UV Disinfection for Unfiltered Surface Water Regulatory Compliance Kevin Castro, PE | GHD Image placeholder.

Slides:



Advertisements
Similar presentations
Ultraviolet (UV) Disinfection in Water Treatment
Advertisements

Essentials of Surface Water Treatment
DESIGN LAYOUT OF DISTRIBUTION SYSTEMS
Terry Keep September 18, 2013 ADVANCES IN UV TECHNOLOGY FOR 4-LOG VIRUS DISINFECTION OF GROUNDWATER.
© 2013 O’Brien & Gere Volute Press Application on Water Treatment Residuals 2013 NYC Watershed / Tifft Science & Technical Symposium September 19, 2013.
C. T Calculation Math for Water Technology MTH 082 (pg. 468) Math for Water Technology MTH 082 (pg. 468) “Required by Law”
Stave Lake Water Supply & Treatment Project. Existing Water Supply System Norrish Creek Cannell Lake 19 Groundwater Wells.
Funding for Municipal Infrastructure Ruth Noemí Colón Acting Secretary of State George Stafford Deputy Secretary of State Public Finance and Management.
Case Study: Disinfection byproducts in a recently constructed public water supply Maria O’Connell, P.E. Kristine Wheeler, P.E. New York State Department.
Brushy Creek Municipal Utility District Water Facility Project Status Update Presented at April 9, 2009 Board Meeting Joseph Jenkins, P.E., CH2M HILL.
A Tale of Three WWTPs (Frangel, Town of Kent, Kent Manor ) NYC Watershed/Tifft Science and Technical Symposium September 19, 2013 Thayer Hotel, West Point,
UV Systems; Alternative Disinfectant to Free Chlorine
Norwalk, Connecticut: A Public-Private Partnership Case Study Mayor Alex Knopp U.S. Conference of Mayors Urban Water Council October 2004.
Tim Stefanich - Environmental Engineer Sioux Falls Water Purification Cryptosporidium Monitoring for Compliance with the LT2 Rule.
Surface Water Treatment Rule Bob Clement Drinking Water Program U.S. EPA Region 8.
Water Treatment System Design for Cinnamon Creek Campground Nomads Engineering: Achit-Erdene Gankhuyag Cuyler Frisby Kevin Wagner.
Water Treatment for NYC Croton Schematic. NYC Filtration Plant for Delaware and Catskill Systems  Filtration avoidance criteria  Alternatives to Filtration.
Math for Water Technology MTH 082 (pg. 468)
Water Treatment for NYC Croton Schematic. NYC Filtration Plant for Delaware and Catskill Systems ä Filtration avoidance criteria ä Alternatives to Filtration.
NYC Filtration Plant for Delaware and Catskill Systems ä Filtration avoidance criteria ä Alternatives to Filtration? ä Where should the plant(s) be located?
1 Role of Information Technology in Water and Wastewater Management From Water Quality, Performance & Technical Information Management to Finance and Asset.
1 Chlorine Contact Time / Virus & Giardia Log Removal Credit Calculations The EPA Guidance Manual on the Surface water Treatment Rule and Disinfection.
Long Term 2 (LT2) Enhanced Surface Water Treatment Rule
Effective Use Of Peracetic Acid to Reduce Effluent Disinfection Byproduct in Water Resource Recovery Facilities Isaiah Shapiro, EIT Dimitri Katehis PhD,
1 Long Term 2 Enhanced Surface Water Treatment Rule – LT2 Mark McIntire Drinking Water Program SDWWA Water Seminar February 7, 2006 Please ask questions.
Revised July 2015 Safe Drinking Water Program.
March 31st and April 1st, 2009Mile High Industrial and Automation Conference The Challenges in Upgrading Plant Automation for an Existing Wastewater Treatment.
USEPA Regulations By Douglas Rittmann, Ph.D., P.E. Water/Wastewater Consultant Presented to Entrepreneurs Association of Bari.
Equus Beds ASR Program – Wichita’s Future Water Supply September 6, 2012.
Chicago Department of Water Management Thomas H. Powers, P.E. Commissioner Leadership Summit June 2, 2015.
2015 Needs Assessment Our Strategy for Success Scott Torpie Washington State Office of Drinking Water.
Water System Planning Study
Cortez Sanitation DistrictSeptember 2002 Arber Cortez UV Disinfection Steven M. Ravel, P.E. Travis E. Meyer, P.E. Richard P. Arber Associates.
Cheri Cousens, P.E. – Executive Director September 15, 2010.
Michael Tamblin, P.E., BCEE Stearns & Wheler, LLC Protecting and Enhancing the Ramapo Watershed – A Designated Sole Source Aquifer Supplying New York and.
SPWSTAC 2006 From POU to Centralized Arsenic Treatment: A Small Water System Case Study 2006 NGWA Naturally Occurring Contaminants Conference J. Mitchell.
Compliance Strategies for Stage I & II DBPR 4 Case Studies William Bellamy CH2M HILL.
Ultraviolet (UV) Disinfection in Water Treatment
Community Water Supply Efficiency Improvements Potential Savings for the 6 th Power Plan September 30 th, 2008 Regional Technical Forum.
Effective Project Planning, Community Capacity Building, & Partnership Development in Indian Country LT Bradley Sherer Environmental Engineer Indian Health.
Dr. Joel J. Ducoste, North Carolina State University, 1 Importance of water “Water is life” Looking at water, you might think that it's the most simple.
Committed to providing safe, high quality water and related business services earning customer trust and confidence. Louisville Water Company Capital Program.
$200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 MCLsMonitoring RulesReporting.
Washington’s Water Use Efficiency Rule May Require Increased Coordination for Many Utilities Dan Sander, P.E. Senior Engineer.
Short and Long Range Water Supply Planning and Aquifer Performance Test (APT)
Fatemeh Alighalehbabakhani Carol J. Miller Shawn McElmurry S. Mohsen Sadatiyan A.
Community Water Supply Efficiency Improvements Preliminary Potential Estimates for the 7 th Power Plan November 18, 2014.
All About Sanitary Surveys David Edmunds Environmental Program Specialist ADEC Drinking Water Program Sustained Compliance: What It Means to Public Water.
WATER TECHNOLOGIES FOR RURAL TEXAS OFFICE OF RURAL COMMUNITY AFFAIRS Cryptosporidium: Technologies for Disinfection, Particulate Removal & By-Product Management.
Water Analysis & Control. Water analysis & control WATSAN M15 ERU 2 Contents 1.Chemical parameters and ranges 2.Water sources: Sampling procedures 3.Laboratory.
Developing the 2013 Israeli Guidelines for UV Disinfection Facilities for Drinking Water: Submitting a plan, operating and monitoring Dganit Eichen National.
Community Water Supply Efficiency Improvements Preliminary Potential Estimates for the Seventh Power Plan October 14,
Trojan UV Swift SC. Introduction Designed to meet the needs of the small community, the TrojanUVSwift™SC is ideally suited for smaller flow applications.
Trojan UV Swift. Introduction The TrojanUVSwift™ Municipal Drinking Water system offers proven performance against waterborne pathogens including viruses,
Water System Master Plan & Rate Study City of DeKalb, Illinois City Council Presentation May 16, 2015.
December 10, 2009 TOWN OF PALM BEACH WATER COMMITTEE Discussion of Water Plant Options.
Jervis Inlet Resort & Spa INFRASTRUCTURE OVERVIEW.
Tools to Control Energy Use through O&M Practices Wastewater/Water Sustainable Energy Cohort, October 11, 2012 Presentation by Walt Mintkeski, P.E.
Potable Reuse in Texas Where Are We Now? Joel Klumpp Texas Commission on Environmental Quality Potable Reuse in Texas Where Are We Now?
Lecture (11): Water Distribution Systems
Recycled Water Project Basis of Design Report
Public swimming pools and spa pools
Drinking Water State Revolving Fund and Performance Based Infrastructure Janet Cherry, PE Office of Drinking Water.
Practical Experiences with UV and Ozone
Treatment – Chlorine Disinfection
COMPANY INTRODUCTION 2010.
FY Proposed Budget and Rates Water Transmission System
An Innovative Approach for Increasing Lift Station Pumping Capacity
Treatment – Ultraviolet (UV)
October 29, 2018 Terry Lauritsen, P.E.
Presentation transcript:

UV Disinfection for Unfiltered Surface Water Regulatory Compliance Kevin Castro, PE | GHD Image placeholder

UV Disinfection for Unfiltered Surface Water Regulatory Compliance Kevin Castro, PE | GHD

2013 NYC Watershed/Tifft Science & Technical Symposium Presentation outline Background Regulatory Requirements Water Quality Basis of Design Procurement/Construction Benefits/Results Lessons Learned Questions Image place holder

2013 NYC Watershed/Tifft Science & Technical Symposium Village of Skaneateles, New York Village demands –0.6 mgd average daily demand –1.2 mgd maximum daily demand –2.0 mgd pump capacity Served off City of Syracuse Skaneateles Lake supply FAD since log giardia inactivation through chlorination (using City of Syracuse chlorination) Population served ± 3,000

2013 NYC Watershed/Tifft Science & Technical Symposium Skaneateles/Syracuse water supply system

2013 NYC Watershed/Tifft Science & Technical Symposium Regulatory requirements SWTR –1991 FAD –3 log giardia inactivation through chlorination –4 log virus inactivation through chlorination –Contact tank and contact transmission main constructed 1995 LT2ESWTR –2 or 3 log cryptosporidium inactivation –Two barriers: UV/Cl2

2013 NYC Watershed/Tifft Science & Technical Symposium Water quality Turbidity –Average = 0.8 NTU –Range = 0.5 to 10 NTU –Syracuse intake shutdowns control turbidity UVT –Average = 97% –Minimum value = 92% –ICR = 96 to 98% –Limited historical data –Design Range = 90 to 98% Cryptosporidium –1 oocyst detected since log cryptospordium inactivation required Fouling Potential - Low Image place holder

2013 NYC Watershed/Tifft Science & Technical Symposium Basis of design 2 log cryptospuridium inactivation = 5.8 mJ/cm2 3 log giardia inactivation = 11 mJ/cm2 Designed for 3 log giardia inactivation UVT – 90% minimum -95% average Turbidity < 10 NTU Lamp Technology – Medium Pressure or LPHO Two 100% redundant UV reactors

2013 NYC Watershed/Tifft Science & Technical Symposium Basis of design (cont’d) Max flow = 2 mgd Ave flow = 1 mgd Min flow = 0.5 mgd Reduce giardia chlorine contact time requirements Max headloss – 7 inches Improved monitoring (UVT, Turbidity, Cl2)

2013 NYC Watershed/Tifft Science & Technical Symposium Procurement Preselection vs. pre-purchase Preselection approach chosen to give contractor ultimate responsibility for system performance. Life cycle cost bid -Equipment costs -Lamp/ballast costs -Power costs

2013 NYC Watershed/Tifft Science & Technical Symposium Procurement Procurement results Trojan awarded selection Equipment PV – Lamp Replacement PV – Ballast Replacement PV - Annual Power Total Life Cycle Cost Svern Trent$121,594$5,173$14,200$9,884$150,851 Trojan$117,000$21,460$5,976$8,045$152,481 Calgon$141,860$9,079$5,970$9,986$166,895

2013 NYC Watershed/Tifft Science & Technical Symposium Construction Space available with BPS Pump replacement * VFDs provided * -Reduce pump flow to 1 mgd (90% speed) -Reduce pump energy cost by $4,000/year -Reduce pump starts to < 4/day -Eliminate cavitation of pumps on low lake level SCADA for monitoring/control/reporting *Provided through ARRA grant Image place holder

2013 NYC Watershed/Tifft Science & Technical Symposium Construction UV Disinfection UV Controls

2013 NYC Watershed/Tifft Science & Technical Symposium Construction Pumps Image place holder SCADA

2013 NYC Watershed/Tifft Science & Technical Symposium Construction Turbidity/Chlorine/UVT Monitoring Image place holder Chlorine Booster System & Monitoring

2013 NYC Watershed/Tifft Science & Technical Symposium Results/ benefits 2 log cryptosporidium inactivation – compliance 3 log giardia inactivation through UV/Cl2 4 log virus inactivation through Cl2 Use transmission main and contact tank for improved fire protection (currently under development) Reduced pump starts to < 4/day Reduced energy/cost for pumping Improved monitoring/reporting of CT, turbidity, Cl2 residual < 0.1% off-spec water since March 2012

2013 NYC Watershed/Tifft Science & Technical Symposium Lessons learned Validation layout ≠ Approved layout Alarm management during maintenance -Nuisance alarms during lamp and UVT transmitter maintenance Preselection was effective procurement approach Avoid pre-preselection design layouts ($$) Define distances for power/instrumentation cabling LT2ESWTR allows off-spec water

2013 NYC Watershed/Tifft Science & Technical Symposium Questions? Please contact Kevin Castro at

2013 NYC Watershed/Tifft Science & Technical Symposium