Marzo 2004Flavio Dal Corso INFN-Pd1 Status of Drift Tubes Local Trigger Electronics.

Slides:



Advertisements
Similar presentations
Questionnaire Response
Advertisements

Marcello Lunardon - ALICE SPD Meeting 04/02/2003 Problems to be studied Test protocol Thermal conductivity tests What next STATUS OF GLUING AT
Flavio Dal Corso - INFN Padova1 OPERA coll. meeting - Hamburg 3 July 2004 RPC & XPC Electronics Status Front End Boards (FEBs) Controllers HV system Crates.
19 Sept 2005Flavio Dal Corso INFN-Pd1 MiniCrates Status Components Status (BTIM, TRB, CCB, SB) MC production: quantity and rate, past and future Production.
Marzo 2004Flavio Dal Corso INFN-Pd1 Results from May 2003 Test Beam First test of all the electronics integrated in a MB1 Minicrate Items tested: Hardware.
Aprile 2004Flavio Dal Corso INFN-Pd1 Drift Tubes Local Trigger Electronics Boards Production Status.
1 5 Packaging Intro Ken Gilleo PhD ET-Trends LLC 44%
IPC-2221 Conformal Coating Types and Thickness
CMS Tracker Week, CERN, July July 2003Tracker Week - Module ProductionSalvatore Costa - Catania Executive summary from Bonding WG Meeting.
CMS FPIX Reinstallation/Commissioning Lorenzo Uplegger 4/20/091.
Fgasparini LHCC Review May 041 SUMMARY: Latest results on the Minicrate performance Status of chamber production Torino line The High Voltage Boards problem/status.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
Activities Status and Plan for the week D. Giugni / INFN Milano D. Giugni Monday Meeting
November 16, 2001 C. Newsom BTeV Pixel Modeling, Prototyping and Testing C. Newsom University of Iowa.
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
Pixel Upgrade Status and Plan G.M. Bilei Firenze Mar. 6 th 2013.
SALTRO TPC readout system Presented by Ulf Mjörnmark Lund University 1.
Team Parro Project HUSP. Team Members Jason Rollins – Project Manager / Electrical Design Jason Rollins – Project Manager / Electrical Design Shawn Mullins.
Pixel/IBL status and plans A.Rozanov A.Rozanov ATLAS-France
THEMIS SCM CDR MC VASSAL - 3D PLUS CETP 04/08/ Preamplifiers in 3D Technology EM manufacturing Part list and component Lot Acceptance Tests FM manufacturing.
The LHCb Outer Tracker Front End, what does it look like and what is the status Talk for the LHCb Electronics Working Group /TS A Collaboration.
Flavio Gatti,Frascati-PSI, Jan 31 th, 06 1 TC status. Flavio Gatti UNIVERSITY and INFN of Genoa, Italy.
ATLAS PIXEL SYSTEM OVERVIEW M. Gilchriese Lawrence Berkeley National Laboratory March 11, 1999.
1 DT critical items status: HVBoards Control and Trigger Boards Assembly in Torino fgasparini june 2004.
November 12, 2001 C. Newsom BTeV Pixel Modeling, Prototyping and Testing C. Newsom University of Iowa.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
Status of NA62 straw electronics Webs Covers Services Readout.
John Coughlan Tracker Week October FED Status Production Status Acceptance Testing.
Tracker meeting – July, 2006 TBS – TPSFE FM/FS tests Lucio Accardo, INFN Perugia.
Interconnection in IC Assembly
MFT WG5: ladder disk and global assembly Stéphane BOUVIER & Sébastian HERLANT MFT WG7: Mechanics and Thermal studies Jean-Michel BUHOUR & Emili SCHIBLER.
Vibrationdata 1 Unit 32 Circuit Board Fatigue Response to Random Vibration.
Status of the PMT light detection system Gian Luca Raselli 20-AUG-2015 ICARUS executive meeting.
Marcello Lunardon - ALICE Gluing Meeting 010/03/2003 Study of glues for the assembly of the ALICE Silicon Pixel Detectors Status at The PADOVA.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
Trigger Commissioning Workshop, Fermilab Monica Tecchio Aug. 17, 2000 Level 2 Calorimeter and Level 2 Isolation Trigger Status Report Monica Tecchio University.
CM19 Vassil Verguilov DAQ Status  Progress  DAQ  Next steps  Summary.
March 19, 2013W. Bertl, PSI Status of BPIX Cooling Activities W. Bertl, PSI.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
MEMS Packaging ד " ר דן סתר תכן וייצור התקנים מיקרומכניים.
ALICE SSD 20 May Yalta G-J Nooren ALICE SSD status.
9/12/2003Ivan Hruska1 First box prototype –Box design in July ‘03 –Box produced during August ’03 Tested last week in few fingers Small changes necessary.
STATUS ON Optical fiber: Preliminary tests on Optical Fiber and Fiber Optic Feedthrough Massimo Rossella, Marco Prata, Tommaso Cervi INFN, Sezione di Pavia.
WP7&8 Progress Report ITS Plenary meeting, 10 June 2014 LG, PK, VM, JR.
Proposal for ESS DTL Roadmap. Divide Into Four Phases 1.Conceptual Design Phase (In progress) 2.Technical Design Phase 3.Prototyping Phase 4.Construction.
DOE CD-2/3a Review of the BTeV Project – December 14-16, BTeV Pixel Detector Pixel Module Assembly and Half-Plane Assembly Guilherme Cardoso James.
Optical Calibration Updates Presentation for SK-UK Meeting 2016 Neil McCauley, Lauren Anthony, Adrian Pritchard, Joachim Rose 1.
Solving Microelectronic Obsolescence Through Die Reclamation, Re-Assembly & Test A Proven Solution to Provide Management Support for Diminishing Manufacturing.
PACKAGE FABRICATION TECHNOLOGY Submitted By: Prashant singh.
Origami and Cooling 24th September 2012 C. Irmler (HEPHY Vienna) Joint PXD and SVD Meeting Göttingen.
Development of the readout electronics a status report Leif Jönsson Collaboration meeting Santander
Week 22: Schematic Week 23-Week 27: Routing Gerber files have been available since 9th July 1st prototype: – PCB manufacturer: supervised by KIT – Cabling:
2 protos in MASER (One in Valencia, One sent to Nikhef)
Procedure for MCM rework on tray MID 070
Integrated Circuits.
II- NONMETALS Plastic materials Ceramic materials
ESR for the muon DT Minicrate System
(Remember Airway, Breathing and Circulation)
Ladder Assembly All tools and jigs produced Glue dispensing works
Studies of Padova Perugia 16 June 2009 Flavio Dal Corso INFN-Padova.
T1 Electronic status Conclusions Electronics Cards:
CMS November Upgrade Week
DT Infrastructure: LV, HV, Gas
Far Detector Activities Late 2017 – Early 2018
Preproduction Status & Results
CMS Goal of the experiment
HV Imon in 1th MTCC period
ECAL Electronics Status
SBS Front Tracker GEM short update on inefficient sectors
US Module Testing Progress Report
Presentation transcript:

marzo 2004Flavio Dal Corso INFN-Pd1 Status of Drift Tubes Local Trigger Electronics

marzo 2004Flavio Dal Corso INFN-Pd2 Multichip Ceramic Module: 4 BTI per module. Production in progress by Metallux Almost half production done. –1600 modules delivered to Novatel for board production. –4000 modules ready for delivery in stand-by at Metallux BTIM

marzo 2004Flavio Dal Corso INFN-Pd3 Problems: About 6% of BTI chips lost during production setup (of modules and boards), against a spares total amount of ~22%. Production stopped due to problems discovered during board production starting up: –About 1,5% of modules, nominally tested by Metallux, was discovered not working properly. –The epoxy resin used to glob top the chips, although tested with thermal cycling, was not able to survive at the high temperature (~220 °C) of the soldering oven.

marzo 2004Flavio Dal Corso INFN-Pd4 Action taken: 2500 modules, already delivered by Metallux, was sent back for re-testing. R&D started by Metallux for a new resin. At the moment they are investigating two new products; a siliconic glue and a stronger resin. Results will be available very soon. The modules already done will be soldered on the TRB by hand. Independently we are investigating the possibility of protecting the chips with a plastic cover. This seems technically feasible, but put additional questions: as the seal can’t be hermetic, which are the long term effects of humidity and oxygen on aluminum wires and pads?

marzo 2004Flavio Dal Corso INFN-Pd5 Trigger Boards. Production in progress by Novatel First production (50 prototypes) lost for BTIM failure. Second prototypes production partially successful (rejection ratio of ~20%) A third production is in progress; we will have about 50 TRB-Φ, 20 TRB-Θ and 10 TRB-Φ-32 at the beginning of April. TRB

marzo 2004Flavio Dal Corso INFN-Pd6 Control Boards. Prototypes production in progress by CAEN Production awaiting for QPLL availability. 40 prototypes will be available at the beginning of April CCB CCB link