Migrating a Gathering Company’s Pipelines from Legacy Datasets into an Enhanced PODS 3.2 Model Presented by Kenneth Greer – CenterPoint Energy Gas Transmission.

Slides:



Advertisements
Similar presentations
Sharing Infrastructure DNR is a large and diverse organization Management directives are all over the board Aspen trees to Zebra Mussles employees.
Advertisements

Workshop: Preventive Maintenance
Geospatial 09 Kathie Jewell April 29,2009 National Invasive Species Information Management System NISIMS.
Database Management Systems and Enterprise Software
KM Ticket Automation Process Flow Diagram. Local Components FC (Flow Computer) –Local proprietary computer that reads the meter. FDS (Field Data Server)
Gas Distribution Model >Presented to the PODS Association >Oct 28 th, 2010 >Alicia Farag.
Migration From Mainframe to SAS Enterprise Guide Reporting Migration From Mainframe to SAS Enterprise Guide Reporting A New Retention Process in IR Office.
Confidential Agenda sparesFinder introduction Key Issues Master data harmonisation – Cleansing process Item Management & Governance – Governance Issues.
Using GIS for Utility Mapping and Asset Management Sanitary Sewer, Storm Sewer, and Water Distribution City of Mason City Jessy Willadsen - Mason City.
Pipeline SIG PODS Pipeline Open Data Standard
Class 9 – April 27, 2012 An Abbreviated but Typical System Conversion Plan for a Medium-Sized Enterprise.
June 11, 2008West Virginia GIS Conference 2008 Integration of Mobile GIS Technologies in the West Virginia Department of Environmental Protection Bond.
Mapping the Gracelawn Cemetery Information Technology/GIS
PODS: a review and the patterns for implementation Janet Sinclair PODS Association.
Migrating 50,000 Miles of Pipeline Data to PODS 5.0Strategy Technical Issues Conclusions Overview.
Introduction to GIS Ghassan Mikati, Ph.D GIS Expert.
QA/QC: A Checklist for Quality and Control
Oct 31, 2000Database Management -- Fall R. Larson Database Management: Introduction to Terms and Concepts University of California, Berkeley School.
1 ACCTG 6910 Building Enterprise & Business Intelligence Systems (e.bis) Data Staging Olivia R. Liu Sheng, Ph.D. Emma Eccles Jones Presidential Chair of.
GIS in a nutshell Faris Alsuhail What is GIS? “A geographic information system (GIS) integrates hardware, software, and data for capturing, managing,
DOES YOUR DATA TALK TO YOU?. A NEW SOFTWARE PLATFORM FOR THE COLLECTION AND ANALYSIS OF ENVIRONMENTAL DATA.
EGEMS A Dedicated Web Based System for Ground Water Data Processing Analysis and Storage.
Welcome to CMPE003 Personal Computer Concepts: Hardware and Software Winter 2003 UC Santa Cruz Instructor: Guy Cox.
000000_1 Confidential and proprietary information of Ingram Micro Inc. — Do not distribute or duplicate without Ingram Micro's express written permission.
Introduction to GIS/GPS Mr. Canada World Geography Burris Laboratory School.
Lawson Healthcare Solutions Optimization of Key Resources Forms a Foundation for Excellent Patient Care.
Prepared by: Jennifer McKee With support from: in partnership with: Introduction to ArcPad NSF DUE
ETL for GIS - What's it all about? 2009 Ohio GIS Conference September 16-18, 2009 Crowne Plaza North Hotel Columbus, Ohio 2009 Ohio GIS Conference September.
L/O/G/O Metadata Business Intelligence Erwin Moeyaert.
October 23rd,  Road Centerline/Addresses Migration  Law Enforcement Data and Application Migration ◦ PCADS AVL Vehicle Locator (PCSO) ◦ QuickApp.
Announcements Homework 1 Due 9/15 Project: Step 1 Due 9/17 Reading for Wednesday –2.6 – 2.8.
The Utilization of GIS Technology at Northeastern REMC Presented By: Steven Weber, GISP Northeastern REMC (260)
IRIS Business Warehouse Legacy Business Warehouse (LBW) Blueprint Specification May, 2000.
Advanced Metropolitan GIS Plan Final Report Presentation December 14, 2000 Jerry Happel – PlanSight LLC Fargo-Moorhead Council of Governments.
GEOGRAPHICAL INFORMATION SYSTEM (GIS)
1 1 ISyE 6203 Radical Tools Intro To GIS: MapPoint John H. Vande Vate Spring 2012.
A Summary of State DOT GIS Activities Presented at the 2004 AASHTO GIS-T Symposium Rapid City, SD.
Introduction to ArcGIS for Environmental Scientists Module 1 – Data Visualization Chapter 1 – GIS Basics.
Threats Database V4 Model Geodatabase Relation Class Creation and Data Population June 25, 2007 Marlene McKinnon, GIS Specialist.
SLIDE: 1 © COPYRIGHT 2014 MARKLOGIC CORPORATION. ALL RIGHTS RESERVED. Fairfax County Land Development Information web application
North Carolina’s New Statewide Road Centerline Data Sarah Wray, GISP, CGCIOTim Sheldon, GISP Spatial Data ManagerBusiness Analyst Engineering Transportation.
Sep , 2006 v FME Worldwide User Conference - Vancouver FME at the City of Nanaimo: A Home Run Jason Birch & Tim Taylor, City of Nanaimo, BC.
Introduction of Geoprocessing Topic 7a 4/10/2007.
Advanced Higher Computing SOFTWARE DEVELOPMENT PROCESS.
Data Exchange Needs Using ETL Tools. Overview Client Project Issue Methodology Schedule & Budget Results & Recommendations Challenges Acknowledgments.
Patrick Revell Ordnance Survey Research
Introduction to GeoDatabase Lecture
2001 ESRI Petroleum User Group M.J. Harden Associates Inc. PipeView SDE : Delivering CAD to the Enterprise PipeView SDE Delivering ESRI Data to the Enterprise.
Matt Eitrem GIS Coordinator City of Ashland Wisconsin.
1 1 Aeronautical Information Services Brief to AIXM User Group 27 February 2007.
1 1 ISyE 6203 Consolidation Intro to GIS John H. Vande Vate Fall 2011.
MapSync ® Integrated Mapping and Information Solutions Indiana GIS Conference GPS 2 GIS Presented by: MapSync 3815 River Crossing.
UNIT 1: GIS DEFINITIONS AND APPLICATIONS
+ SUH Incorporated Executive Briefing. + SUH Business Opportunity I.T. solutions are needed to improve SUH’s ability to operate Sales Support team would.
Intro to GIS | Summer 2012 Attribute Tables – Part 1.
Introduction of Geoprocessing Lecture 9. Geoprocessing  Geoprocessing is any GIS operation used to manipulate data. A typical geoprocessing operation.
Chapter 7 Enterprise Resource Planning (ERP). Objectives After studying the chapter, students should be able to.. Explain definition of Enterprise Resource.
NASA Marshall Space Flight Center Facilities Engineering Management Office Facilities GIS and Data Integration October 2007 – Rocket City GeoSpatial Conference.
Natura 2000 System Alberto Telletxea Bilbomática under EEA Contractor.
Introduction of Geoprocessing Lecture 9 3/24/2008.
Realizing and Operating Enterprise Systems. Objectives  Outline the realization phase  Discuss transition approaches  Describe enterprise system operations.
MIS 451 Building Business Intelligence Systems Data Staging.
Eddie Curtis Chief Technical Officer Snowflake Software GML Relay with.
The information systems lifecycle Far more boring than you ever dreamed possible!
Anytime, Anywhere Access Benefits Functionality Work Order Administration Dispatch Work Order Work Order Details New Work Order Additional Functionality.
Geodatabase Administration Toolset
AGA MAOP Document Review / PODS Implementation
التدريب الرياضى إعداد الدكتور طارق صلاح.
SDMX Tools Overview and architecture
Database Design Hacettepe University
Presentation transcript:

Migrating a Gathering Company’s Pipelines from Legacy Datasets into an Enhanced PODS 3.2 Model Presented by Kenneth Greer – CenterPoint Energy Gas Transmission

Contents Different type and quality of data sets 1 Conversion tools 2 Obstacles - Short Timeline 3 The Plan 4

Existing data sets – Lotus Notes  Pipe and equipment attributes  Derived from old mainframe data  Poor maintenance 1

 Primary software for field operations  Synchronization already established  Individual file per pipeline  Field GPS of good quality  Excellent maintenance  Field tools already created  No training needed Existing data sets - MapInfo 1

 Scheduling and maintenance  Work Orders  Training needed New data sets - Maximo 1

 Enterprise database  Pipe and equipment attributes  Spatialized  Vendor application  Training needed New data sets - PODS 3.2 enhanced 1

 Used to load and maintain centerline  Vendor application required  Training needed New data sets - ArcGIS 1

 Internally developed loader  Vendor applications  Company developed synchronization applications fro Maximo  Re-stationing process using ArcGIS, MS Access and internally developed loader  Reports generated  Cross reference files maintained in Oracle Conversion tools 2

 Six months  Mismatch of pipeline measures – spatial vs. data  Load all data – active, abandoned, sold, etc.  Not all pipeline data had spatial counter parts  Load and re-station all pipelines  Training Obstacles 3

 Determine pipeline and route status and match to GIS components to determine routes  Load all data to PODS using measures in Lotus Notes  Re-station per GIS lengths  Load to Maximo  Training for PODS and Maximo  Review re-stationing reports  Correct data with the new interfaces The Plan 4

Questions 5