CASE STUDY NAVAL WEAPONS CENTER ROCKET FUEL LOADER.

Slides:



Advertisements
Similar presentations
© Copyright QinetiQ limited 2006 Objectives of Coding Standards & MISRA C++ Clive Pygott, Systems Assurance Group, QinetiQ Chris Tapp, Keylevel Consultants.
Advertisements

Independent Laboratory Testing PART 6 Regulations Wayne Colley Electrical Safety Division Electrical Engineer.
Name: ___________________________________ I filled _______________________’s bucket today. I filled a bucket by _________________________ _________________________________________.
Experiment 7 The Gas Constant. Purpose and Goals To determine the gas constant R, by collecting H 2 produced when a known amount of Mg reacts with acid.
Box Label System.
Bob cat Skid steer loader
Detaching the Loader from the Tractor 1). Place Bucket Leading edge on the ground and position point ‘A’ 20cm to 30cm from the ground. 2). Lower and adjust.
Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display. Chapter 10 Trucks and Hauling Equipment.
TRUCKS THE MOST COMMON HAULING EQUIPMENT USED FOR MILITARY CONSTRUCTION SITE ARE 2 1/2, 5, AND 20 TON DUMP TRUCKS. THE HAUL CAPACITY CAN BE EXPRESSED.
Neoteric Technology Ltd – All Rights Reserved - © 2006
Job Element Sheet Process: Cheesecake Bake – Dropper Process Author: Andreana Crance, RIT MSD Date/Revision: 2/5/10, Rev 0 1. Obtain dropper2. Set up dropper.
Direct Line Supply Offers Weigh Shark Digital Belt Scale Internal Speed Sensor Proven Technology That Works! Click to Advance.
Crane Operations Objective
Innovative Outreach Ideas: How to Serve Communities without Library Buildings.
II. Linear Block Codes. © Tallal Elshabrawy 2 Last Lecture H Matrix and Calculation of d min Error Detection Capability Error Correction Capability Error.
ISOLOK® Liquid/Slurry Automatic Samplers
Analyzing the Pneumatic Reservoir Building a Mathematical Model of The Interior Volume of the Reservoir.
1 Determining Mass Mass is a direct measurement of the amount of matter in a sample.
Weight and Balance. Weight Aerodynamic Stability Control Overall Performance.
Illinois Institute of Technology
CE 230-Engineering Fluid Mechanics Lecture # 6 Basics of Fluid Statics.
SOFTWARE DEVELOPMENT DOCUMENTATION. INTRODUCTION Documentation can be tied into the entire software development cycle. Unfortunately, documentation is.
General Troubleshooting Tips.
Facilities ESR Electronic Service Request. Use the ESR to do the following: Submit a service request electronically to the facilities department Submit.
© SEESAC, 2006 Reducing Risk During SALW Collections Name Organisation Location, Event, Date.
Solar Cell Fundamentals Lab All safety rules to be followed at all times Full gowning is required when working in the clean room The clean room will only.
Exact and Inexact Numbers. In scientific work, numbers are groups in two categories: exact numbers and inexact numbers. An exact number is a number that.
HVACR116 – Trade Skills Longest length method.
Testing 1 © Minder Chen, Source: Developing Web Applications with Microsoft Visual Basic.NET and Microsoft Visual C#.NET Testing Test plan objectives.
Ultima ® X Gas Monitor with HART Display Version.
© Janice Regan, CMPT 300, May CMPT 300 Introduction to Operating Systems Memory: Relocation.
BEGINNING MULTIPLICATION BASIC FACTS Multiplication is REPEATED ADDITION. It is a shortcut to skip counting. The first number in the problem tells.
Pseudo CCV System System Diagram Bracket Diagram 50hr oil and carryover add procedure Observations and Background.
Notes from Basic Lab Methods for Biotech by Seidman Weighing Materials Proper use of balances.
INCORPORTION OF SCIENCE IN THE FIRST WEEK OF 5 TH GRADE.
E VERY L IFE H AS A P URPOSE… 9010 / 9020 Controller.
1-2 Adding and Subtracting Decimals Ex 1.) Steps: 1.) Write the numbers vertically and line up the decimal points. 2.)Add zeros if needed.
A project to find the main cause of rejected x-rays.
Confidential – For Internal Use Only QUANTOS PRISTIMA Automated Capsule weighing April 2015 Chris Wood.
RAILER SMS Track Inspection Version
1 Module 4 Support Systems. 2 Terminal Objectives Upon the successful completion of this module, participants will be able to explain methods organizations.
By: Ryan and Drew.  Armament (weapons): None  Engines: Two Pratt and Whitney J58’s (each weighing 6,000 lbs.)  Maximum Speed: Mach 3.2 (3.2 times the.
Module 6 ********* Data Loading Workforce Information Database Training Last update November 2006.
Federal Service for Environmental, Industrial and Nuclear Supervision LEGAL REQUIREMENTS ON EXPLOSION PROTECTED EQUIPMENT FOR THE GAS AND PETROLEUM ACTIVITIES.
Dinga.com.au : Angling Equipment at Australia’s Lowest Prices! Featured Product $
Chair of Software Engineering Void safety these slides contain advanced material and are optional.
Louisiana State University Radiation Safety Office
President & CEO Nautilus International
Batch Functionality SAVING TIME WITH DATA ENTRY.
Load Balancing: List Scheduling
Batch Functionality SAVING TIME WITH DATA ENTRY.
'. \s\s I. '.. '... · \ \ \,, I.
Air Carrier Continuing Analysis and Surveillance System (CASS)
Precast Concrete Pipe and Box Culvert Equipment Calibration
Electrical Safety Standards
BRF Naval Safety Center Seconds.
7.3 Notes Earthquake Safety
PS 3 Mαths Section A: Q mins Section B: Q mins
Regional Center for Talented Youth Belgrade II
' '· \ ·' ,,,,
Correcting Assignment #24 (6, 7, 11-15, 19-24, 27, 29, 31-32)
Bingo Example: Design (Fill Card Algorithm)
Solving Absolute Value Inequalities
Satellites!!.
Day 2 Training - Technical
Group Structure Water Weights Special Projects Engineering Services
Load Balancing: List Scheduling
Exp H2 Generator ATEX approved Hydrogen Generator
Presentation transcript:

CASE STUDY NAVAL WEAPONS CENTER ROCKET FUEL LOADER

REQUIREMENT: LOAD ROCKET FUEL MODULES REMOTELY IN CLASS I DIV II ENVIRONMENT, ALL ELEMENTS REQUIRED TO BE INTRINSICALLY SAFE/EXPLOSION PROOF.

ACTIONPAC DESIGNED SYSTEM TO RIGHT ANGLE INDEX SS LOADING CONTAINERS FOR 1000g FILLS OF RED PHOSPHORUS WITH +/- 200mg PRECISION. ALL FEEDERS, CONTROLS, INDEXING EXPLOSION PROOF/INTRINSICALLY SAFE WITH POSITIVE PRESSURE NEMA 4X ENCLOSURE AND SAFETY BARRIER. REMOTE KEYPAD OUTSIDE ROOM OPERATES SYSTEM. CONTAINERS ARE INDEXED INTO POSITION, FILLED, INDEXED OUT.

ALSO EQUIPPED WITH ZERO VERIFY FEATURE, ITEM/FILL RECORDER WITH STRIP PRINTER AND RECORDING SOFTWARE. ZERO VERIFY, SIMPLY PUT, MEANS THAT DROPPED WEIGHTS ARE VERIFIED ABSOLUTELY. IF THE EMPTY WEIGH BUCKET CAN BE SHOWN TO BE AT

ZERO, THEN THE PREVIOUS WEIGHT BY EXTENSION MUST CONFORM TO THE TARGET. VALIDATION TEST RESULTS: ZERO ERRORS IN 1000 CYCLES.