SES ll and SESAR -Presentation to BBGA Annual Conference Brian Humphries CBE President EBAA 12 Mar 2013.

Slides:



Advertisements
Similar presentations
Performance Review Commission, and performance management of the European ATM system Keith C. Williams, Chairman PRC.
Advertisements

UNIVERSITY of GLASGOW A Comprehensive Approach to ATM Incorporating Autonomous Aircraft ATM Research Group University of Glasgow.
17th February 2004: Slide 1 DG Transport and Energy OATA Workshop 17th February 2004 European Commission OATA and the Single European Sky.
27 June Report on two themes: Airport Management Weather & Environment by: Jan Terlouw (NLR) ATM 2003 Seminar, Budapest June 27, 2003.
ASAS TN Second Workshop, 6-8 October 2003, Malmö ASAS-TN Implementation Strategy Plan Tony Henley BAE SYSTEMS.
Episode 3 Operational Concept Detailing Episode 3 - CAATS II Final Dissemination Event Ros Eveleigh & Eliana Haugg EUROCONTROL & DFS Episode 3 Brussels,
Continuous Climb Operations (CCO) Saulo Da Silva
1 Data Link Roadmap Overview Mike Shorthose, Helios Technology Jorge Grazina, European Commission 25 September 2002.
SESAR and ASAS Opportunity
Marc Baumgartner FANS Committee EATCHIP 1996 Free Route ATM Global concept WTT 2002.
The Next Generation Air Transportation System “The Near Term and Beyond” Presented by Charles Leader, Director Joint Planning and Development Office.
Ames Research Center 1October 2006 Aviation Software Systems Workshop FACET: Future Air Traffic Management Concepts Evaluation Tool Aviation Software Systems.
Mr. Hooper Harris FAA/JAA Annual Meeting Phoenix, AZ June 3 - 7, 2002
The European Organisation for the Safety of Air Navigation Ian Middleton, Deputy Director EUROCONTROL - Directorate Single Sky Amsterdam, 27 April 2012.
Presented to: MPAR Working Group By: William Benner, Weather Processors Team Manager (AJP-1820), FAA Technical Center Date: 19 March 2007 Federal Aviation.
Gate-to-Gate Project: Implementing Sequencing, Merging, and Spacing Captain Bob Hilb September 11, 2006.
International Civil Aviation Organization Block 0 Overview Halidou Moussa Air Navigation Commissioner International Civil Aviation Organization.
. Center TRACON Automation System (CTAS) Traffic Management Advisor (TMA) Transportation authorities around the globe are working to keep air traffic moving.
Rob Eagles Director ASIA PACIFIC Safety, Operations & Infrastructure.
Study Continuous Climb Operations
SESAR Single European Sky Air traffic management Research
The SESAR Target Concept of Operations ASAS Related Aspects
FASVIG Introductory Meeting
Enav.it Channelling Finance and Innovation to Industry Steps towards the Air Traffic Management system modernisation.
Frank Brenner Director General, EUROCONTROL European ATM Israel Civil Aviation Conference, 18th November 2013.
ATM Conference, Oslo May 19 th, 2015 ATM Master Plan 2015 Consequences for cost, safety, performance and environment.
Regional ATFM in Europe
Page Lufthansa ASAS It's Time for a paradigm change... Workshop May 2003, Rome
Can our ATM systems cope?
ASAS-TN Second Workshop, 6-8 October 2003, MalmöSlide 1 Airborne Surveillance Applications included in ‘Package I’ Francis Casaux CARE/ASAS manager.
Cost effective ATM – from the perspective of airspace users Torbjørn Lothe, ATM Conference 19 May 2015.
CARE/ASAS Validation Framework Guidelines & Case Studies Mark Watson NATS.
ASAS FRA OB/T ATM Projects Lufthansa point of view.
Emerging Issues for Air Navigation Service Providers Rudy Kellar Vice President, Operations NAV CANADA September 2007.
Performance Based Navigation (PBN) Canadian Implementation Presentation to Air Transport Association of Canada 9 November 2010.
Draft High Level Operational Concept V0.4 Mode of Operation for the Single European Sky Deployable from /11/04.
- Session 4: Interoperation José M. Roca Air/Ground Cooperative ATS Programme Eurocontrol.
Containing Aviation Emissions in the Short-term
Ames Research Center 1 FACET: Future Air Traffic Management Concepts Evaluation Tool Banavar Sridhar Shon Grabbe First Annual Workshop NAS-Wide Simulation.
Direction générale de l’Aviation civile centre d’Études de la navigation aérienne First ASAS thematic network workshop The user’s expectations and concerns.
KLM - Operations at Schiphol: how does ASAS fit? ASAS TN2: final seminar, April, Paris E. Kleiboer Sr. Manager Strategy ATM.
MFF is a EC co-funded programme Rome, 3-5 Aprili 2006 ASAS-TN2 Rome, 3-5 April 2006 Maurizio Zacchei, ENAV (MFF PM) Mediterranean Free Flight Programme.
EUROCONTROL European Organisation for the Safety of Air Navigation.
Federal Aviation Administration AP23 briefing on D3: ASAS Concept of operations ASAS-GN Seminar 13 Nov 08, Rome By Ken Carpenter, QinetiQ.
DIRECTION TECHNIQUE CERTIFICATION Paris, April 2008 SL ASAS TN2 Workshop ppt ASAS & Business.
1 European Organisation for the Safety of Air Navigation Jan Van Doorn Director EUROCONTROL Experimental Centre April 2006 ASAS / ADS-B: Implementation.
C-ATM User Group and ASAS…….. Presented on Behalf of the C-ATM User Group Billy Josefsson, LFV Group ASAS Thematic Network 2, Malmö /28.
2 nd Workshop, April 2006 ASAS in Tomorrows Airspace Pierre Gayraud, THALES Bob Graham, EEC Tony Henley, BAe Systems Dr Anthony Smoker, IFATCA ASAS-TN2.
1 ILA Berlin - May 2008 Marc Brochard - EEC EPATS ATM General Requirements & relative issues to be solved.
The European Organisation for the Safety of Air Navigation SES Implementing rules on surveillance EBAA, CNS/ATM AG 6, Brussels. 17 th November 2010 Presented.
1 Airborne Separation Assistance Systems (ASAS) - Summary of simulations Joint ASAS-TN2/IATA/AEA workshop NLR, Amsterdam, 8 th October 2007 Chris Shaw.
SSAP The European Strategic Safety Action Plan (SSAP) The History & Rationale.
14/01/20161 Air Traffic Management Panel Madrid May 2002 AVIATION OPERATIONAL MEASURES FOR FUEL AND EMISSIONS REDUCTION WORKSHOP HOW TO SAVE FUEL.
Guidance and Control Programs at Honeywell Sanjay Parthasarathy Honeywell Aerospace Advanced Technology October 11, 2006
ASAS Crossing and Passing Applications in Radar Airspace (operational concept and operational procedure) Jean-Marc Loscos, Bernard Hasquenoph, Claude Chamayou.
19-21 April 2004ASAS TN – 3 rd workshop AIRLINES/IATA OVERVIEW Needs and Considerations Anthony van der Veldt/IATA Assistant Director Safety Operations.
A consolidated starting point from DFS / AENA / LFV ASAS Thematic Network Workshop Toulouse, Is ASAS /ADS-B needed for ANSP strategy?
Worldwide Symposium on Performance of the Air Navigation System, Montreal, 29 March RNA and RNAV and RNP Strategy in Japan Yoshiki Imawaka Director.
Programme Status ECTL AAB February FACTS  A mature approach: 2500 contributors Release process organises the delivery cycle ATM Engineering:
1 EUROCONTROL S TRATEGIES FOR The ATM Strategy for the Years As from MATSE/6 decision (Jan. 2000): To cater for forecast increase in demand.
1 Introduction of EGNOS operations: the perspective of an Air Navigation Service Provider METIS Workshop Benefits of EGNOS in Civil Aviation Istanbul 18.
Digital In The Skies Simon Daykin NATS Chief Architect.
Larry Ley | Digital Aviation | Boeing Commercial Airplanes
IFATSEA General Assembly Keynote address Berlin, Germany November 2015
Continuous Climb Operations (CCO) Saulo Da Silva
PROGRESS & CHALLENGES ATCOS’ VIEWS
Continuous Climb Operations (CCO) Saulo Da Silva
Aviation Innovation for Regional Integration
4D Trajectory Management
ROMATSA – SAFETY, EFFICIENCY AND ENVIRONMENTAL PERFORMANCE IN ATM
Presentation transcript:

SES ll and SESAR -Presentation to BBGA Annual Conference Brian Humphries CBE President EBAA 12 Mar 2013

SINGLE EUROPEAN SKY SES II

An SES Mess SES is a pan-European project to achieve a harmonised and efficient European airspace, benefitting European mobility, competitiveness and the environment. Initiative includes organising airspace into functional blocks, according to traffic flows rather than to national borders. It has been +10 years since the Commission first adopted proposals for SES All initiatives have, so far, failed to deliver November 2000Establishment of SES regulation June 2008SES-II regulation adopted. It is more performance-oriented: Performance Scheme Functional Airspace Blocks The Network Manager The Charging Regulation February 2013SES II+ European Commission developing a new legal framework concerning the performance and charging scheme for air navigation services for

“SES is too important to be allowed to fail. We have fallen seriously behind in our original ambitions. After more than 10 years, the core problems remain the same: too little capacity generating the potential for a negative impact on safety at too high a price. There are some signs of change, but overall progress is too slow and too limited. We need to think of other solutions and apply them quickly. There is too much national fragmentation. Promised improvements have not materialized.” – Vice-President Siim Kallas, European Commissioner for transport, 11 October 2012

Where We Stand Today EU is taking a majority of states to EU court for failing to deliver on FABs Airspace users have filed lawsuit against Eurocontrol Member States for excessive route charge payments EU Commission to have final vote on 2nd draft Regulations on performance scheme and charging… and it’s not looking good

SESAR GOALS & OBJECTIVES

SESAR Objectives & Schedules OBJECTIVES  To triple the traffic  To reduce route charges by 50%  To improve safety by a factor 10  To reduce emissions by 10% SCHEDULE Deployment in three steps IP12010NowGen (2010) IP22018Mid-term in NextGen ( ) IP32020Far-term in NextGen ( ) THE BEST WAY TO PREDICT THE FUTURE IS TO CREATE IT (Peter Drucker ) THE BEST WAY TO PREDICT THE FUTURE IS TO CREATE IT (Peter Drucker )

Business Aviation Vision SAFETY FIRST  Elimination of non-precision approaches  Non-controlled airspace to become controllable MINIMISE IMPACT ON AIRLINE TRAFFIC  Operate above airliners (above ft)  Develop “wake vortex free“ approaches to increase runway throughput OPERATE IN HARMONY WITH LIGHT AVIATION  By promoting an ADS-B adapted to GA (UAT) MITIGATE NOISE NUISANCE TO AIRPORT RESIDENTS  Special procedures (steep & curved approaches)

Benefits for Business Aviation SAFETY  With ADS-B TMA of local airports are becoming "controllable"  ASAS self separation, virtual tower, dynamic airspace allocation  In low density airspace (above FL410, desert areas)  Developments of "cooperative self separation"  Elimination of non-precision approaches (LPV SBAS on any runway) ENVIRONMENT  Cruise climb and Continuous Descent Approach “CDA" (in SBAS mode)  Development of special procedures to mitigate noise nuisance OPERATIONS  Complete flight plan optimisation (business trajectory)  "Free flight" in "cruise climb" all over Europe  "3D pseudo ILS" down to 200 ft on any runway  Possibility to operate to CAT2/3 for EVS aircraft equipped

4D BUSINESS TRAJECTORY VERSUS INITIAL 4D

4D Business Trajectory – BusAv Vision PURPOSE & OBJECTIVE  User selects and negotiates flight profile (trajectory, flight levels, speed)  ATC facilitates Reference Business Trajectory (RBT)  User owns Reference Business Trajectory  4D RBT allows user to follow flight profile CONFLICT MANAGEMENT  ATC based on “A/C real time positions”  “4D RBT” & “last Wind/Temp forecast” predicts potential “conflicts” up to one hour in advance  ATC offers “strategic separation” by flight level or trajectory changes  ATC offers “tactical separation” by lateral deviations  Today under ATC control (minimum separation 5 nm)  Tomorrow by delegation of the separation to the pilot (ADS-B & ASAS) down to 3 nm (*) * a 3nm lateral deviation, initiated 5 minutes before the conflict, induces a delay of only 2 seconds

Initial 4D & Required Time of Arrival (RTA) Likely Impact RTA FUNCTIONALITY  Need to transmit aircraft trajectory data to all enroute ANSPs – CPDLC and ADS-C?  Prediction based on aircraft speed, flight plan, and predicted wind/temperature conditions  RTA accuracies will depend on accuracy of wind data  Certification conditions not yet defined (no AMC currently available)  RTA will probably be only certified as “advisory” BENEFITS & DRAWBACKS  Should improve prediction of arrivals and aircraft sequencing  Has to be provided only to aircraft which are on dedicated track (not affecting the others)  Will not be certified as “primary means of separation”  Will require specific pilot training  Expensive (especially if we have to change the FMS)  A prerequisite to RTA is to put in place a weather data broadcast facility (wind/temp)  Weather data used by aircraft and ATC must be accurate and the same

4D RBT vs Initial 4D WHAT USERS NEED FOR 4D RBT  Tools to use 4D RBT (network, sectors)  Tools to predict aircraft conflicts and arrivals  Aircraft position (ADS-B), flight plan based on RBTs, unique real-time wind/temp model  To keep ATC stability, aircraft will have to follow RBTs RISKS FOR USERS OF i4D  i4D used in cruise conditions likely to generate instability in conflict management  i4D will require additional pilot / ATC dialogue, Increasing rather than reducing ATC workload  i4D will not permit redefinition of ATC sectors around the traffic axes  i4D likely to prevent operators flying their requested 4D RBT  i4D will have a real cost impact on users (avionics and services e.g. need for VERY accurate weather data)  i4D onboard navigation needs three prerequisites : PBN, ADS-B, weather broadcast  COST?

Risks of the proposed solution  Too much focus on time constraints which could destabilise the network & ATM predictions  EBAA seeking single constraint ONLY for arrival sequencing - NOT for separation  I4D would be linked with extended arrival managers at major hubs potentially affecting all aircraft in the airspace even those not flying to hubs  EBAA opposing the prioritisation of ‘regulated’ flights over aircraft not flying to hubs  Technologies needed are expensive

OUTLOOK – DISAPPOINTING!! THANK YOU