Data Collection Device (DCD) Job Aid – Burn-in In DOIS Log onto DOIS. Click Options on the DOIS menu bar. Click on Utilities. Click DCD Software Burn-In.

Slides:



Advertisements
Similar presentations
Data Collection. Status LEDs 5 MP Camera Touch Screen GNSS Receiver Light Sensor SD Card Slot.
Advertisements

Creating & Editing Tables Keyboarding 1A. To Create a Table: From the Menu Bar, select Table select Insert select Table Type in the number of columns.
3.60 CEREC Connect Lab Import
SDReader6 An Overview on Use and Functionality. Initial Setup Open the SDReader6 program from the shortcut placed on the desktop Click on Configuration.
JED Microprocessors Pty Ltd Presenting the JED T430 low-cost Projector Controllers Nov 22nd, 2009.
 Very dominant in terms of market share.  Is 7.4% of smartphone market share. 60% of all Android devices globally.
Components: Sansa Clip Mp3, earbuds, USB cable, Quick Start Guide.
Reprogram the DAGR and Maps Installation
Copyright © 2005 Rockwell Automation, Inc. All rights reserved. 1 Micro Logix 1100 RSLogix 500 LAB#2 Timing, Counting & Comparing.
LogTag Training January 2015
AUDIO VISUAL TRAINING University Center. BLACK BOX EQUIPMENT IN CLASS University Center LCD Projector/Built In Screen Laptop Connection (VGA Cord) Control.
DAP-1520 FAQ’s Wireless AC750 Dual Band Range Extender.
Windows 7. Objectives After completing this lesson, you will be able to: oExplain the common functions of an operating system. oIdentify the basic components.
XP Tutorial 9 New Perspectives on Microsoft Windows XP 1 Microsoft Windows XP Exploring Your Network Tutorial 9.
How to Program the Bypass Tray on most Sharp Models.
Introducing the Canon Powershot 410 Digital Still Camera Click to advance to the next page.
The Way to Success … Sta rt Sta rt Ak Technologies Mo | Visit.
Hard Drive Information Module Hard Drive Information Module.
General Overview and Primary Functions. Introduction This presentation will help you quickly find some of the features of the GPSMAP295 and the procedure.
Welcome to the Computer!
Data Collection Device (DCD) Job Aid – Hot Keys / Short cuts For all DCD programs: - Turns on the backlight for the DCD screen for about 15 seconds. -
DEMONSTRATION FOR SIGMA DATA ACQUISITION MODULES Tempatron Ltd Data Measurements Division Darwin Close Reading RG2 0TB UK T : +44 (0) F :
Add contacts and prospects and link contacts to clients and case files. A new generation of practice management software Follow the on-screen instructions.
1 Starting & Stopping Motors Pico Pico LAB#4. 2 Program a series of three basic ladder logic rungs. These basic rungs are the most common rungs found.
DWR-113 FAQ’s 3G WiFi Router.
1 Chapter 2 ROUTER FUNDAMENTALS By: Tassos Tassou.
For SharePoint 2010 In This Presentation: Connect Overview Connect Requirements Connect Installation Connect Initial Launch Explore SharePoint Upload.
Downloading and Installing PAF Insight PAF Insight can be easily downloaded Or can be installed from a CD A license is needed t0 activate the program.
Configuring the MagicInfo Pro Display
MagicInfo Pro Server Software All control, content, and scheduling is performed within the MagicInfo Pro Server software previously installed. Before.
TrekView DMS Instructions. 1. Log in to TrekView DMS.
© 2009 FP Mailing Solutions. All rights reserved. Customer Service Training Basic Computer Training.
ICP Kit 2011 HHC Data Entry Module The World Bank ICP Kit Training African Development Bank.
Available at: – Operate the Tumbler using a Jumper Pin Operate the Tumbler using the jumper pin.
Scottsboro City Schools Technology Dept.. Connecting Video Camera to Encoder 1. Power Cable 2. Network Cable (Primary) 3. CVBS-Pb (Yellow - VGA cable)
Associate ® Mobile Windows Mobile Device Dictation Without Boundaries ™ ©2010 PortNexus Corporation. All rights reserved.
Using the PDA Links to each of the topics Go to next slide Intro to “Getting Started Changing iPAQ Settings -Setting the Time/Date -Changing Keyboard.
Geo CE-XM ch 4 Edited 10/14/05 1 The XM is the newest of the rovers, and unlike other units, it comes with software installed on the unit as well as using.
WINDOWS Part 1 – Start Up Basics
Navigation 3 GPS for ICS Data Transfer Review of DNR Garmin Uses Download Upload.
VistA Imaging Capture via Scanning. October VistA Imaging Capture via Scanning The information in this documentation includes only new and updated.
10/5/ InstantHMI Designed for Watlow Beam the Palm at your Watlow SD controller and voila!, you have a low cost HMI for Configuration, Diagnosis,
1 OrderPro Point of Sale (POS) Training Prepared by Christina Van Metre Independent Educational Consultant CTO, Business Development Team © Training Version.
Windows Tutorial Common Objects ACOS: 1, 4. Using the Taskbar 1. Using the taskbar, you can switch between open programs and between open documents within.
Vyew - Basic Tools Basic whiteboard tools are located on the left side of the window. Click on the “A” to type on the screen. Click on the yellow sticky.
Data Analysis in Excel 2007 A Visual Guide By Nick Evangelopoulos May 2007.
Router Fundamentals PJC CCNA Semester 2 Ver. 3.0 by William Kelly.
5/14/2003Sprint TekNet IP Train the Trainer1 Open TekNet Software If working at a client station, enter the IP address of the server and mark page as a.
JAZLER SHOW2 JAZLER SHOW2 AUTOMATION SOFTWARE. EASY PLAYBACK JAZLER SHOW2 AUTOMATION SOFTWARE Jazler Show is a program that lets you load audio files.
Microsoft Access 2010 Chapter 4 Creating Reports and Forms.
1 Micro Economix 1500 RSLogix 500 LAB#3 Sequencing and Subroutines.
TANDBERG VIDEO CONFERENCING SYSTEMS. CONTENTS USAGE OF REMOTE CONTROL INITIATE A POINT TO POINT CALL INITIATE A MULTIPOINT CALL DUO VIDEO SOME OTHER FEATURES.
After clicking the link, you will be taken to this page. Both the StudyCards™ and TI StudyCards™ Creator for Windows® needs to be downloaded. The first.
JDS5 Training Guide. On Start Up you will see this screen click the OK button Click OK.
Instructional E-Classroom Instructional Guide Seneca College, Audio-Visual Services.
Microsoft Office 2007 Excel Chapter 9 Part 4: Comparing and merging Workbooks.
AUDIO VISUAL TRAINING Wilkins Theatre-Black Box. BLACK BOX EQUIPMENT IN CLASS Black Box LCD Projector/Built In Screen Laptop Connection (VGA Cord) Control.
Section 4 The Basics of Windows 7. Windows 7 Versions  Home Premium  Professional  Specialized.
Saving and Retrieving Farm Areas. The farm area function enables you to save search results from the Search Results screen and save them for future use.
Hardware Configuration Guide Configuring Dongles and Creating Barcodes for Devices Used with VSC.
After Construction Name: Per #:.
NEWCNT Import/load option
Using the Lego Mindstorms Edu NXT Software
CS101 Booting A Computer.
MicroEconomix 1500 RSLogix 500 LAB#2
Oki Data Americas.
Computer Basics.
Conference room user manual
Timing Out Press “red dot” button to start.
Loading a Data Dictionary
Presentation transcript:

Data Collection Device (DCD) Job Aid – Burn-in In DOIS Log onto DOIS. Click Options on the DOIS menu bar. Click on Utilities. Click DCD Software Burn-In. Click either Capture Mail Volumes or Street Data Collection (Form 3999) In the DCD Perform Command Boot. Plug in power supply and connect to serial cable Press and hold and keys simultaneously. Press and release the key. Release all keys. (Screen should display Command Mode, Select Function, Self Test) Press the key twice. (Screen should display Select Function, Program Loader) Press the key. (Screen should display Warning: EEPROM will be erased. Continue?) Press the key. (Screen should display Comm Parameters, Baud, ) Press the key twice. (Screen should display Comm Parameters, Baud, ) Press the key. (Screen should display Data Bits, 7) Press the key. (Screen should display Parity, Odd) Press the key. (Screen should display Flow Control, None) Press the key once. (Screen should display Flow Control, Xon/ Xoff) Press the key. (Screen should display Comm Parameters, Start?) Press the key. In DOIS Click the DCD Ready button. In the DCD (Screen should display Program Loader, Receiving:) This process should take 60 – 90 seconds. (Screen should display Program Loader, Status 0000) In DOIS Click OK to DOIS message: DCD Burn-in process initiated. (Inspect DCD for successful load – STATUS 0000) In the DCD Turn the DCD off, and perform a cold boot to start the program. See Job Aid – Troubleshooting panel 4. In DOIS Log onto DOIS. Click Options on the DOIS menu bar. Click on Utilities. Click DCD Software Burn-In. Click either Capture Mail Volumes or Street Data Collection (Form 3999) In the DCD Perform Command Boot. Plug in power supply and connect to serial cable Press and hold and keys simultaneously. Press and release the key. Release all keys. (Screen should display Command Mode, Select Function, Self Test) Press the key twice. (Screen should display Select Function, Program Loader) Press the key. (Screen should display Warning: EEPROM will be erased. Continue?) Press the key. (Screen should display Comm Parameters, Baud, ) Press the key twice. (Screen should display Comm Parameters, Baud, ) Press the key. (Screen should display Data Bits, 7) Press the key. (Screen should display Parity, Odd) Press the key. (Screen should display Flow Control, None) Press the key once. (Screen should display Flow Control, Xon/ Xoff) Press the key. (Screen should display Comm Parameters, Start?) Press the key. In DOIS Click the DCD Ready button. In the DCD (Screen should display Program Loader, Receiving:) This process should take 60 – 90 seconds. (Screen should display Program Loader, Status 0000) In DOIS Click OK to DOIS message: DCD Burn-in process initiated. (Inspect DCD for successful load – STATUS 0000) In the DCD Turn the DCD off, and perform a cold boot to start the program. See Job Aid – Troubleshooting panel 4. To load the routes file from DOIS: In DOIS Click Options on the menu bar Click on Utilities Click on DCD Configuration – Mail Volumes In the DCD Perform a cold boot (See Job Aid – Troubleshooting, panel 4 for details) Verify the date and time and press From the menu screen select for transfer In DOIS Click on the “Load Route Data” button to begin transfer When file is transferred, click “OK” to acknowledge successful transfer. In the DCD Screen will be back at the date and time screen, ready for use in recording volumes. To load the routes file from DOIS: In DOIS Click Options on the menu bar Click on Utilities Click on DCD Configuration – Mail Volumes In the DCD Perform a cold boot (See Job Aid – Troubleshooting, panel 4 for details) Verify the date and time and press From the menu screen select for transfer In DOIS Click on the “Load Route Data” button to begin transfer When file is transferred, click “OK” to acknowledge successful transfer. In the DCD Screen will be back at the date and time screen, ready for use in recording volumes. To load a 3999 from DOIS into the DCD: In DOIS on the Office side: Go to the Route & Unit Maint. tab on the Route side: From the selected adjustment, go to the Adjustment Workbench Instructions from here out are for both sides: Click on DCD Transfer Select Data Transfer from DOIS to DCD Select desired zip code if necessary Highlight desired route from left column and click right arrow to move to right. In the DCD From the Main Route Inspection Menu, select for download In DOIS Within 90 seconds, hit the “DCD ready” button (DCD screen will show that it is receiving data) Click “OK” to acknowledge successful transfer In the DCD Screen says “File Transfer Complete. Press a key...” Screen will be back at the main menu ready to begin the street inspection NOTE: A 3999 completed within the realm of a special or formal inspection MUST be uploaded on the route side of DOIS To load a 3999 from DOIS into the DCD: In DOIS on the Office side: Go to the Route & Unit Maint. tab on the Route side: From the selected adjustment, go to the Adjustment Workbench Instructions from here out are for both sides: Click on DCD Transfer Select Data Transfer from DOIS to DCD Select desired zip code if necessary Highlight desired route from left column and click right arrow to move to right. In the DCD From the Main Route Inspection Menu, select for download In DOIS Within 90 seconds, hit the “DCD ready” button (DCD screen will show that it is receiving data) Click “OK” to acknowledge successful transfer In the DCD Screen says “File Transfer Complete. Press a key...” Screen will be back at the main menu ready to begin the street inspection NOTE: A 3999 completed within the realm of a special or formal inspection MUST be uploaded on the route side of DOIS 1 2 3