ENVIRONMENTAL ASPECTS EDR - CFS Europe – Kick-Off Meetings Kick-Off Meetings, CERN, 3, 4, 5 September 20071 ILC PROJECT ENGINEERING DESIGN REPORT CFS Europe.

Slides:



Advertisements
Similar presentations
CFS TIME SCHEDULE EDR - CFS Europe – Kick-Off Meetings Kick-Off Meetings, CERN, 3, 4, 5 September ILC PROJECT ENGINEERING DESIGN REPORT CFS Europe.
Advertisements

CFS challenges for a linear collider J.Osborne CERN ILC-GDE Dubna - 4 June 2008 OUTLINE : Introduction Civil Engineering -Geology (water, stability issues.
CENF – Civil Engineering Extension B887 CERN: An accelerator complex unique in the world -Prevessin site complex- -EHN1 Extension Area- EHN1 Extension.
Environmental Health Unit: Lesson 1 - Introduction Objective: TSWBAT identify issues of how the environment affects our personal health on a daily basis.
ISO Standard is based on the management model of plan – do - check – act. Today we all be discussing the elements of the standard that deal with.
CFS near term & Required ADI input CFS near term & Required ADI input 6-12 month activities, required ADI information 10. AUG 2014CFS-ADI Joint Meeting1.
Safeguards Workshop October 30, 2008 Moldova, Chusinau Day 2 – Quiz Mitigation Dmytro Glazkov.
Michael P. Andrews NuMI Shutdown & Facility Coordinator LBNE Project ESH Manager AD ESH Special Projects Coordinator.
Conventional Facilities and Siting Global Design Effort Safety Requirements for IR Conventional Facilities and Siting Group Safety Requirements for IR.
Construction and Installation of the CLIC Experimental Area
Workshop, 12/3/2004 Banska Bystrica – SLOVAC REPUBLIC “INTEGRATED LICENCE PROCEDURE (Greek case)” Katerina Iakovidou-Anastasiadou Hellenic Ministry for.
Cryogenic cavern in Asian site Conceptual design of the cryogenic system Layout of the cryogenic plant for site A & B New layout of the cryogenic system.
Training Session Product File Notes and Registration Reports, 23 October Registration Report: General aspects M. Trybou Federal Public Service of.
TRACECA PROJECT EVALUATION
LCC Linear Collider Collaboratio ILC - CFS 12 November 2013 LCWS13 Tokyo University 1 Site-specific CF design from TDR LCWS13, 12 November 2013 Atsushi.
1 Alternative assembly option of ILD Y.Sugimoto 2010/10/18 ILD Integration
Conceptual Design Study - Cryogenic Requirements How to decide the layout of ILC cryogenic system Conceptual design of cryogenic system Layout of cryogenic.
ALICE-LHCC Review May 14, 2001 Thomas C. Meyer/EP-AIT1 TPC Field Cage Progress Report Project Schedule Technical Progress & Prototyping Contractual Matters.
LIFE AFTER LANDFILL – THE TRANSITION FROM LANDFILLS TO RESOURCE RECOVERY AND TRANSFER STATION 27 September 2007 "Planning – Guidance on Planning Issues.
Case study: SEA for land-use plan amendments of Krasna Hora municipality.
CLIC CES Meeting 14 jan 2009 A resume table for fire safety in LHC, and a possible scheme for other machine – part 1 CERN –SC Fabio Corsanego.
LINEAR COLLIDER COLLABORATION Designing the world’s next great particle accelerator Detector Hall Configuration Overview New baseline (Hybrid A’) proposed.
Environmental Protection Agency Institutional Cooperation and Policies for Streamlining of Environmental Information Vytautas.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
1 Global Design Effort TILC08 - WG1 Summary WG-1: Cost Reduction Studies J. Carwardine, T. Shidara, N. Walker (For WG-1 participants)
MODULE “PREPARING AND MANAGEMENT OF DOCUMENTATION” SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo da Vinci”
MODULE “PROJECT MANAGEMENT AND CONTROL” WASTE MANAGEMENT SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo.
TDR Status of Asian CFS Team Part II: The ILC Baseline Reference Ch.SectionSubsectionsAuthor1 st draft 112: Asian Region Siting Studies Overview Location.
Report from ILC CFS and Cryogenics Workshop
10/2010 IWLC2010 Global Design Effort 1 Brief Overview of Interaction Region Conventional Facilities in RDR Times Presenter Tom Lackowski.
26 May 2010Hans Postema - CERN Status and plan for the development and construction of CO2 Cooling System for Pixel Upgrade 1.
Civil Engineering and Services - drawings for CDR - CDR chapter J.Osborne and M.Gastal for CES WG 1.
Global Design Effort - CFS ILC10 Beijing, March, Single-Tunnel Accelerator Configuration Of Asian Region Atsushi Enomoto (KEK)
Strengths and weaknesses of the permitting system and enforcement process in RIEW – Veliko Turnovo Regional Inspectorate of Environment and Water - Veliko.
The fourth Baseline Technical Review (BTR) - Conventional Facilities and Siting March 2012 All changes made to the CFS 2007 Reference Design during.
CENF – Civil Engineering Extension B887 Status – 02 October 2014 Done: (1/2) Preliminary civil engineering drawing and Functional specification approved.
SEA in the Czech Republic Prague, 24 September 2008.
Consultant: CMDC Joint Venture 1 Evaluation and optimisation of alternatives Two cases - Criteria of judgement - Matrix evaluation, including costs - Mitigating.
1 Waste Discharge Authorization Application - British Columbia WG6 Application Process WG Document Review presented by Helga Harlander October x, 2008.
John Osborne : GS-SEM Civil Engineering 18 May 2009 CES 9 June News from ILC Japan CFS review 1-3 June 2010 :
ILC D RAFT P ROJECT S CHEDULE K LYCLUSTER 500GeV K Foraz & M Gastal ILC Mechanical & Electrical Review and CFS Baseline Technical Review Many thanks to.
Risk Analysis P. Cennini AB-ATB on behalf of the n_TOF Team  Procedure  Documents in preparation  Conclusions Second n_TOF External Panel Review, CERN,
CENF – Civil Engineering Extension B887 Status – 18 September 2014 Done: (1/2) Preliminary civil engineering drawing and Functional specification approved.
MDI 9 th Meeting - 22 nd January 2016 FCC Experimental Caverns - Feasibility and Excavation C. Cook (GS), J. Osborne (GS),
ILC J.Osborne / A.Kosmicki / B.List – March 22 th 2012 CFS update for Europe.
CENF CIVIL ENGINEERING UPDATE : - SITE INVESTIGATION - CALL FOR TENDER FOR DESIGN & CONTRACT ADMINISTRATION SERVICES - 3D VISUALS FOR SURFACE STRUCTURES.
WP 17.1 Civil Engineering Platform height / vs option Status on M. Manfredi on behalf of WP17.1 team.
COOLING & VENTILATION PLANTS M. Nonis – CERN EN Department / CV Group Annual Meeting of the FCC study – Rome 14 th April 2016.
Contract: EIE/07/069/SI Duration: October 2007 – March 2010Version: July 7, 2009 Ventilation for non-residential buildings - Performance requirements.
LAGUNA-LBNO at Fréjus General Meeting June 2013, Geneva Giovanni Como, Francesco Amberg, Daniele Bronzetti 1.
WP 17.1 Civil Engineering Point 1 - Networks LS2 COMMITTEE – CERN – Pieter Mattelaer (SMB-DI)
Contract: EIE/07/069/SI Duration: October 2007 – March 2010Version: Nov. 30, 2009 Calculation of the integrated energy performance of buildings.
ENVIRONMENTAL DUE DILIGENCE
Experimental Hall in Mountain Regions
ENVIRONMENTAL IMPACT ASSESSMENT
Conventional Facility & Siting (CF&S) Overview for the Positron Source
Marco Oriunno (SLAC), March 12, 2014 MDI WG
CLIC / ILC Collaboration for CFS works
Accelerator and Experiment Interface Session: LS2, LS3
Detector hall in mountain regions
Status of Cryogenics Facilities Design
A very first look at siting issues
ILC PROJECT ENGINEERING DESIGN REPORT CFS Europe – KICK OFF MEETING
COOLING & VENTILATION INFRASTRUCTURE
CLIC Civil Engineering Update
East Hall under construction
600 MHz – Proposed TV Transition Objectives and Methodology
Communication and Consultation with Interested Parties by the RB
Designations for Indian Country
Environmental Priorities Environmental Impact Assessment
Presentation transcript:

ENVIRONMENTAL ASPECTS EDR - CFS Europe – Kick-Off Meetings Kick-Off Meetings, CERN, 3, 4, 5 September ILC PROJECT ENGINEERING DESIGN REPORT CFS Europe – KICK OFF MEETINGS CERN 3, 4, 5 September 2007 From LHC TO ILC, Environmental aspects J-L Baldy

ENVIRONMENTAL ASPECTS EDR - CFS Europe – Kick-Off Meetings Kick-Off Meetings, CERN, 3, 4, 5 September From LHC TO ILC, Environmental questions SUMMARY 1.Introduction 2.Main CE quantities, comparison between LEP, LHC and ILC 3.Why an Impact Study for Projects on french territory ? 4.Contents of the LHC Impact Study 5.Environmental nuisances and mitigation measures for LHC and ILC 1.Chronology of the Impact Study approval process in France 2.Conclusions

ENVIRONMENTAL ASPECTS EDR - CFS Europe – Kick-Off Meetings Kick-Off Meetings, CERN, 3, 4, 5 September Introduction Environmental issues now a fundamental aspect of large scale projects (some areas being more “sensitive” than others) Environmental issues now a fundamental aspect of large scale projects (some areas being more “sensitive” than others) Standards in all countries getting more restrictive year after year Standards in all countries getting more restrictive year after year Measures to mitigate nuisances both at construction and operation stages are a non negligible part of the overall budget Measures to mitigate nuisances both at construction and operation stages are a non negligible part of the overall budget If not handled properly and in due time, they may lead to delays, unexpected changes, budget overruns… If not handled properly and in due time, they may lead to delays, unexpected changes, budget overruns…

ENVIRONMENTAL ASPECTS EDR - CFS Europe – Kick-Off Meetings Kick-Off Meetings, CERN, 3, 4, 5 September Main CE quantities Comparison between LEP, LHC and ILC Projects LEPLHCILC (phase 1) Number of shafts19615 Number of underground chambers and caverns Length of tunnels of all sizes32,6 km6,5 km72.0 km Total number of buildings Total area of buildings m m m 2 Total volume of excavation (in place) m m m 3 Volume of concrete for underground works m m m 3 Volume of concrete for surface structures m m m 3

ENVIRONMENTAL ASPECTS EDR - CFS Europe – Kick-Off Meetings Kick-Off Meetings, CERN, 3, 4, 5 September Why an Impact Study for Projects on French Territory It is a legal obligation (medium + large scale Projects) It is a legal obligation (medium + large scale Projects) It is compulsory to get the Déclaration d’Utilité Publique / DUP (signed by the prime Minister) It is compulsory to get the Déclaration d’Utilité Publique / DUP (signed by the prime Minister) DUP is a prerequisite to building permits application DUP is a prerequisite to building permits application I.S. is used as a basis to inform the local populations during the Public inquiry procedure I.S. is used as a basis to inform the local populations during the Public inquiry procedure I.S. is used as a reference during and after implementation of the works I.S. is used as a reference during and after implementation of the works (For LHC only one Impact Study covering all aspects of the Project to both the French and Swiss Authorities)

ENVIRONMENTAL ASPECTS EDR - CFS Europe – Kick-Off Meetings Kick-Off Meetings, CERN, 3, 4, 5 September Contents of the LHC Impact Study (1) 1.The Scientific basis of the LHC Project 1.1CERN in brief 1.2The LHC, next link of an Accelerators chain 1.3Physics during the last 100 years 2.Description of the LHC Project : the Accelerator 2.1Basic parameters of the LHC Project 2.2The main components of the Accelerator 2.3Cost and Time Schedule 3. The Scientific basis of the LHC Project 3.1Initial program and future developments 3.2The ATLAS Detector 3.3The CMS Detector 3.4The ALICE Detector 3.5The LHC-b Detector 3.6World wide collaboration 4.Structures to be implemented 4.Structures to be implemented 4.1The underground structures 4.2The surface structures 4.3The new burried electrical lines

ENVIRONMENTAL ASPECTS EDR - CFS Europe – Kick-Off Meetings Kick-Off Meetings, CERN, 3, 4, 5 September Contents of the LHC Impact Study (2) 5.The Management of the works 5.1Generalities 5.2Underground works 5.3Surface works 5.4The work site plants 6.The Environment in its original state 6.1Geography 6.2Weather conditions 6.3Geology 6.4Earthquakes 6.5Hydro-geology 6.6Waters 6.7Air quality 6.8Initial radiological state 6.9Initial chemical state 6.9Initial chemical state 6.10Waste disposal 6.10Waste disposal 6.11Noise 6.11Noise 6.12Existing quarries In Pays de Gex 6.12Existing quarries In Pays de Gex 6.13Flora 6.13Flora 6.14Fauna 6.14Fauna 6.15Activities and land occupation 6.15Activities and land occupation 6.16Patrimony 6.16Patrimony 7. Impact of the LHC Project on the Environment 7.1Reasons and consequences of the LHC choice 7.1Reasons and consequences of the LHC choice 7.2Méthodology for Impact evaluation 7.2Méthodology for Impact evaluation 7.3Construction phase : the work sites 7.3Construction phase : the work sites

ENVIRONMENTAL ASPECTS EDR - CFS Europe – Kick-Off Meetings Kick-Off Meetings, CERN, 3, 4, 5 September Contents of the LHC Impact Study (3) 7.4Operation phase : the completed structures 7.5Visual impact 7.5Visual impact 7.6Radiological impact 7.7Spoil treament 7.8Waste treatment 7.9Consequences on water resources 7.10Noise and vibration 7.11Transportation, traffic and road network 7.12Electrical consumption 7.13Land property impact 7.14Impact on flora and fauna 7.15Impact on safety 7.16Socio-economical impact 8.Proposed measures to avoid, mitigate or compensate impacts 8.1Buildings and their surroundings 8,2Networks 8,3Dump areas 8.4Protection against noise pollution 8.6Road improvements 8.7Protection of water resources 8.8Energy saving measures 8.9Controls measures 8.10Consequences of an earthquake 8.11Cost of measures taken to mitigate environmental impact

ENVIRONMENTAL ASPECTS EDR - CFS Europe – Kick-Off Meetings Kick-Off Meetings, CERN, 3, 4, 5 September Environmental nuisances and mitigation measures for LHC and ILC Projects (1) Type of nuisanceMitigation measures taken for LHC Proposed mitigation measures for ILC Visual, due to localisation of access buildings Minimize the numbers of accesses and related buildings. Dumps and landscaping around buildings areas Move general layout to be close to Genève-Lausanne motorway. Horizontal linking galleries to avoid villages of wineyards in certain cases Central campus buildings impact No new central campusSelect a zone with existing forest on two sides and few nearby houses Visual impact of industrial type buildings in general Systematic use of Architects, consult with local Authorities, reduce height, plant trees around… CMS assembly hall to be lowered and shortened after use. Systematic use of Architects, consult with local Authorities, reduce height, plant trees etc.. Spoil from underground works disposal Spoil smoothly disposed around two sites and landscaping works once complete. Remaining of spoil under an HV electrical line in forest Spoil smoothly disposed around main sites and landscaping works once complete. Excess of spoil to Constructors dumps if necessary

ENVIRONMENTAL ASPECTS EDR - CFS Europe – Kick-Off Meetings Kick-Off Meetings, CERN, 3, 4, 5 September Environmental nuisance and investigation measures for LHC and ILC Projects (2) Type of nuisanceMitigation measures taken for LHCProposed mitigation measures for ILC Lorries on local road network Only minimum transport of spoil on local roads. No lorries at night outside CERN Pt5 site. New dedicated road across F/CH border Only minimum transport of spoil on local roads. No village crossing as far as possible. No lorries at night Cooling towers noise and plume Use of noise attenuators on air inlet and motors. Reduce number of C. towers as far as possible Use of hybrid type cooling tower (Dry Cooling unless temperature above 15°C). Use of noise attenuators Noise No surface works at night. Noise attenuators on equipment. Noise barriers and earth dumps around sites. All Concrete buildings with thick insulation material inside when housing noisy equipment No surface works at night. Noise attenuators on equipment. Noise barriers and earth dumps. All concrete buildings with thick insulation material inside when housing noisy equipment

ENVIRONMENTAL ASPECTS EDR - CFS Europe – Kick-Off Meetings Kick-Off Meetings, CERN, 3, 4, 5 September Environmental nuisance and investigation measures for LHC and ILC Projects (3) Type of nuisanceMitigation measures taken for LHCProposed mitigation measures for ILC Water pollution Systematic water treatment plants (construction and operation). Detectors. Boreholes to check quality of water table during the works. Systematic water treatment plants (construction and operation). Detectors. Boreholes to check quality of water table during the works Air pollution / dustUse of water sprays and filters. Detectors around sites Electrical lines All lines buried as far as possible up to medium voltage General Regular meetings with neighbours during construction. Paper / informatic information to the public

ENVIRONMENTAL ASPECTS EDR - CFS Europe – Kick-Off Meetings Kick-Off Meetings, CERN, 3, 4, 5 September Chronology of the Impact Study approval in France for LHC 6.Chronology of the Impact Study approval in France for LHC Start monthActivity 11 months Impact study writing with the help of external Consultants and experts __________ Sending of Draft 1 to the French Authorities (central and local) 12 months analysis of all comments received + discussions + modification Sending of Draft 2 __________ Analysis of comments received + discussions + modifications Sending of final version, together with DUP application 15 months* Public Inquiry Analysis by the « Commission d’Enquête » __________ Signature of « Déclaration d’Utilité Publique » (DUP) by French Prime Minister and official publication TOTAL : 3 years and 2 months ** * Including a five months delay for french P.M. signature (2 years and 9 months without delay in total) ** Overall duration has been 2 years and 3 months for the LEP Project Overall foreseen duration is 2 years and 8 months in total on the ILC Technical Time Schedule

ENVIRONMENTAL ASPECTS EDR - CFS Europe – Kick-Off Meetings Kick-Off Meetings, CERN, 3, 4, 5 September Conclusions Impact study report will constitute an important part of the project Impact study report will constitute an important part of the project Seeking and obtaining approval from concerned Authorities is generally a lengthy process, to be taken into account as such in the Project Time Schedule Seeking and obtaining approval from concerned Authorities is generally a lengthy process, to be taken into account as such in the Project Time Schedule However a major part of it might be in the hands of the selected bidder depending on what he offers to take into account (likely with help from Consultants and experts) However a major part of it might be in the hands of the selected bidder depending on what he offers to take into account (likely with help from Consultants and experts) In Europe, a great deal of inspiration can be gained from the LHC Project, which was successful in adressing and solving environmental issues In Europe, a great deal of inspiration can be gained from the LHC Project, which was successful in adressing and solving environmental issues However, ILC Project spans more widely into sensitive zones, to be investigated at early stages as far as possible However, ILC Project spans more widely into sensitive zones, to be investigated at early stages as far as possible