.
VALUE FOR MONEY AUDIT PRESENTATION ON MANAGEMENT OF DAM CONSTRUCTION AND WATER SUPPLY PROJECTS BY ZIMBABWE NATIONAL WATER AUTHORITY (ZINWA) PRESENTED.
Proposition 1 Workshop: the Grant Application Process July 2015.
Questions from the National President concerning: NCMA CHAPTER REBATE POLICY UPDATE Board of Directors Meeting 24 January 2009 Las Vegas, NV.
Joint Report to Select Committee on Appropriations by Northern Cape Department of Health Northern Cape Department of Roads & Public Works supported by.
[insert date in Master slide 1] 1 [insert title (in Master slide 1] Waikato Strategic Planners Network 27 November 2015 Svea Cunliffe-Steel, Sector Manager.
1 Malawi Public Expenditure Review: Road Sector 21 November 2007.
QUARTERLY PERFORMANCE OF THE MUNICIPAL INFRASTRUCTURE GRANT (MIG) – 2005/06 AND 2006/07 FINANCIAL YEARS Presentation to the Select Committee On Finance.
Britannia Village Flood Control Project Report Back to RVCA Board of Directors – Dec 16, 2010 after attendance at Community Meeting of November 30, 2010.
1 EASTERN MUNICIPAL WATER DISTRICT Temecula Valley Regional Water Reclamation Facility 23-MGD Expansion Project Joe Mouawad, P.E. Senior Director.
Angelo Vian President of FEPAC Washington, D.C., U.S.A. – May 10-11, 2007 Biennial Meeting International Lending Agencies and Consulting Industry – BIMILACI.
Heritage Trust Fund Grant Orientation Session. HTF Staff and Contact Information Katrina Ringler Grants Manager ext. 215
1 ST Market Engagement Session 3 rd October 2014 RE-PROCUREMENT OF CUSTODIAL TENANT DEPOSIT PROTECTION SCHEME Presentation by Ruth Hayes.
The Challenges of Government Partnerships
Changes and Benefits brought from Modern Procurement to Bridge the Infrastructure Gap Remo Bucci, P.Eng Infrastructure and Capital Projects October 27,
BUYING QUALITY PRIVATE SECURITY SERVICES
Amended Blue Box Program Plan
OFFICE FOR THE PROTECTION OF COMPETITION
Evolution of Engagement and Delivery in Infrastructure Renewal
School Cleaning Update
Completing the State Aid Payment Request
Advice to Industry Panel – Contract Management Perspective
2018 ASPECT PRE-CONFERENCE WDA Programs Overview and Updates
Bulgaria – Country Report
Durham and Orange Transit Plan Funding Needs
CAMPUS DESIGN AND DEVELOPMENT (CDD) COMMITTEE
Construction Contract Administration
Romania-Bulgaria border. Perspectives for
NORTHERN DEVELOPMENT HOUSING PROGRAMS
Presentation transcript:

Issues and Experiences with Infrastructure Grants from Multiple Perspectives – Panel Discussion OPUS D AYTON K NIGHT John W.C. Boyle, M.I.C.E., P.Eng. Vice President MED / MMCD Joint Annual General Meeting and Workshops Representing the Consulting Engineers of British Columbia December 3, Vancouver Hilton Metrotown 1

What Went Well  The Grant program helped stimulate the consulting economy  The publication of the Grant funding provided us with good reasons to call clients we work with to mobilize on projects on which we had carried out the preliminary studies  The publication of the Grant listing enabled us to market our services to clients which we, to that point, had not worked with  The Grant program announcement was a positive public indication that the Province was seriously trying to stimulate the economy  Clients initially received greater contractor interest and better value for their tenders. 2

What Were Some of the Negative Impacts  Clients withheld projects until the Grants were announced. This caused a ramping down of work and then a ramping up after the Grant announcement  Grant expiry dates are too restrictive in some cases  The amount of effort in completing Grant applications is considerable (around $7K on average) A simpler form would be better 3

What Were Some of the Negative Impacts - continued  There was too much work to be done in a short time frame. Companies could not do all the work and had to decide whether to hire more staff for short duration work. There is the possibility that work done may not have been adequately reviewed. Due to the tight design schedule, consultants could not use the Grant projects to train inexperienced staff.  There were too many projects being tendered at the same time. Contractors’ prices increased which affected the engineers’ estimates.  The amount of work that became available resulted in a lack of experienced contractors to do all the work. This has resulted in additional contract administration costs. 4

What Were Some of the Negative Impacts - continued  The environmental approval process needs to be improved. Projects has not been proceeding in a timely fashion due to the time taken for approvals to be received.  TILMA: Some municipalities were still inviting everyone instead of going to consultants that have worked successfully with them previously. This resulted is a lot of wasted effort by consultants in submitting proposals to municipalities where low price dictates the award.  There has been little increased activity in the private development expansion sector to suggest that the program has been a success to the overall economy. 5

What Could Be Improved  Extend the Grant funding period over a longer period. The construction season for work in northern BC in particular is short.  Process the Grant applications faster and more spread out in time, rather than announcing them in batches. This would stagger the startup of the projects and improve delivery times and tendered prices.  Recognize that significant additional resources are required when a substantial amount of funding is announced at the same time 6

Thanks 7