Old Tailing Dump JSC Zyryanovsk Lead-Mining Complex.

Slides:



Advertisements
Similar presentations
Murray River Project Update Coal Forum October 2013.
Advertisements

Case Study 250,000 square foot suburban office building
COST MANAGEMENT Accounting & Control Hansen▪Mowen▪Guan COPYRIGHT © 2009 South-Western Publishing, a division of Cengage Learning. Cengage Learning and.
© Mcgraw-Hill Companies, 2008 Farm Management Chapter 17 Investment Analysis.
Chapter 3 Program Management and Project Evaluation Professor Hossein Saiedian McGraw-Hill Education ISBN
Capital Budgeting and Cost Analysis Chapter 21.
Investment Analysis Lecture: 8 Course Code: MBF702.
© 2009 Pearson Prentice Hall. All rights reserved. Capital Budgeting and Cost Analysis.
Copyright © 2003 Pearson Education Canada Inc. Slide Chapter 21 Capital Budgeting and Cost Analysis.
CAPITAL BUDGETING AND LEASING Chapter 4. Investment The addition of durable assets to a business Disinvestment is the withdrawal of durable assets from.
Program of the NC KazMunaiGaz JSC for the Development of Kazakhstan’s Content for was approved on April 22, To increase the volume of purchases.
Astana - November 2008 “Break Through Projects of the National Company “KazMunayGas”
Capital Budgeting and Investment Analysis
INVESTMENT ANALYSIS PRACTICE PROBLEM. A fertilizer dealer is considering the purchase of a new piece of equipment the will allow him to vary the application.
CHAPTER 21 Capital Budgeting and Cost Analysis To accompany Cost Accounting 12e, by Horngren/Datar/Foster. Copyright © 2006 by Pearson Education.
Chapter 10.
2012 Brick plant construction with annual capacity of 60 million pieces in Buj municipal district of the Kostroma region.
4 C H A P T E R Capital Investment Decisions.
Chapter 3 – Opportunity Cost of Capital and Capital Budgeting
Capital Budgeting Net Present Value (NPV)
ACCTG101 Revision MODULES 10 & 11 TIME VALUE OF MONEY & CAPITAL INVESTMENT.
Furniture shield production in Sharja municipal district of the Kostroma region.
8- 1  2001 Prentice Hall Business Publishing Management Accounting, 3/E, Atkinson, Banker, Kaplan, and Young Capital Budgeting Chapter 8.
Evaluating Financial Investment in IT Projects
2000 Financial Results in accordance with International Accounting Standards.
Energy Economics A synthetic methane plant from coal is to be constructed at a cost of $4 billion dollars. It requires 14,000 tons/day of coal (10,000.
Dairy farm on 1200 head of cattle creation. Project targets are: - to enter the meat and dairy cattle breeding market of the Kostroma region and beyond;
IuliiaGoloborodko. CHAPTER 1. THEORETICAL BASIS OF COST REDUCTION ENTERPRISE CHAPTER 2. BUSINESS ANALYSIS OF DNIPROPETROVSK ASPHALT AND CONCRETE PLANT.
Construction of tourist complex and yacht club (Stage I) in Kherson. Improvement of recreational and coastal urban beach area in Hydropark (Stage 2 ).
Capital Budgeting and Cost Analysis
Scheme of location of objects of the Dehkanabad plant
Lao PDR Area: total: 236,800 sq km Population: 5.6 million GDP - per capita: purchasing power parity - $1,900 GDP - composition by sector: agriculture:
TAOYUAN ENVIRONMENTAL SCIENCE & TECHNOLOGY PARK BUSINESS INVITATION SEMINAR PRESENTATION OF PREFERENTIAL MEASURE & COUNSELING ENVIRONMENTAL PROTECTION.
It is to decide what are the major expenditures or investments a company should make, it’s a method to judge the best investments options to create future.
Production of construction materials: Production of the construction materials on the basis of the equipment MULTIMAT RH 300 (V) A, produced by German.
18 Autumn in Colorado. Economic Evaluation and Sensitivity-Risk Analysis of Zarshuran Gold Mine Project Authors: Kazem Oraee; University of Stirling,
Chapter 3 Financial Management Part 2 BCN 4772 Summer 2007.
Creation of industrial complex for extraction and complex waste-free processing of peat with acquisition of soil modificator «AridGrow» for production.
Accounting 4310 Appendix Capital Investment Decisions.
2012 Investment project of OSB production in Buj of Kostroma region.
Infrastructure and capacity development of the State Enterprise “Sea Trade Port of “Yuzhny”
Chapter 15 Capital Budgeting. Typical Capital Budgeting Decisions Capital budgeting tends to fall into two broad categories...  Screening decisions.
Copyright © 2014 Nelson Education Ltd. 11–1 PowerPoint Presentations for Finance for Non-Financial Managers: Seventh Edition Prepared by Pierre Bergeron.
Mining project evaluations A synopsis. Factors affecting the evaluation Geology, resources and reserves Process, plant and equipment required Environmental.
GOVERNMENT OF THE KINGDOM OF LESOTHO Water and Sewerage Company (WASCO) Greater Maseru Water Supply Feasibility Study & Preliminary Design Results of Financial.
COAL MINE PROJECT OPPORTUNITY NALAIKH MINE POWER GENERATION AND HEATING PROJECT TSAGAAN SHONKOR HOLDING COMPANY NALAIKH DISTRICT, MONGOLIA OVERVIEW OF.
CAPITAL BUDGETING DECISIONS CHAPTER Typical Capital Budgeting Decisions Plant expansion Equipment selection Equipment replacement Lease or buy Cost.
CAPITAL BUDGETING TECHNIQUES 1 Capital Budgeting Techniques. A number of techniques used to analyze the relevant cash flows to asses whether a project.
TPP Stanari “First ‘new generation’ TPP in SEE”. Location: about 70 km east of Banja Luka and 25 km west of Doboj.
Erdeneburen HPP Project Implementation Unit
Income Taxes and the Net Present Value Method
Net Present Value and Other Investment Criteria
Financial terminologies
PROBLEM SOLVING.
Capital Budgeting and Cost Analysis
Chapter 12 - Capital Budgeting
Capital Budgeting and Cost Analysis
Feasibility study of Gol-Gohar iron ore open cast mine operation of Iran Professor Kazem Oraee Stirling University - UK.
Tavis Karnes.
Capital Budgeting 2 2.
“Caucasus Power Transmission Network’’ (Armenia-Georgia overhead transmission line/substations) Loan Project.
Capital Budgeting and Cost Analysis
Mini dairy plant construction
Chapter 7 Cash Flow of Capital Budgeting
Apprising corporate strategic decisions
Other Long-Run Decisions
Financial Appraisal of Project
Seminar – Question 1 Gamma Ltd is considering the selection of one of two mutually exclusive investment projects. The two projects would involve purchasing.
Guidance for 2018* Q3 2018: Financial net: around -200 million
Chapter 8 - Cash Flows and Other Topics in Capital Budgeting
Presentation transcript:

Old Tailing Dump JSC Zyryanovsk Lead-Mining Complex

Area of the geologic removal = 1.31 sq. km. Tonnage of the reject materials = 36 million tonnes The report on evaluation of mineral resources was compiled in accordance with the JORC Code by JORC Consulting company, the project leader – Andrey Krasnykh, member of the Australian Institute of Geoscientists (AIG)report on evaluation of mineral resources (Membership 4035)

-Magma West LLP has fully completed the exploration of the deposit -On February 8, 2012 there was a memorandum on investment of 100 million euros in the project signed with German company DEB Deutsche Erze Beteiligungs AGmemorandum on investment -On April 24, 2012 Magma West LLP (Astana), Di- As Company Ltd (Zyryanovsk) and DEB AG (Bad Homburg) signed the trilateral contract on joint- activities (consortium).contract on joint- activities

-In compliance with the subsoil contract and the agreements reached, there were over 5 million U.S. dollars invested in the project in the period from 2005 to In 2013 – 2014 – planned transition to the pilot production (gravity concentration) in 2 stages -In case of positive results - > Construction of the processing plant with the combined scheme of concentration

As of today: -Process regulations, technical project and preliminary environmental impact assessment (EIA) have been already developed, agreed on and approved by the relevant authoritiesProcess regulationstechnical project (EIA -Project of the evaluation works, with the section devoted to the pilot production has been already developed and is in the process of being approved

As of today: -The is a state license obtained for design works (technological) and (or) operating of mining, petrochemical, chemical productions and other activitiesstate license -Power line and integrated transformer substation were built

As of today: The equipment for gravity concentration was installed and debugged.

A standard set of equipment and machines for the first stage of processing 1 excavator Hitachi ZX400LCH-3 1 loader Brenner dump trucks HOWO 6x4ZZ3257M364W Hangar2 concentrators ITOMAK (KGM-10 и KGM-40 DK) 1 scrubber-washing drum SB5

Approximate cost of the standard set of equipment and machines for the first stage of processing EquipmentNumberPrice (USD) Amount (USD) Excavator Hitachi ZX400LCH Loader BRENNER Dump truck HOWO 6x4ZZ3257M364W Hangar Scrubber-washing drum SB Concentrator ITOMAK KGM Concentrator ITOMAK KGM-40 DK Pumps, electrical equipment and other auxiliary equipment TOTAL:

Expected financial indicators Expected financial indicators on the first stage of the production (gravity concentration): -Annual volume of extraction = 350 thousand tonnes -Gross annual income = U.S. dollars -Net annual income = U.S. dollars -Taxes and payments to the budget per annum = U.S. dollars -Number of jobs created = 49 - Average salary = 600 U.S. dollars

A standard set of equipment and machines for the second stage of processing 2 excavators Hitachi ZX400LCH-3 2 loaders Brenner dump trucks HOWO 6x4ZZ3257M364W 2 hangars 4 concentrators ITOMAK ( KGM-40 DK and MKG- 120) 1 dredger Hydromec 2000Eh 2 scrubber- washing drum SB-22 4 jig units MOD-2 4 Hydraulic cyclones GTSR-500

Approximate cost of the standard set of equipment and machines for the second stage of processing EquipmentNumberPrice (USD) Amount (USD) Excavator Hitachi ZX400LCH Loader BRENNER Dump truck HOWO 6x4ZZ3257M364W Hangar Scrubber-washing drum SB Concentrator ITOMAK MKG Concentrator ITOMAK KGM Dredger Hydromec 200Eh Jig unit MOD Hydraulic cyclone GRTS Hydraulic cyclone set CAVEX Pumps TOTAL:

Expected financial indicators on the second stage of the production (gravity concentration): -Annual volume of extraction = thous. tonnes -Gross annual income = U.S. dollars - Net annual income = U.S. dollars - Taxes and payments to the budget per annum = U.S. dollars - Number of jobs created = Average salary = 600 U.S. dollars

Third stage – construction of the plant with the combined scheme of processing (the pre-feasibility studypre-feasibility study has been already developed) - Net present value (NPV) = U.S. dollars -Internal Rate of Return (IRR) = 38.8 % -Discounted Payback Period = 4.3 years The calculations were made with a very conservative price for gold.price for gold