INSPECTION PENRICE ANGASTON QUARRY OPERATION Thursday 19 February 2009.

Slides:



Advertisements
Similar presentations
SOUTHERN FRINGE DEVELOPMENTS –CONSTRUCTION MANAGEMENT STRATEGY JUNE 2011 Outline /Full Planning Permissions –provisions 1. Strategic Construction Environmental.
Advertisements

EPA CONSTRUCTION & DEVELOPMENT EFFLUENT LIMITATIONS GUIDELINES Tim Ryan, P.E. Water Resources Engineer Water Resources Engineer Wisconsin Department of.
Current Activities on Urban Air Pollution in Cambodia
Holcim Regional Distribution Centre Rooty Hill
Western Ave S53X Audit  12 th March 2014  7 pm Mantra.
We appreciate your co-operation during our works and any guidance you provide to help us minimise the impact we make on your lives will be gratefully received.
Quality Decisions Today’s Goal: To learn about nonpoint source pollution. To understand how decisions we make impact the environment around us.
0 CCG Meeting Angaston 3 rd December Penrice CCG Meeting Action Arising BLAST MONITORING Chris Linke Monitor Site Blast Data 21/11/09 60 holes located.
PUBLIC INFORMATION SESSION: Old Fall River Road Landfill Dartmouth, MA Massachusetts Unlined Landfill Closure Policy March 28, 2013 Mark Dakers, Acting.
Safe Working Procedure - Excavations Learning Objectives: By the end of this program participants will be able to demonstrate their understanding of the.
Presentation to Maxwell Place Homeowners Association 1.
| pg 1 NSW Planning & Environment Upper Hunter Mining Dialogue Presentation th October 2014 Presented by Scott Brooks, Team Leader, Compliance.
DRAYTON MINE IMPROVEMENTS TO DUST AND EMISSIONS MANAGEMENT – AIR QUALITY INFORMATION SESSIONS October 2014.
Clark County CO and PM 10 SIP Status Department of Air Quality and Environmental Management May 11, 2004.
0 CCG Meeting Angaston 14 th January Mine Operation Update Eastern Side  Shaping complete in the warden court zone  Continuing to shape the northwest.
0 CCG Meeting Angaston 1 st April Mine Operation Update Eastern area  Shaping and topsoil addition continuing  Preparation for planting of trees.
Saturday May 02 PST 4 PM. Saturday May 02 PST 10:00 PM.
EOR SYMPAQ TIMESHEET POLICY & PROCEDURES
Mining Lease Application Assessment: Processes within the Minerals and Energy Division PIRSA.
ADEQ Uses of ICF Modeling Analysis Tony Davis, Branch Manager – Air Planning Arkansas Department of Environmental Quality Criteria Pollutant Modeling Analysis.
Most Common Conservation Practices Forestry Illinois.
Jilin Provincial Transport Scientific Research Institute & PEECE Pty Ltd Environmental Management Plans Presented by Phil Hawley & Steve O’Rourke P E E.
A division of Holcim (Canada) Inc. Public Information Session Proposed Extension of the Acton Quarry May 5, 2009.
TERRAMIN AUSTRALIA Limited Angas Zinc Project. The Angas Zinc Project: noise Noise issue is a “work in progress” –Final noise outcomes and decisions awaiting.
Code Enforcement Update August 25, What is Code Enforcement? The process of preventing, inspecting and mitigating nuisances on public and private.
NUMMI New United Motor Manufacturing, Inc. Automobile manufacturing venture of General Motors Corporation and Toyota Motor Corporation.
DEPARTMENT OF REGIONAL DEVELOPMENT, PRIMARY INDUSTRY, FISHERIES AND RESOURCES GETTING STARTED Forms, Procedures and Guidelines Application for Authorisation.
Overview of Land Use Compatibility between Sensitive Land Uses and Nuisance Sources Peter Piersol A&WMA/OPPI Land Use Compatibility.
1 EPA’s Proposal for Nonroad Diesel Engines & Fuel May 2003 U.S. Environmental Protection Agency Office of Transportation and Air Quality Informal document.
“MAINTAINING ENVIRONMENTAL INTEGRITY IN MINING ” Tashana Redmond Senior Environmental Officer.
Synopsis EIA Purpose of EIA Origin Key Elements NGO Participation Content Analysis 1.
Copyright © February 2003 Green Gain Consulting (Pty) Ltd. All rights reserved. Green Gain Consulting (Pty) Ltd Air Quality Legislation Workshop Thursday,
0 CCG Meeting Angaston 6 th May Mine Operation Update Eastern area  Shaping and topsoil addition continuing  Preparation for planting of trees.
TERRAMIN AUSTRALIA Limited Angas Zinc Project. Angas Zinc Project: traffic Raised as a concern through Stakeholder consultation process Dominant source.
Briefing Session Temporary Traffic Arrangement at Campus Circuit For Site Formation Works at Area 39.
Social Benefits Improve public health of work force and community. Create more walkable, accessible, and livable neighborhoods by incorporating Smart Growth.
1 Short Term MPL – Western Area PCCG Meeting 3 rd December 2008.
Community Development Department Special Exceptions for: Automotive parts (e.g. accessories and tires) and Automotive, Recreational Vehicle, and Boat Dealers.
LIFE AFTER LANDFILL – THE TRANSITION FROM LANDFILLS TO RESOURCE RECOVERY AND TRANSFER STATION 27 September 2007 "Planning – Guidance on Planning Issues.
1 South Australian Mining Act requirements for Angaston Quarry 5 th November 2008.
Former Point Cook Fire Training Area Contamination Remediation Works Project Community Information Session 26 September 2013.
Proposed Amendments to Chapter 32 Article V Solid Waste Management and Chapter 38 Zoning 5:01 P.M. Public Hearing Presented by the Orange County Environmental.
Bricke Murfree Murfree & Murfree, PLLC Attorneys-at-Law 805 South Church St., Suite 21, Murfreesboro, TN Phone:
Proposed Amendments to Chapter 32 Article V Solid Waste Management and Chapter 38 Zoning 2:00 P.M. Public Hearing Presented by the Orange County Environmental.
Community Development Department Continuation from May 21, 2008: SPECIAL EXCEPTIONS: Automotive parts (e.g. accessories and tires) and Automotive, Recreational.
Safe Working Procedure - Excavations Learning Objectives:
INFORMATIONAL MEETING AGGREGATE OPERATION PROPOSAL Add picture.
Proposed Amendments to Chapter 32 Article V Solid Waste Management and Chapter 38 Zoning 5:01 P.M. Public Hearing Presented by the Orange County Environmental.
Greener Cleanups in the Region 10 PCB Program Michelle, Mullin R10 PCB Coordinator Clu-In Webinar November 17, 2015.
4 th MARCH 2011 Ashton Coal Operations Pty Limited Community Consultative Committee EnvironmentalReport Environmental Report.
Confined and Concentrated Animal Feeding Permitting Indiana Soybean Alliance December 12, 2006.
Leona Heights Sulfur Mine & Creek Cleanup
Think safe. Act safe. Be safe. LEHR Site Annual Soil Management Plan Training Sue Fields, Environmental Health & Safety Sept,
SECOND UNITS IN BRAMPTON BREB BUSINESS BREAKFAST October 8, 2015.
IDEM Update by Commissioner Easterly Indiana Professional Dairy Producers June 4, 2007.
Malaysia, Philippines and Vietnam July 2009 Green Plaza Hotel Da Nang MPV Group.
West Pinal PM 10 Nonattainment Area Construction Dust Rule DECEMBER 9, 2015 JOSH DEZEEUW ENVIRONMENTAL PROGRAM MANAGER 1.
16.3. Bellringer The Environmental Impacts of Mining Because of the potential environmental impact of mining on a large scale, mining is one of the most.
A PRESENTATION BY AYNSLEY ANDERSON AND LAUREN MARTIN OF BARRISTON LLP Aggregates 101 Pit stop(ped) at the OMB.
ENVIRONMENTAL MANAGEMENT REQUIREMENTS. ISO GOU has obtained certification for ISO 14001:2004 All contractors to be ISO compliant.
Local Development (San Diego)  Development Services is responsible for managing the majority of the construction and development project review services.
City Council Meeting – January 10, 2007 Rezoning Application No Salters Creek Material Recovery Facility.
Preparation for an EPA Audit and Environmental Impact Assessments Jim Dowdall Director – Enviroguide Consulting.
permitting & compliance in hillsborough county
The Provision and Use of Work Equipment Regulations 1998
Bangkok Metropolitan Administration’s activities to control air quality 1.
Our Mission We work with landowners, communities, and organizations to protect lakes and rivers through developing effective, transferable, long-term solutions.
West Gate Tunnel – Air quality expert evidence
Objectives Describe seven important potential environmental consequences of mining. Name four federal laws that relate to mining and reclaiming mined land.
Clean Air Act of 1963 By: Brian Bae Period 4.
Presentation transcript:

INSPECTION PENRICE ANGASTON QUARRY OPERATION Thursday 19 February 2009

MPL 118 Determine compliance against the applicable obligations as set out in the Mining Act 1971, the lease conditions and approved mining and rehabilitation program, number 2008/026.

“ The Licencee must in constructing and operating the Licence, ensure that there are no public nuisance impacts from noise emanating from the Licence. “ Noise levels from onsite sources are below the SA EPA Environmental Protection (Noise) Policy Use of heavy mine vehicles and equipment only between the hours from 7am to 5.30pm, Monday to Friday and 9am to 1pm Saturdays. (non public holidays)

no nuisance impacts to local residents and adjacent land uses from air emissions and dust generated by mining operations Within 3 months of licence commencement a suitable qualified consultant will develop a nuisance dust sampling program Dust analysis not more than the National health Standard

“..responsible for recording and addressing complaints received from the public with respect to the mining operations “. Penrice are now entering all complaints on a register and this information is being presented at the PCCG. One of the complaints alleges that considerable noise was generated from a road trucks leaving the site at 2.15am on the 8 February On inspection of the timesheets and the road truck logs it was found that the last truck left the site at 2145 hours on the 7 February 2009.

“..ensure that there is no clearance of native vegetation within the riparian zone of the Jaeckeli Creek Compliance with the Native Vegetation Act 1991 A vegetation management plan to be in place within 3 months Management strategy is for no overburden to be placed within a 25m buffer each side of the centre line of Jaeckeli Creek outside the Private Mine.

“..ensure that the existing soil quality and quantity is maintained. “ topsoil is being excavated and stockpiled for reuse in advance of the overburden being dumped.